” ,» GENERAL NOTES

PLANTS

Plants to be ordered in advance from reputable source/s to
ensure availability.

Plants to be well-formed, hardened-off stock, well-branched &
foliated, true to type. ‘

Root system to be sturdily established in container with no
large roots extending. :

Form & habit to be normal for species scheduled & pruning
scars to be clean cut.

Leaves to be of normal shape, colour & texture with minimal
physical damage.

Plants to be free of living insect pests and free frorn any

- disease or physical injury

Containers to be free of weeds.
All plants to be delivered to site clearly & accurately labelled.
Contractor to maintain plants on site until planted.

SOIL PREPARATION

Remove all weeds, debris, rubbish, grass, etc. from areas to be
planted.

Form garden beds & spread any stockpiled topsoil. Beds
adjacent to hard areas to finish 100mm below paved level to
allow for depth of mulch. ~~ -~—._

Any imported topsoil to be free of large’s stones, weeds, sticks,
rubbish, or any material toxic to plant growth & shall be

” guaranteed free of Nut Grass & Oxalis.

PLANTING PROCEDURES

Do not plant in extreme hot, cold or atmospheric disturbances.
Dig separate holes for each plant, 100mm wider & deeper than
container. Loosen soil at base of holes a further 150mm depth.
Fill holes with water & allow to drain away.

Position plant in centre of hole, set plumb & backfill,
incorporating controlled release fertilizer as instructed on
packaging:

Gently & firmly tamp down around root ball, leaving a shallow
watering depression. Water immediately and thoroughly using
minimum 5 litres per-plant. .

MULCHING

All garden aréas to be mulched after planting and installation of
irrigation (recommended) with Hardwood Chip mulch (max. 5%

fines) to min depth of 100mm unless otherwise shown on plan.

Mulch to be kept at least 50mm from ail plant stems to prevent
collar rot.

DRY CREEK BED

To simulate a dry creek bed, excavate a roughly 300mm deep
elongated depression as shown on plan. Line outsides with 100
to 200mm diam river rock and line base with ungraded river
gravel te depth of 100mm.

Between footpath and road, place line of 100 to 200mm diam
rocks as shown to provide separation between river gravel
muiched area and Hardwood Chip mulched area.

GARDEN EDGING

Continuous extruded concrete mowing edge as shown, profile
as selected. .

ESTABLISHMENT

The Contractor shall establish and maintain the landscaping
works until the end of the Defects Liability Period.

“Make good any defects due to inferior materials, workmanship

ordamage: ~

Carry out all necessary watering, weeding, pruning & plant
replacements to ensure healthy growth.

Replace any dead or damaged plants with same species at the
contractor's expense (except for vandalism).

Remove all debris and leave site in a clean and tidy manner.

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Publis.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.