Response to Info Request - Planning Response MCU18-0015 & RAL18-0001 · MCU18/0015
Item 23 – Provide a Bushfire Hazard Assessment which documents to likely future risk bushfire will
present to the proposed development and provide methods which would reduce the risk to people
and property to an acceptable level to meet the requirements of the State Planning Policy July
2017.
Response – Included at Attachment 7 is a Bushfire Hazard Assessment which undertakes an
assessment of the on site vegetation and surrounding conditions. The report recommends a
vegetation setback be provided to unmanaged vegetation to facilitate a construction level of BAL
19 for units 1 and 2 and BAL 29 for Units 3-12 and the dwelling houses. Trees within this setback
zone are able to be retained subject to management of the canopy understorey occurring. It is
proposed that the bushfire management procedures would form part of the Community
Management Statement for the dwellings. Any future rehabilitation plan prepared would be
mindful of the need for planting species to be low flammable species to minimise the risk of
bushfire risk to the site and surrounds.
Item 24 – Conduct a water quantity assessment following appropriate methods found in the ARR16
and QUDM guidelines and provide a report that clearly states methods, assumptions, results and
solutions to show how the impacts of the development will be mitigated.
Item 25 – Conduct water quality modelling and reporting to the standard required in the relevant
guidelines, policies and codes. Address the Noosa Plan Water Sensitive Design Code to demonstrate
that the development will comply.
Response – The Engineering Report included at Attachment 4 undertakes a comprehensive
assessment of water quantity and quality measures in accordance with current best practice
standards. In terms of quantity the proposed development will not cause an actionable nuisance
for downstream properties. An underground SPEL tank is proposed to treat stormwater from the
proposed unit site to ensure it meets required target pollutant load reductions.
Item 26 – Provide traffic assessment by suitably qualified and experience RPEQ of the increase in
traffic and its impact on the traffic flows and safety at the intersection of Attunga Height with
Viewland Drive and the intersection of Viewland Drive with Noosa Drive, particularly during peak
hours traffic. The assessment should include any proposed traffic management measures and/or
roadworks improvement at these two intersections.
P: 07 5452 5207
E: [email protected]
45 First Ave, Mooloolaba Qld 4557
PO Box 1043 Maroochydore Q 4558
Page 9 of 19 townplanningsunshinecoast.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info Request - Planning Response MCU18-0015 & RAL18-0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 649 KB (small file)
- File type
No other editions are linked here.