Council archive · source document
08/0811 - Representations Received [As Published] · 132008.811
Page 2 Representation to Condition 1: The condition is requested to be amended to reflect the revised plans that detail the pool setback 600mm with a landscaped garden bed located to the canal frontage. Condition 2: The swimming pool shall finish no higher than the finished level of the river front deck (RL2.8). No structure shall overhang the revetment wall; in this regard the swimming pool caich pond shail not overhang the revetment wail. Representation to Condition 2: The applicant seeks deletion of this condition. The applicant and their building designer met with Council staff, Ms Kerri Coyle and Mr. Glen Conforti to discuss the condition and the impacts on the development. At this meeting the applicant indicated that there were a number of other sites that had similar structures approved adjacent to the waterfront. The applicant presented two options, one of which provided for the pool to be setback an additional 600mm with a landscape garden bed in front of the pool. Council staff indicated support for the above revised plans. The applicant therefore requests deletion of condition 2 and approval of the revised plans as agreed to at the meeting. The applicant now requests that Council issue a negotiated decision notice which amends the original conditions as suggested above. Please do not hesitate in contacting our office if Council requires any further information. Yours faithfully WE. ato Nadine Gorton Senior Planner Martoo Consulting Pty Ltd Ce Ben Thorton SBT Designs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0811 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.