Change to Exisiting Approval OPW11/0257.01 · MCU11/0168

of 9

Text shows just the words. Original shows the document exactly as it was published.

    .
.




                              RUNOFF &: DETENTION CALCULATIONS:                                14
                              MAXIMUM EVENT:                          Ql00
                                                                                                                            /..........
                                                                                               12
                              TIME OF CONCENTRATION:                  5min              ~                                                                                                          ---
                                                                                                                                                                                                            NO RETENTION    r---
                              INTENSITY:                              326mm/hr
                                                                                         cJ
                                                                                         ~ 10
                                                                                                                        /                 ....,                                               J
                              SITE AREA:                                                                                                          ,
                                                                                                                                                                                                   -        WITH    RETENTION r---
                                                                      557sqm            "-                                                                                                    L
                              IMPERVIOUS AREA:                        275sqm             en
                                                                                         w     8
                                                                                                               L                                   ~
                                                                                         ’"
                                                                                         I::                  /                                        ,
                              PRE DEVELOPMENT PEAK RUNOFF:                                     6
                                                                      44L/s             d
                              PEAK RUNOFF POST DEVELOPMENT:           47L/s                                  /
                                                                                                                                                                   ,
                              DETENTION VOLUME REQUIRED:              3,680 UTRE
                                                                                         ~ 4
                                                                                         ...
                                                                                                        ./
                                                                                                                                                                        ....
                              DETENTION VOLUME PROVIDED:                                       2
                                                                      5,000 UTRE
                                                                                               0
                                                                                                 1/_’      ----                                                                ............
                              REDUCTION REQUIRED:                     3L/s
                                                                                                    0       2  ~                      ~           ~           1~        112                   1~          1’6          1~           20
                              REDUCTION PROVIDED:                     10L/S                                                                            TIME   (MINS.)

                                                                                                                            STORMWATER HYDROGRAPH THROUGH TANK


                                                    TOTAL PROPOSED TANK VOLUMES:
                                                    TANK FOR HARVESTING:                                                5,000 LITRE
                                                    TIII\jk’    FnR   RFn-I\jTlnl\j.                                    "nnn       , ITRF




                                                                              PROJECT:
                               Construction                                                                                                                                                        Amd                          Oescrje!.ion                 Dot.


                   JI Hydraulic                     baIlGh,.
                                                    ..r",loa
                                                    too\fIl_.                   TAPLEY RESIDENCE
        CONTACT:   Reinhold       Koenning MIEAu.t RPEQ No 7023                 LOT 34
                   PO Box  181                          AHSCA                   MARCUS DUNES ESTATE                                                                                                B     DRAINAGE REVISED AS PER APPLICANTS ADVICE     26 06        12
                   Moffat Beach, Qld, 4551


        ARCHITECT:
                   PH: 5491    4333 FX: 5491 4233                             CLIENT:

                                                                                TAPLEY
                                                                                                                                                              ~                                    A     RESPONSE TO RFI
                                                                                                                                                                                                            Issue                              Notes
                                                                                                                                                                                                                                                       21-09-11
                                                                                                                                                                                                                                                             Dot.

                     FOSTER DESIGNS                                                                                                                                                                For   Development Approval   X                      125   08     11
                                                                             u.sognl~lo...n ..lM..’i;qlf:jDQ’.125-08-11 I Dog. No.                                                                 For Buildino Acorovol
        DRAWING TlTILE:
                                                                               SCOLE,    NTS            0It A3   u.N.o.1 5 of 5 12508-5           1B                                               For Tender

                                                                                                                                                                                                   For Construction
                     CALCULATIONS
                                                                               RPD:- LOT 34 SP                    111721                                                                           As Constructed

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Change to Exisiting Approval OPW11_0257.01.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.