2312-38102 SRA
Attachment 1—Referral agency conditions
{Under section 56[1)(D)()) of the Planning Act 2076 the following conditions must be atlached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. | Conditions | Condition timing
Building work for alterations to a dwelling house, construction of swimming pool and fence
Schedule 9, Part 3, Division 1, Table 1 — Premises seaward of coastal building line—The chief
executive administering the Planning Act 2016 nominates the Director-General of the Department of
Environment, Science and Innovation to be the enforcement authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to the
following condition(s):
1. The building works must be carried out generally in accordance with | Prior to the issue of the
the following plans: Certificate of
(a) Stormwater Management Plan prepared by Westera Partners ification’ Final
dated 01/2023, reference S22-174-SW01. Classification! Final
(b) Stormwater Typical Details prepared by Westera Partners Inspection Certificate
dated 01/2023, reference S22-174-SWO02. or prior to the
(c) Lower Level Plan prepared by Aboda Design Group dated commencement of use,
13/10/2023, reference WD.201, revision DA2. whichever comes first,
(d) Main Level Plan prepared by Aboda Design Group dated and to be maintained at
13/10/2023, reference WD.202, revision DA2. all times.
(e) Upper Level Plan prepared by Aboda Design Group dated
13/10/2023, reference WD.203, revision DA2.
2. For the building work, only use clean materials which are free from For the duration of the
prescribed water contaminants. works.
3. Development must prevent the release of sediment to tidal waters by | For the duration of the
installing and maintaining erosion and sediment control measures in | works.
accordance with the Best Practice Erosion and Sediment Control
(BPESC) guidelines for Australia (International Erosion Control
Association).
4. Submit “As Constructed drawings” to [email protected] or mail —_| Within 20 business
to: days of the completion
Department of Environment, Science and Innovation of the works.
Permit and Licence Management
GPO Box 2454
Brisbane Qid 4001
5. (a) In the event that the works cause disturbance or oxidisation of | (a) Upon disturbance
acid sulfate soil, the affected soil must be treated and thereafter | or oxidisation until the
managed (until the affected soil has been neutralised or affected soil has been
contained) in accordance with the current Queensiand Acid neutralised or
Sulfate Soil Technical Manual: Soil management guidelines, contained
prepared by the Department of Science, Information
Technology, Innovation and the Arts, 2014.
(b) Submit certification from an appropriately qualified person on _| (b) At the time soils
acid sulfate soil, confirming that the affected soil has been have been neutralised
neutralised or contained in accordance with (a) above to or contained
[email protected] or mail to:
Department of Environment, Science and Innovation
Permit and Licence Management
GPO Box 2454
Brisbane Qid 4001.
Note: Appropriately qualified person(s) means a person or persons
‘State Assessment and Referral Agency Page 3 of 7
Page 12 of 20
Document Set ID: 23086532
Version: 3, Version Date: 02/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original