Council archive · source document
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200
-i— INTEGRATED. PLANNING ACT 1997. DAS-Assessment Checklist; Version 21.0; 3 September 2007 IPA, schedule 8, part 1, table 5, item 1 IP Regulation, schedule 2, table 2, item 17 IP Regulation, schedule 1, table 5, item 2 (wild river area) Water Act 2000, section 966C Wild Rivers Act 2005, section 43A ‘ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA i 13 Does the proposal invoive an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? No [] Yes IPA, schedule 8, part 1, table 2, itern 1 IPA, schedule 8, part 1, table 5, tems 3 and 4 JP Regulation, schedule 2, table 2, items 1 and 23 Environmental Protection Act 1994, section 73AA (wild river area) Wild Rivers Act 2005, section 434 (WITHIN THE LIMITS OF A PORT | 414 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994? No [1 Yes IP Regulation, schedule 2, table 2, items 15 and 16 IDECLARED FISH HABITAT AREA | 1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? No ([]_ Yes - ifanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. IP Regulation, schedule 2, table 2, item 26 |COMMUNITY INFRASTRUCTURE | 1.6 ts any part of the premises designated for community infrastructure? [Xx] No (1 Yes IP Regulation, schedule 2, table 3, tem 7 IWASTE WATER MANAGEMENT ] 17 Does the proposal involve the establishment or expansion of a waste water disposal system? No (] Yes IP Regutation, schedule 2, table 3, item 5 on seeks app ‘operational Work ' PLANNING SCHEME | 44 Is any of the proposed operational work assessable under a planning scheme? oO No - Go to Question 4.2 below Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below ISTATE-CONTROLLED ROAD } 4.1.1 ts any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road? No (1 Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.