Change to Exisiting Approval OPW11/0257.01 · MCU11/0168
",.,.. ~;
;
~
oPw\dOd-s:=t- G\
1St Shl(’1e Coast
Jr
C(kinci! Request
III 2011/12 Regional Strategy and Planning
to Change Existing Approval and/or Extension to Relevant Period
...
~~\ 0l 7hq~ ~.
..,’o;l1able Planning Act 2009
SCRC CORRESPONDENCE
ALL questions MUST be completed unless th~ form indicates otherwise.
This form must be submttted to Council a_omparlied by the. applicable fee. 1111111111111111111111111
Attach extra pages if there is insuffici~nt ~pace on}the form.
If Council was the Assessment Manager for !he eXisting’approval, and the wa,~
(a)a requ~st to change the de~lopment approvaf and/or conditions is made to the Court; and
(b)a request to extend the relevant period for the aDpro’val is made to Council.
All terms used on the form have the,meaning give~ ir1 tle Sustainable Planning Act 2009 or,the
2009.
Full name -
individual or company
Contact Name -
for company
0,
Mobile
Fax
2. Details of existing approval II
Ty~e of approval (please tick ALL applicable ca:e ories) Wh~ entity issued approval?
\t’ Development Permit V Sunshine Coast Council
I \\ b
o Preliminary Approval o Other entity -
please speqifrc ~ L_
d~~..\.lO. R:
ox:
Ul."i r...1
.
o Compliance Permit L
r ....
~ Material Change of Use
~
Development f’OtInter 1
..
o Reconfiguring a Lot .
v
,
o Operational Works "
"
o Building Works
:t., ,..<<..
Zl JUN
o Plumbing or Drainage Works
T’
;.\
2012(( ,
o
o
Compliance Certificate IL MaroochYdore
Environmentally Relevant Activity I I
OJ)KlI//0..2 s-1t Date issued
^^ ,,-
, s- 9-/I -
’il" N6 0 Yes complete below -
Insert the name of each local government area ;., which the mobile and temporary ERA is proposed to operate/operating
,?-,
Privacy
Council will use any personal information provided f:,’ II’ ") intended purpose only and for remaining in contact with you. Council is
authorised to collect this information in accordance v. :11 ’he Local Government Act 2009 and other Local Government Acts. Your
personal information is only accessed by persons at.:’ l~’ised to do so. Your personal information is dealt with in accordance with
council’s privacy policy.
www..unthlneooMt.qlclJOl’... I .........,.hInr..oRt.qld.gov..u I T 0754757212
.
F 015475 1ZT7
Loc:bd BIG 72Sunllhine Coat MIIII Centre QId 4580 I ASN 3787(1 873913
c.Jound..oIIIce 1 Onnh A’IIIIIU CIIIoundrI QId 04551 I ....aoch)Idore oIIice 11-130cNn sn.t~QId 04_
"’’’’’&lrGftIoo Cnr C".....tnd ~sne&t Hembo\lr Qld .4S6O I r......... vIIIOI s p",..enetT_nltn QId 4566
1 of 4 2011/12 Regional Strategy and Planning "e uest to Change Existing Approval and/or Extension to Relevant Period FM401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
/Je5"!6/l tOPlJtV,4t REI/JS/&{)
(<Er" f([/1)tiC J(ot"tJ/}//lb ~H
,J#f
.
II
Was there one or more concurrence agencies ’lvolved in the original approval?
details below
Note Under of the Sustainable Planning
-
s372.
concurrence agencies.
A~ 2009.,the person making the request is required to give a copy of this request to all
I
Concurrence Agency r,.’ tl."t
_:
.
~
"
Date copy given
a pre-request response been given by a re evant (e. a concurrence
. agency) for this request?
DYes
If yes, please attach a copy of the notice.
Table A -
owner’s consent provided on for Ii Date
Owner’s name/s
Table A -
owner’s consent provided on form
I/We, the above-mentioned owner/s of the lane
Owner’s name/s
to the making of this request.
D The owner’s written consent is attached.
Signature/s
2 of 4 2011/12 Regional Strategy and Planning Qe"uest to Change Existing Approval and/or Extension to Relevant Period FM401
Page 3
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 22J if the person making the request is not the owner of the land to which the
approval relates, the request must be accompanied [’I t’le owner’s consent.
However, owner’s consent is not required if the appr0v2 .
relates to land the was acquisition land to which sertion 263(2)(d) of the Sustainable Planning Act 2009 applied when the
application for the approval was made; or
is for building work or operational work for the suop y of community infrastructure on land designated for the community
infrastructure; or
the consent ofthe owneqvould not be required .
’lc~r section 263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change
Also, owner’s consent is not required if the Assessmp’lt \ilanager is satisfied that:
the number of owners of the land make it imprac~ c21 to obtain owners’ consent, and the requested change does not materially
affect the owners’ land; or
having regard to the nature of the proposed ch8ngE’ the owner has unreasonably withheld consent and the requested change
does not materially affect the owner’s land.
Nature of State owned resource:
Nature of Evidence required:
o Evidence of allocation of I entitlement to, the resource 0Evidence the chief executive has agreed to the request
Attach a copy of the evidence required abov’"
NOTES: For question 8
Section 370(3) and (4)of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at
time of making this request and evidence under sec on 264(1) of the Sustainable Planning Act 2009 would be required to support
application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provices that if a development involves a State resource, a regulation may require
the application to be supported by certain evidencelpre~cribed under regulation. Schedule 14 of the Sustainable Planning Regulation
2009 the State resources for which evider ~e s required to be given, and the evidence to support the
9. Declaration of applicant
I/We, the applicant, declare that the above infor"’"12’ion is correct in all respects, at the time of lodgement of this
application with the Sunshine ast Regional C()’~ ’lci!. Should any of the details given in relation to this application be
changed in the future, the Icant shall advis’- t;..~ Sunshine Coast Regional Council in writing prior to any such change
being implemented.
Signature/s
3 of 4 2011/12 Regional Strategy and Planning ,
e~uest to Change Existing Approval and/or Extension to Relevant Period FM401
Page 4
OFFICE USE ONLY
-
~ _........, .
r I Receipt no. I Initial
..
Application no. Amount paid Date paid Date stamp
- --
-,----:; .,.......-.~
j I
Receiving Officer
I
l
Payment options
In person Customer service centres: 8.30 a r’" te 4.30 pm Monday to Friday (excludes public holidays).
By mail Cheque or money order to be ma en rayable to: Sunshine Coast Regional Council.
o Cheque IDMo ’:/ )rder
...
0Mastercard 0Visa
Card number Expiry date Amount $
Name on card Signature of cardholder
Phone DYes 0No
40T4 :l(f1’ ’,:l Ke9lonal :strategy ana ..Iannln9 ’e
Page 5
,~
-
DRAWING SCHEDULE
2508-1 COVER SHEET
GENERAL NOTES
Water Supply and Sanitary Drainage has been designed and shall be constructed in 2508-2 LEGEND & SITE PLAN
accordance with the O’ld Standard Sewerage Law, O’ld Standard Water Supply Law,
the National Plumbin", and Drainage Code 3500., all relevant Australian Standards, 2508-3 DRAINAGE LAYOUT
and the requirements of the Local Authority.
These Drowings are diagrammatic only and shall be read in conjunction with all relevont
Architectural and other consultants drawings and specifications and other written 2508-4 DETAILS
instructions that may be issued during the course of the contract.
Any discrepancies shall be referred to the supervising officer for decision before 2508-5 CALCULATIONS
proceeding with the work.
Contractor shall verify all fixture locations, invert levels, surface levels, and
cover to pipes ore correct and obtainable prior to commencement of the work.
The exact location of existing, and proposed services, sholl be verified with Note:
the relevant Authority. or other trades as applicable.
Fire stop collors to be used on 011 plastic pipework penetrating fire resistant Do not scale from these drawings.
construction. Do not rely on these drawings for
SANITARY DRAINAGE alignment and levels of all existing
Underground pipework sholl be 100 dio. PVC OWl/, min grade 1:60 U.N.O. infrastructure.
Suspended Pipework sholl be PVC class OWl/. It is the of the contractor
Trade waste pipework to grease trap suspended shall be "Coesprene" or obligation
HOPE. Underground shall be vitreous cloy or HOPE. and/or plumbin9 contractor to survey
Trade waste pipe work to oil separator sholl be HOPE, or Vitreous cloy with all existing services to
prior
"Nitrile" rubber rings.
CLeonouts inspection openings brought to surface in paved
or
oreas. or within buildings to hove brass cops.
STORMWATER DRAINAGE
Under~round pipework sholl be 100 dio PVC cl055 SW min grade 1:1 00 U.N.O.
Oownpopes shall be 100 Dio PVC class SW.
or concrete
~ construction
Rainwater outlets (RWO) and planter outlets (PO) shall be "Gatic Wade" or similar,
with membrane clamp where required.
WATER SUPPLY
Pipework sholl be according to AS4020 for example ABS (ocrylonitrite
stytrene), PP (Poly propylene) or PE (Polyethylene) UNO.
Water supply pipewark shall be 20 dio UNO.
Exception: one fitting only may be 15 dia. max. length 3000 mm.
Hot waler pipe work sholl laggej 0’
.,
Hot waterrecirculating lines to b insulated w;th 20mm ArmoflP":’ 0’" siMilo" W’)lJvl)
Provide tempering valves on hot wotel to personal hygiene fll ~urt:..
’
Underground copper pipe work sholl be "Kemlogge or otherwise protected.
a
Under9round pipework not under concrete slob may be polypipe closs PN20. )
one size larger thon shown.
Exposed pipework in amenities areas, shall be chrome ploted.
Where water meters ore installed within tennancies, provide remote readout
~
adjacent to Electrical meters, or in a position as indicated by the Architect.
BACKFLOW PREVENTION
Provide hose connection vacuum breakers to 011 hose cocks SITE LOCATION
Provide RPZO to any irrigation connections. SCALE: NTS
PROJECT: Amd Descri tion Dote
Construction
~ Hydraulic W:E! TAPLEY RESIDENCE
CONTACT: Reinhold Koenning ’-lIEAust RPEO No 7023 LOT 34
PO Box 181 AHSCA MARCUS DUNES ESTATE B DRAINAGE REVISED PER APPUCANTS ADVICE 26-06-12
ARCHITECT
’-loffat Beach, Old, 4551
PH: 5491 4333 FX: 5491 4233
:
CUENT:
TAPLEY
~ A
For
RESPONSE TO RFl
X
Notes
21-09-11
Date
5-08-11
FOSTER DESIGNS For
For Tender
DRAWING TITLE: B
For Construction
COVER SHEET
RPD:- LOT 34 SP 111721 As Constructed
Page 6
,
_RI.I_ Rain Water III Diameter
-’>1- Existing Water c.o.s. Clean aut to surface
-s- Existing Sewer CJ Copped junction
-SI.I- Existing Storm water 01 Conrol valve
-HD- Existing House drain CS Cleaners sink
100SPI11n1
cw Cold Water
Sanitary Drainage PU8UCUSE
-G’>I-
CAP Duct acce.s panel PARI<
Grey Water
DOl Double check valve
-------
Vent Pipe
Een Eccentric Enlarger
-----
Cold Water Elev Dge Evevoted Drainage
-------
Hot Water Enl Enlarger /
"
---- Storm Water Drainage FC Folse ceiling ;’ ./
---------- Fire FH Fire Hydrant ;’
FHR Fire hose reel
-401- Agi Drain ./ .....
FFL Finished floor level
FU Fixture unit.
@---o Rain Water Riser GIT Grease Interceptor trap ..""
~ Cold Water Riser
GP
GMH
Gully pit
Gully Man Hole
..
~ Pipe Down gv Gate valve
~ Stack HW
HCB
Hot water
House connection bronch
( Pipe Vent HD House drain
~Group Vent
HL
IC
High level
Inspection Chamber
,,""
CID---o Educt Vent IL Invert level
..
35
SP11H:!1
~ Induct Vent
io
ios
Inspection opening
Inspection Opening to Surface
~ Hot Water Riser
Fire Dropper
KclcC
MH
NRV
Kerb clc Chonnel
Manhole
Non return valve
~ Fire Riser PB
PLV
Path box
Pressure limiting valve ..""
-- V Valve PO Planter outlet
---l8I he Hose Cock RPB Real Property Boundary
RPD
-=:J een Eccentric Enlarger RPZD ~:~~::O ~~~u~:sZ~~~,odevice
RWO Rain water outlet
---C}--- en Enlarger RWH Rain water head
SO Sanitary Drainage
@) ORG Overflow Relief Gully SL Surface Level
Square
Do wc Water ;jt Safe Troy
Closet SWD Storm water drain
tltd Trapped Tundish
1=0=1
Dl
sk
IT
Sink
Laundry Tub
TG
td
TG~t)
Test
Tundish
gote
Trf"’i’" g...:)If’ trlH1SJ(’rS6> bo...
b
I ~j .
>=
/
TG,I) lre~~~. S’::lt<:: !c. s;~ud.nc’ bo"
Washing /
lQl wen
Machine
TM V
TV
Tr.
Tempering vallie
IT l(
.....~ \iO;"te-
’_
vUVKI .._ ~. ~/,
@ FWG Floor Wa.te Gully ulg Underground
uls Under slob
...~
ISTlNG COMMUNAL
Bn Basin u.n.o. Unless noted otherwise
WS Water supply LET WITH .300 RCP
0 DRAINAGE RESERVE.
ICJI 8th Both ~ Shr Shower If--
S",__
::er FHR Fire Hose Reel
0 HWS Hot water system S,",---- S,",-
SITE PLAN
IlIfi!J CS Cleaner. Sk
SCALE: 1 :200
--S",--
~ ME Water Meter
PROJECT:
Construction Amd Descri tion Dote
~ Hydraulic WE! TAPLEY RESIDENCE
CONTACT: Reinhold Koenning MlEAu.t RPEO No 7023 LOT 34
PO Box 181
AHSCA MARCUS DUNES ESTATE B DRAINAGE REVISED AS PER APPUCANTS ADVICE 26-06-12
Moffat Beach, Old, 4551
ARCHITECT:
PH: 5491 4333 FX: 5491 4233 CUENT:
TAPLEY
~ A
For
RESPONSE TO RFl
rovol X
Notes
21-09-11
Date
FOSTER DESIGNS 5-08-11
For
DRAWING TITLE: For Tender
8
SITE PLAN &: LEGEND For Construction
RPD:- LOT 34 SP 111721 As Constructed
Page 7
RAINWATER HARVESTING AND RETENTION TANKS:
20ff SUM UNE 5,000 UTRE TANKS. REFER DETAIL Undercroft
EFFECTIVE RETENTION VOLUME: 5,000 UTRE
EFFECTIVE HARVESTING VOLUME: 5,000 UTRE REMAINING DOWN
PIPES TO BE
150 OVERFLOW UNDER SLAB.
CONNECTlED.
--
--
--
-_
r
--
11150 OVERFLOW WITH 1150 SLOW LEAK
AT INVERT OF RETENTION TANK. REFER DETAIL.
--,
\
\
\
t:lQIE; \
WITH PROVIDING THE ON SITE RETENTION
STORAGE VOLUME AND PROVIDING THE
\
ON SITE INFILTRATION MEASURE THE \ I
PROPOSED DEVELOPMENT WILL NOT
RESULT IN AN INCREASE OF OUANTlTY
\ Drlvray
OF RUNOFF AND NOT ADVERSLY EFFECT \
ANY DOWNSTREAM PROPERTY. I
\J.
\
\
f\."^DI"" ,"’_
-’. ... , . t. 4 I ~ ,
XISTING COMMUNAL
NOTE: INLET WITH 300 RCP
50% OF THE ROOF CATCHMENT AREA TO DRAINAGE RESERVE.
SHALL BE DIRECTED TO THE TANK.
PROJECT: Descri tion
Construction Amd Dote
~ Hydraulic W: : TAPLEY RESIDENCE
CONTACT: Reinhold Koenning MIEAust RPEO No 7023 LOT 34
PO Box 181 AHSCA MARCUS DUNES ESTATE B DRAINAGE REVISED AS PER APPLICANTS ADVICE 26-06-12
Moffot Beoch, Old, 4551
ARCHITECT:
PH: 5491 4333 FX: 5491 4233 CUENT:
TAPLEY
~ A RESPONSE TO RFI
roval X
Notes
21-09-11
Dote
5-08-11
FOSTER DESIGNS
For Buildin
DRAWING TlTILE: 8 For Tender
For Construction
DRAINAGE LAYOUT
RPD:- LOT 34 SP 111721 As Constructed
Page 8
From HorvestinQ Tonk 150 OVERFLOW
From ............... _...... ............
DP’.~ ........ ......- ...........
HARVESTING TANK RETENTION AND PEAK FLOW
5.000 UTRE MITIGATION TANK
VOLUME 5.000 LITRE.
Ground
V V V V "< V V V V V V V/<V V V V V V V V ’< ’< "< ’< V ’< "(-<.’"
t
~
V "
-
50 SLOW lEAK
RAINWATER HARVESTING AND
MITIGATION TANK SETUP.
SCALE: NTS
PROJECT: Amd Description Date
Construction
~ Hydraulic ma! TAPLEY RESIDENCE
CONTACT: Reinhold Koenning MIEAust RPEO No 7023 LOT 34
PO Box 181 AHSCA MARCUS DUNES ESTATE B DRAINAGE REVISED AS PER APPUCANTS ADVICE 26-06-12
ARCHITECT:
Moffat Beach. Old. 4551
PH: 5491 4333 FX: 5491 4233 CUENT:
TAPLEY
~ A RESPONSE TO RFI
Issue
For Development Approval X
Notes
21-09-11
Dote
25-08-11
FOSTER DESIGNS
o._I~IO",.n 1M..J:<JIf:lo.t.125 08 11 I Dog. No. For Building Approvol
12508-4 18
_
For Tender
DRAWING TITLE:
sc.ou:, NTS ON.u u.N.o.1 4 of 5
For Construction
DETAILS
RPD:- LOT 34 SP 111721 As Constructed
Page 9
.
.
RUNOFF &: DETENTION CALCULATIONS: 14
MAXIMUM EVENT: Ql00
/..........
12
TIME OF CONCENTRATION: 5min ~ ---
NO RETENTION r---
INTENSITY: 326mm/hr
cJ
~ 10
/ ...., J
SITE AREA: ,
- WITH RETENTION r---
557sqm "- L
IMPERVIOUS AREA: 275sqm en
w 8
L ~
’"
I:: / ,
PRE DEVELOPMENT PEAK RUNOFF: 6
44L/s d
PEAK RUNOFF POST DEVELOPMENT: 47L/s /
,
DETENTION VOLUME REQUIRED: 3,680 UTRE
~ 4
...
./
....
DETENTION VOLUME PROVIDED: 2
5,000 UTRE
0
1/_’ ---- ............
REDUCTION REQUIRED: 3L/s
0 2 ~ ~ ~ 1~ 112 1~ 1’6 1~ 20
REDUCTION PROVIDED: 10L/S TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING: 5,000 LITRE
TIII\jk’ FnR RFn-I\jTlnl\j. "nnn , ITRF
PROJECT:
Construction Amd Oescrje!.ion Dot.
JI Hydraulic baIlGh,.
..r",loa
too\fIl_. TAPLEY RESIDENCE
CONTACT: Reinhold Koenning MIEAu.t RPEQ No 7023 LOT 34
PO Box 181 AHSCA MARCUS DUNES ESTATE B DRAINAGE REVISED AS PER APPLICANTS ADVICE 26 06 12
Moffat Beach, Qld, 4551
ARCHITECT:
PH: 5491 4333 FX: 5491 4233 CLIENT:
TAPLEY
~ A RESPONSE TO RFI
Issue Notes
21-09-11
Dot.
FOSTER DESIGNS For Development Approval X 125 08 11
u.sognl~lo...n ..lM..’i;qlf:jDQ’.125-08-11 I Dog. No. For Buildino Acorovol
DRAWING TlTILE:
SCOLE, NTS 0It A3 u.N.o.1 5 of 5 12508-5 1B For Tender
For Construction
CALCULATIONS
RPD:- LOT 34 SP 111721 As Constructed
Used in these records
Change to Exisiting Approval OPW11/0257.01Related documentApplication case desk ↗
Change to Exisiting Approval OPW11/0257.01Related documentApplication case desk ↗