                                                                                  Officer:            Nadine Gorton
                                                                                  Direct Telephone:   07 5329 6215
                                                                                  Our Reference:      RAP22/0012
                                                                                  Your Reference:     n/a

               14 November 2023


               RL Jackson
               C/- Adamson Town Planning Pty Ltd
               PO Box 894
               COOROY QLD 4563
               [email protected]



               Dear Sir/Madam,
                                         Amended Referral Agency Response
                                                        Planning Act 2016

               I refer to your recent request seeking changes to Council’s Referral Agency response and advise
               that Council decided your requested amendments on 3 October 2023.
               Details of the amended referral agency response are as follows:
               1.      APPLICATION DETAILS

                   Application No:              RAP22/0012

                   Street address:              320 David Low Way, Peregian Beach

                   Real property description:   Lot 219 P 93111

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      TYPE OF DEVELOPMENT

               The application seeks the following type of development approval:
               •       Concurrence Agency Response for Dwelling House
               3.      REFERRAL AGENCY DECISION DETAILS

               In relation to the request, Council decided to approve the requested amendments. Details of these
               amendments are as follows:
               A.      The representations be agreed to; and
               B.      Agree to amend condition 13.
               4.      REFERRAL AGENCY CONDITIONS

                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.



               ABN 97.969.214.121                                                                PO Box 141
               noosa.qld.gov.au                                                           Tewantin QLD 4565
               [email protected]                                                           07 5329 6500
                                                                                                           Page 1 of 5
Document Set ID: 22604302
Version: 4, Version Date: 14/11/2023
Log in to download the original file

Amended Referral Agency Response RAP22 0012 [As Published].pdf · 111 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 4 pages

Page 2

                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.         Rev.    Plan/Document Name                              Date

                        050.00- 050.05   I       3D Views prepared        by   Shaun     Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        100.00           I       Site Plan prepared by Shaun Lockyer Architects 25 Aug 2022
                                                 Pty Ltd

                        200.00           K       Floor Plans prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        200.01           K       Floor Plans prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        200.02           K       Floor Plans prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        210.00           I       Floor Plans prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        300.00           G       Elevations prepared     by    Shaun     Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        300.01           G       Elevations prepared     by    Shaun     Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        300.02           G       Elevations prepared     by    Shaun     Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        300.03           G       Elevations prepared     by    Shaun     Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        310.00           D       Boundary elevations prepared       by    Shaun 25 Aug 2022
                                                 Lockyer Architects Pty Ltd

                        310.02           D       Boundary elevations prepared       by    Shaun 25 Aug 2022
                                                 Lockyer Architects Pty Ltd

                        400.00           D       Building section prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        400.01           G       Building section prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        400.02           G       Building section prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd

                        400.03           G       Building section prepared by Shaun Lockyer 25 Aug 2022
                                                 Architects Pty Ltd




                                                                                                 Page 2 of 5
Document Set ID: 22604302
Version: 4, Version Date: 14/11/2023

Page 3

                        400.04            G       Building section prepared by Shaun Lockyer 25 Aug 2022
                                                  Architects Pty Ltd

                      Building Height
               3.     The maximum height of the development must not exceed 8m apart from a small section of
                      roof in the north east corner which may be 8.2m above the finished ground level and the
                      natural ground surface.
               4.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      building does not exceed the maximum heigh requirements of this Decision Notice.
                      Privacy Screens to Rooftop Terrace
               5.     Privacy screens a minimum of 1.8m high must be installed along the level 2 rooftop terrace
                      northern and southern sides to the full extent to prevent opportunities for overlooking of
                      neighbouring properties.
                      Landscaping
               6.     A minimum of 20% of the site must be retained as soft landscaping.
               7.     The rooftop planters as depicted on Drawing No. 050.01 Revision I prepared by Shaun
                      Lockyer Architects Pty Ltd and dated 25 August 2022 must be planted with vegetation that
                      will overhang the façade to assist in visually breaking up the parapet.
               8.     All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               9.     All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
               10.    Existing trees on the site must be retained, except where required to be removed to
                      accommodate the approved dwelling.
               11.    Fauna or fauna habitat relating to minor approved tree removal works must be managed by
                      a qualified person*.
                      *(Refer to Advisory Note)
               12.    All tree and vegetation removal works must be undertaken by a qualified person*.
                      *(Refer to Advisory Note)
               13.    Existing vegetation in the road reserve must be retained and is not permitted to be removed,
                      except in accordance with an approved Construction Management Plan and Operational
                      Works approval to provide a temporary hoarding area for the storage of materials and
                      equipment during construction of the approved dwelling house. The disturbed/cleared area
                      must be rehabilitated in accordance with an approved Rehabilitation Plan to the reasonable
                      satisfaction of the Manager Development Assessment prior to commencement of the use.
                      Site Access and Driveways
               14.    A sealed access driveway must be provided from David Low Way to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval and must be generally in accordance with Westera Partners’
                      Civil Works Plan (S21-110-C02, Revision D) and Typical Details (S21-110-C03, Revision B)
                      dated 22 August 2022.




                                                                                                  Page 3 of 5
Document Set ID: 22604302
Version: 4, Version Date: 14/11/2023

Page 4

                      Stormwater Drainage
               15.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge without causing scour or damage to the subject site or any adjoining properties.
                      The works must be undertaken in general accordance with Westera Partners’ Civil Works
                      Plan (S21-110-C02, Revision D) dated 22 August 2022.
                      Geotechnical Stability
               16.    A site-specific geotechnical investigation must be prepared by a qualified person* and
                      submitted to Council for records purposes prior to the issue of any Development Permit for
                      Operational Works or Building Works. The site-specific investigation report must identify the
                      building foundation requirements and stability considerations necessary for the future
                      dwelling (and it’s associated ancillary structures) to maintain the stability of the dwelling and
                      associated structures for the long term.
               17.    The development works must not adversely impact on the stability of adjoining lands and/or
                      buildings and/or services.
               18.    A dilapidation survey must be carried out of all adjacent properties and structures before the
                      commencement of construction of the proposed development on the site
               19.    At the completion of the works certification must be submitted to Council from a qualified
                      person* which certifies that the development has been constructed in accordance with the
                      recommendations contained in the site-specific geotechnical investigation and that the
                      development has a minimum factor of safety against landslip of 1.5 in the long term.
                      * (Refer to advisory Note).
                      Earthworks and Retaining Walls
               20.    All earthworks and associated retaining structures/batters, both above and below ground,
                      both temporary and permanent, must be contained entirely within the subject site unless
                      written permission from the respective landowner(s) is provided to Council. All earthworks
                      must be undertaken in accordance with the provisions of Australian Standard AS3798:
                      Guidelines on Earthworks for Commercial and Residential Developments and be generally
                      in accordance with Westera Partners’ Civil Works Plan (S21-110-C02, Revision D) dated 22
                      August 2022 and the conditions of this Decision Notice.
               21.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               22.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               23.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      a.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Sunset Clause for Referral Agency Response
               24.    This Concurrence Agency response is no longer valid if the use has not commenced within
                      4 years of the date of this notice, unless otherwise extended in writing by Council.




                                                                                                       Page 4 of 5
Document Set ID: 22604302
Version: 4, Version Date: 14/11/2023

Page 5

               5.     REASONS FOR INCLUSION OF CONDITIONS

               The proposal is subject to specific built form parameters outlined in The Noosa Plan.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the referral agency conditions:
                      Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Building and Construction Industry (Portable Long Service Leave) Levy
               2.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Co-ordination of Operational Works Assessment
               3.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Qualified Person
               4.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                      b.      has a degree in civil engineering or engineering geology; and
                      c.      has a minimum of 5 years’ experience in the field of geotechnical engineering or
                              engineering geology.
               5.     Qualified Person, for the purpose of:
                      a.      Supervising landscape works and preparing a landscape certification, is considered to
                              be a landscape architect, landscape designer or horticulturist with a minimum of three
                              years current experience in the field of landscape design.
                      b.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation and Specifying Trees – a guide to
                              assessment of tree quality (NATSPEC) assessment and either:
                               i.      International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
                      c.      Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.

               Yours faithfully,




               Nadine Gorton
               Acting Coordinator Planning
               Enc:   Approved Plans/Documents



                                                                                                        Page 5 of 5
Document Set ID: 22604302
Version: 4, Version Date: 14/11/2023

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.