Original source · versioned page text
2018-12-17 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 17 DECEMBER 2018 RECOMMENDATION That Council note the report by the Development Planner to the General Committee Meeting dated 17 December 2018 regarding Application No. MCU16/0044.01 to make a minor change to an existing approval for Commercial Business Type 1 Office, Entertainment & Dining Business Type 1 Food & Beverages, Wellbeing Type 2 - Social and Open Space Type 1 Sport & Recreation situated at 253 & 255 David Low Way and 5-7 Rufous St, Peregian Beach and: A. Approve the change. B. Amend condition 2 to read as follows: 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date SD A Site Plan, prepared by Sparks Architecture 1.2 SD A Site Plan - Stage 1, prepared by Sparks Architecture 1.2.1 Community House GC 10 01 Site and Roof, prepared by Flexure Architecture and 12 November Urban Design 2018 GC 10 01 Ground, prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 Basement, prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 North Elev., prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 West Elev., prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 East Elev., prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 Section 1, prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 View 3, prepared by Flexure Architecture and Urban 12 November Design 2018 GC 10 01 View 3, prepared by Flexure Architecture and Urban 12 November Design 2018 Digital Hub SD B1.1 Ground Floor Plan, prepared by Sparks Architecture SD B1.2 First Floor Plan, prepared by Sparks Architecture SD B1.3 Roof Plan, prepared by Sparks Architecture SD B2.1 North Elevation, prepared by Sparks Architecture SD B2.2 East Elevation, prepared by Sparks Architecture SD B2.3 South Elevation, prepared by Sparks Architecture SD B2.4 West Elevation, prepared by Sparks Architecture SD B3.1 North Elevation, prepared by Sparks Architecture SD B4.1 Perspective, prepared by Sparks Architecture C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016. Page 5 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.