Skip to the record
Accept no substitutions.

Original source · versioned page text

SUPERSEDED - Amended Decision Notice - DBW230027 & OPW23 0050 [As Published]

of 14

Page text shows just the words. Original shows the document exactly as it was published.

                      Bonds
               65.    Bonds must:
                      a.      have approval of the bond calculations and amount from Council prior to lodgement;
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
                      As Constructed Plans and ADAC XML Files (Council)
               66.    Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                      “As-Constructed” records must be submitted to Council. The “On Maintenance” package
                      must include “As Constructed” drawings endorsed by a qualified experienced Civil Engineer
                      (RPEQ) confirming design intent and conformance with applicable standard and
                      specifications, along with the relevant descriptions of assets, services and structures.
                      On Maintenance
               67.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to Council accepting the works. To achieve
                      ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit;
                      b.      as Constructed details in accordance with Council’s Planning Scheme Policy; and
                      c.      maintenance and operational manuals for all proprietary or site specific devices.
                      Off Maintenance
               68.    Prior to requesting an Off Maintenance inspection, the developer must provide a written
                      request for the Off Maintenance inspection.
               69.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements; and/or
                      b.      submitted certification falsely states works comply with approval requirements.
               70.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Development Compliance Inspection
               1.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection




                                                                                                      Page 10 of 14
Document Set ID: 22782454
Version: 1, Version Date: 25/01/2024
Log in to download the original file

SUPERSEDED - Amended Decision Notice - DBW230027 & OPW23 0050 [As Published].pdf · 191 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.