Council archive · source document
0014CBAC.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
: INTEGRATED PLANNINGACT 1997, oe . *_"_-_IDAS Assessment Checklist, Version 18.0, 10 November 20. Ges
“Were and HIE] 22. The pplication inves: te eet bx = Ce
“Eres Wehrle a is area - C1 (i) a-material change of use assessable against the planning scheme for a purpose ne
, - Mrangport lca ee eb : 7 , oo . wee
“Un IRA# sofedile 20 De Ie Rerutaton a, , . ‘enfioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that 8
- Unless ye disterel “one ofthe sbovestie: 2] Schedule. - : .
| ibileaibi ones iene Cres geoncmmencge| oo So
ee ve eee a) (h(i) reconfiguringalom—
. AME Oe es _ . (J) _ ontand that is completely or partly within a public transport corridor, and the
ES) tal umber ofttsincteases, -
Sie ee oo, (1b) ontand thatis completely or partly within a future pubfic transport corridor or
Besos ER Se aare (}{c) -on land that is within 400m of a public passenger transport facility ora future
par Sone RE 7 ____ public passenger. transport facility, and the total site area is 5000m? or greater, .
TREES Gee ne - - [(}(d) > fora residential purpose within the 25 ANEF contour for an airport; .
co poo at ee os i — C)(@)__ fora residential purpose resulting in 100 or more allotments. =. .
. Sea es -. (0) ii) operational work assessable against the planning scheme, but not associated witha = -
Z ie __.” “material change of use mentioned in (i) above or reconfiguring a lot mentioned in (i)"
| oe ee a | above, on land that— : | es
oe “(1 (@)_ is completely or partly within a public transport corridor or a future public’
Cee ere | ______ transport corridor, —_ oa
or Ce fh. C1 (b) wil result in work that encroaches into an airports operational airspace.
a oprome ont 2h ee emenmamssnmrionnnstnuninas,
o Ey ean ‘23. The application involvés: (tick the applicable bowes)— ne ee
o shone a Bie ou ee reuibon {L) (i) a material change of use assessable against the planning scheme for a purpose ,
Loe eure he: se mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
, —-«-HRRPIRone etenekto ata etencurence:/. === Schedule: , 7 - .
REO ee) (] (i) reconfiguring alot—
BNE | 0 BE oo {J} (a) _ on land that is completely or partly within’a future public transport corridor,
OEE SS ogee pend co] 1" future railway land or a railway tunnel easement,
Sgt cre. ARIS pe ’. (Jb) on fand that is within 400m of a Citytrain passenger railway station or a future:
EE a 7 “” Citytrain passenger railway station, and the total site areais 5000m2or =~ .
Cop greater; re’
SO (JT {c) on fand that abuts rail corridor land, commercial corridor land or future railway
a a ee land, and the total number of lots increases; - o -
re . [_] (d) - on tand that abuts rail corridor tand, commercial corridor tand or future railway -
PRD 8 ese SES Tete Pre land and an easement abutting the corridor or future railway land is created; .
(0 BRS SE ioe gis Gk BAe el] - (J €) | ontand that is completely or partly within 100m of; and abutting an approach
, Te - '. "+. to, a railway level crossing, and the total number of lots increases; -
EMBL st Be MACE AP vad - (1 (8 for a residential purpose resulting in 100 or-more allotments, a
i an - (_] (ii) operational work assessable against the planning scheme, but not associated with a
@.... ie hapa cone Pee matetial change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
Dor vi ST , above, involving extracting, excavating or filling greater than 50m3, onlandthat- st;
ea a fe {J (a) ” is completely or partly within rail Gorridor land or commercial corridor land, and
. uo BO , yo. the work is not for rail transport infrastructure or other rail infrastructure;
a a ~ (J (0) _ is completely or partly within future railway land, or a railway tunnel easement,
ee ef (c) abuts rail corridor land, commercial corridor tand or future railway land, and
De ee, qo ih. the work is within 25m of the railway boundary. . . .
BL iv) none of the above. ee
'_“‘Mooriiésto:Brisbane pipeline.“ | 24. The application involves the easement for the construction or operation ofthe Moonieto
> Ror take inbimationsefer to Setiedule 2of the (P Brisbane strategic pipeline, and involves: (tick the applicable box/es}— - tes
‘ieee snone otthe‘dtove’ the (J (i) a material change of use assessable against the planning scheme andnotassociated
"Application Wiggers referral to the holder of pipeline : - with reconfiguring a lot, and any structure or work will be located wholly or partly in the
“lcariog No.1 Gil ari ie Fes Act 1923, easement. oo Loe _
. cay Saito ONT Ply Lifer aie ~ (1 (ii) reconfiguring a tot .
an oot _ 1° [J Gill) operational work assessable against the planning scheme, thats filling, excavation,
, wre Sep tk ee i work is located wholly or partly in thé easement. - 0
Bs Coot . compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the :
ET se 8s. 7 -B] (ivpnone ofthe above. ym, oe
| pmyes . -See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014CBAC.001.pdfRelated documentPublic source context ↗
07/0676 - Op Works - Timber jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.