Skip to the record
Search everything, all in one place.

Original source · versioned page text

2018-12-17 General Committee Agenda

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 42 of 44

ACTIVE TEMPORARY POSITIONS                                                                                                                                                                    eee a

 Special Projects Advisor         Corporate Services      Director's Office              Temporary Full Time               In 2017 the CEO approved temporary changes to the structure in the Financial Services
                                                                                         (01/10/18 - 30/09/21)             Branch including the creation of a temporary full time position of Special Projects Advisor
                                                                                                                           and the secondment of the occupant of the Financial Accountant position to the new
                                                                                                                           temporary role. The secondment was initially for an 18 month period to facilitate the
                                                                                                                           delivery of Council’s CiAnywhere Enterprise Budgeting system however the term of this
                                                                                                                           position has been extended for a further 3 years to meet project demands.
                                                                                                                           Salary provision exists within the current capital budget for this position and will be
                                                                                                                           proposed for inclusion in the build from base budget 2019/20.

 Procurement and Contracts        Corporate Services      Procurement and Fleet          Temporary Full Time               The creation of the temporary full time position of Procurement and Contracts Advisor
Advisor                                                                                  (14/8/18 - 13/8/19)               was an approved PMI in the 17/18 budget. Approval is sought to convert this position
                                                                                                                           which was originally approved for 2 years to a permanent full time position, refer to the
                                                                                                                           report. The role is required on a permanent basis to continue the required level of
                                                                                                                           specialist procurement support to the organisation.
                                                                                                                           Salary provision exists within the current budget for this position and a submission will
                                                                                                                           be made to the 2019/20 budget process.
 Project Manager                  Environment and         Strategic Land Use Planning    |Originally Temporary Full Time   {Approved OM 17/12/15, relates to Noosa Planning Scheme. Note: this position is
                                 Sustainable                                             (15/2/16 - 30/6/19)               currently vacant with the resignation of Project Manager. Project Manager project
                                  Development                                                                              management responsibility assigned to Principal Strategic Planner.
                                                                                                                           Salary provision exists within the current capital budget for this position.
 Project Support Officer          Environment and         Strategic Land Use Planning    |Originally Temporary Full Time   {Approved OM 17/12/15, relates to Noosa Planning Scheme.
                                 Sustainable                                             (6/6/16 - 28/6/19)
                                  Development                                                                              Salary provision exists within the current capital budget for this position.
 GIS Officer                      Environment and         Strategic Land Use Planning    |Temporary Full Time              Approved OM 17/12/15, relates to Noosa Planning Scheme.
                                 Sustainable                                             (3 years - 01/02/16 - 28/06/19)
                                  Development                                                                              Salary provision exists within the current capital budget for this position.
 Principal Strategic Planner      Environment and         Strategic Land Use Planning    |Temporary Full Time              Approved OM 17/12/15, relates to Noosa Planning Scheme.
                                 Sustainable                                             (3 years - 19/10/16 19/10/19)
                                  Development                                                                              Salary provision exists within the current capital budget for this position.

                                                                                                                                                                                              Page 42 of 44
Log in to download the original file

2018-12-17 General Committee Agenda(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.