Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

0014CBAC.001

of 29

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

-  INTEGRATEDPLANNINGACT 1997_—                                                                 aS Assessment Checkist, Version 18.0, 10 Novernber 2008 He
 "Operational works in aitiiajarea.or' 9. . The application involves operational work that Is (ck the applicable baxies) _                oR
     a Soest      atoemnent dit eee              -  C1)      tidal work as defined under the Coastal Protection and Management Act 1995 (the                  ee
      >  Bian    aeteeciera web: |                     7     Coastal Act) that isnot prescribed tidal work - complet Pat M of Form 4; Of                       _
        apne au     ie yee hows                         (ji) tidal Work that is prescribed tida! work" other than in a canal? -complete Part PofFom f:or
   .    ans nts roy are ree Te Meck Bln wetg Beta ye,            2        net e    :       .     -  .     =    .         .        .   ,   ,          .
        7 dboliction requires assessment byihe:: -<<'r"."| . ([] (ill) carried out within a coastal management district under the Coastal Act and for - complete
       " Eibmentl Protein Aaah   (EPAV ©                     Part M of Fort 1 if any box/es (a) to () below are tked.
     -  tif aregency ober tian EPA the acess: 73                           ru                         in  a watert       stween  MHWS     a
        ¥ iaiagel forthe Sppiicabon’ EPA ig 4 concureace |   (] (a)   constructing or installing works in a watercourse between MHWS and HAT (Le.
        «ae   frie potion    ela    Os at                   |    +   other than those works in tidal wate) where the development has been determined riot
     _  $LOGél wéinnien is the ascaesinent ange etal   -      .       fo be assessable against the Water Act 2000;
      * [prescribed IdM ABNC AEROS S)                                          ntite                   ante                a
        SERRE ORES a Arias      EEN ee     a                 [J (b)   constructing a canal'2 intended to be connected to tidal waters;   -
        ES Sasi isi ga                 Raa                           .         ae        “at         :       :              .           .
        cee                          eas               -     [J (e)   ‘constructing an artificial waterway;                a
        Seabee gs ROR Sn           ean  eG Re                 -           te og     a4         y)          ,       cote               ,
       nn eee Bee                                            (_]{d)   reclaiming land under tidat water,
        Biba: eee                                            [_]{e)   disposing of dredge spoil or other solid waste material in tidal water; ’       =:
        ERE LISP ASR EAR NR      EEE BS             :                “a    aefnet ean aac         .                            ave  hi
        beri  “a Ca        OO          Re oo                 (J (f)  interfering with quarry material on State coastal land above high-water mark:
   a     SST       SER                           -           [J (g)   draining oF allowing drainage or flow of water or other matter across State           ,
      Es        RR         Ae ne                                     - coastal land above high-water mark;                                    :            oe
        eee     Se ae a                                -     L1(h)    removing or interfering with coastal dunes on land, other than State coastal land,
      | GR Rev ih ce eee ee es REE a    Saat                      )     removing or interfering wi                                 i
            ee           eee    ass        SS              -          that is in an erosion:prone area and above high-water mark; -
       . WE  abe oe sath           rl sy   eRe              FT                 ay              .                ne              a
        Bae eh                                   *     -*   {] (i). constructitig a bank or bund wall.to establish a ponded pasture on land, other
-    @. “! oe he                                        oe           than State coastal land; above high-water mark: or            oo                          3
        LM) none ofthe abe,                                                                        se cena                cst pe                 ssc,        |
  :   EQueratonal Wark Below RG Malet          40.  The application involves operational work that is: ( tick the appiicable box/es)       oe
       ; ae ue ee ee                               “CI () tidal work's as defined under the- Coastal Protection and Management Act 1995 {the         -.
     "ligation   about pfedribied bak wortcht otal =      ’ Coastal Act) that is not prescribed tidal work — compiete Part M of Form 1; or
      . “Uns you Le   ugeee we                   _- WI (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF -          '
       {Repeat      ag   ol Gust                     (J (iii) carried out within a coastal management district'S under the Coastal Act and for - °         .
        eon Tene ae.      : eae          acs            -   [J (a)   disposing of dredge spoil or other solid. waste material   tidal water — complete Part
       {Lota goveinmentis thé dssébsmesi{nailager fora      -       Mof Form 1,
           eal Wawo               : ~    oN                 [7] {b) - reclaiming land under. tida! water — complete Part MofFonn f;0r  =|
;      fo                            i  “stl”               EV (6)  constructing a canal", if the canal is associated with reconfiguring a lot - complete
      Bra    ot,              TP,                                "Part Mof Form 1;    ~                                :               Ll.
  ogee                      8 nO ESS            SZ] (iv) - none of the above.              .                                     .
:     -SGoastal anagénient”       " ~ "-""]14.      The application involves: (tick tha appficable boxes)                         0        i          ,
     + primer iomaton refer te Gude18"- - |” (1 (i) - amaterial change of use assessable under a planning scheme involving operational                        .
       Shee te ee eS ieee |                                _ work carried out completely or partly in a coastal managementdistrict'§;                  ti
                       tonne EPA                                                                    under  a planning scheme involving buiiding —
        Spvicmmentat Protection Anencr(EPA.. ° |    {7} (i)  a material change of use assessable under a       planning scheme involving   buildin
     Re ss re oihes Te hr Ene, do                            work, carried out completely or partly in a coastal management district that is -             a
          ney lor the apfiication in rettion to this matter. | " » the construction of a new premises with a GFA” of atleast 1000m2            .        a
         ,                                   an              ». the enlargement of the GFA of existing premises by more than 1000m2
       ho,                     .                    (1 (ii)  reconfiguring a lot assessable tinder schedule 8 of the IPA where the land is situated.
       on                     .            an         ,      completely or partly in a coastal management district
 So                                          |      Ci fivy  reconfiguring a iot!® assessable under schedule 8 of the IPA: and in connection with
      o                      mo                              the construction of a canal'® ~ complete Part M of Farm 1
    oo                   a                              (¥)  mone ofthe BOVE                 eee ep ee                       ce                           |

       10. Tidal work is defined in sch 10 of the IPA                                                                                   ,             a
       MW Prescribed tidal work is defined in the Caasta! Protection and Management Regulation 2003 and includes certain tidat works completely or partly wilhin a local government dal area, ,
       12 Canal means canal as defined under the Coastal Protection and Management Act 1995            .   :            :
       13 Tidal work is defined in sch 10 of the (PA                                          _
       14 Prescribed Uda work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parily within a tocal government tidat area
 “     6 Coastal management district is defined in sch 10 of the IPA and means a coastal management districl under the Coastal Protection and Management Act 1995, other than an area declared as 9
        coastal management district under section 47(2) of thal Act. .         .                                             ‘        _              .
       1§ Canal means canal as defined under the Coastal Protection and Management Act 1995     .          ,                                   Se
       17 GFAis defined in sch 14 of the IPA to mean the grass floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application Is being assessed.
       18 Under 117 of the Coastat Protection and Management Act 1995, an appfication for reconfiguration, where thé reconfiguration is associated with the construction of an arfificial waterway, musibe -
        accompanied by the application for the operational works to construct the arfificia! waterway. . .  mo                                           ,
        :                  :                                                     Page4:    .      .                                                          ae

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0014CBAC.001.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.