Skip to the record
The gold standard in government transparency.

Council archive · source document

08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED. PLANNING ACT_1997.

ia

Part A;Version-3.0-3 September-2007—_—

 

‘Mandatory attachments and supporting information

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

j

 

 

 

 

 

 

 

 

 

 

Description of attachment or information Title (if applicable) ,
(e.g. Part C of Form 1, owner's consent, evidence of | (e.g. General Authority, James StreetTrafic Date Method of delvery to
resource allocation/entitlement, plans, drawings, reports) Report) assessment manager
1 Part E of Form 1 over the counter
[Portable Long Service Leave (PLSL) levy for building and construction work |

 

13. ts payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?

No - Complete and submit a QLeave Notification and Payment Form. The receipted form must be sighted by the assessment

CJ Yes - Complete Table L and submit, with the application, the ‘yellow’ (Local Govemment's (Council) / Private Certifier's) copy of

 

 

 

 

 

LJ No
Yes
13{b). Has the PLSL levy been paid?
@ manager before a development permit can be given.
the receipted QLeave Form.
OFFICE USE ONLY

Date Received | | r{ee ‘| Reference Numbers

 

 

 

FOR COMPLETION BY ASSESSMENT MANAGER

 

 

ls a QLeave Notification and Payment Form required for this application?

[x] No

(0) Yes - Complete Table M

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

To

 

 

 

Council

| have been engaged as the private certifier for the building work referred to in this application

 

 

e Date of

engagement

Accreditation number

Name

BSA Certification number

Building classification

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Publis.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.