ore}
7. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe .
access to or from neighbouring structures.
8. Any ship moored or dry berthed at this structure must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall - 5.0 metres N/A .
Beam - 2.0 metres
9. The contractor must construct the jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
. met. ; :
@ The above conditions must be included in your application to the assessment manager. :
This agency will also forward a copy of this letter to the Assessment Manager. |
Yours sincerely
v ag
Captain Richard C Jo is ; : }
Regional Harbouy Master (Bri ane)
Maritime Safety Queensland Page 2 of 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014CBAC.001.pdfRelated documentPublic source context ↗
07/0676 - Op Works - Timber jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.