SUPERSEDED - Amended Decision Notice - DBW230027 & OPW23 0050 [As Published]
26. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
OPW23/0050 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (DRAINAGE,
STORMWATER & EARTHWORKS)
Approved Plans
28. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
E01 C Earthworks Layout Plan, Prepared by Walsh 27 September 2023
Consulting Engineers
E02 C Earthworks Sections Plan, Prepared by Walsh 27 September 2023
Consulting Engineers
R01 C Roadworks and Basement Layout Plan, 27 September 2023
Prepared by Walsh Consulting Engineers
R02 C Driveway Setout, Jointing and Details Plan, 27 September 2023
Prepared by Walsh Consulting Engineers
D01 C Stormwater Drainage Layout Plan, Prepared 27 September 2023
by Walsh Consulting Engineers
Currency Period
29. The Currency Period for this development approval lapses if the development has not
substantially started by 12 January 2026, unless an application to extend the currency period
is approved by Council.
Site Specific Conditions
30. Prior to Council attending a pre-start meeting, the applicant is to provide to Council the
location where excavated material is proposed to be transported for treatment of acid sulfate
soils, and for final placement as fill. The location for final placement as fill is to have a lawful
entitlement for the placement of the fill, with details to be provided to Council.
Bonds
31. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
Page 5 of 14
Document Set ID: 22782454
Version: 1, Version Date: 25/01/2024