Change to Exisiting Approval OPW11/0257.01 · MCU11/0168
.
.
RUNOFF &: DETENTION CALCULATIONS: 14
MAXIMUM EVENT: Ql00
/..........
12
TIME OF CONCENTRATION: 5min ~ ---
NO RETENTION r---
INTENSITY: 326mm/hr
cJ
~ 10
/ ...., J
SITE AREA: ,
- WITH RETENTION r---
557sqm "- L
IMPERVIOUS AREA: 275sqm en
w 8
L ~
’"
I:: / ,
PRE DEVELOPMENT PEAK RUNOFF: 6
44L/s d
PEAK RUNOFF POST DEVELOPMENT: 47L/s /
,
DETENTION VOLUME REQUIRED: 3,680 UTRE
~ 4
...
./
....
DETENTION VOLUME PROVIDED: 2
5,000 UTRE
0
1/_’ ---- ............
REDUCTION REQUIRED: 3L/s
0 2 ~ ~ ~ 1~ 112 1~ 1’6 1~ 20
REDUCTION PROVIDED: 10L/S TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING: 5,000 LITRE
TIII\jk’ FnR RFn-I\jTlnl\j. "nnn , ITRF
PROJECT:
Construction Amd Oescrje!.ion Dot.
JI Hydraulic baIlGh,.
..r",loa
too\fIl_. TAPLEY RESIDENCE
CONTACT: Reinhold Koenning MIEAu.t RPEQ No 7023 LOT 34
PO Box 181 AHSCA MARCUS DUNES ESTATE B DRAINAGE REVISED AS PER APPLICANTS ADVICE 26 06 12
Moffat Beach, Qld, 4551
ARCHITECT:
PH: 5491 4333 FX: 5491 4233 CLIENT:
TAPLEY
~ A RESPONSE TO RFI
Issue Notes
21-09-11
Dot.
FOSTER DESIGNS For Development Approval X 125 08 11
u.sognl~lo...n ..lM..’i;qlf:jDQ’.125-08-11 I Dog. No. For Buildino Acorovol
DRAWING TlTILE:
SCOLE, NTS 0It A3 u.N.o.1 5 of 5 12508-5 1B For Tender
For Construction
CALCULATIONS
RPD:- LOT 34 SP 111721 As Constructed
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Exisiting Approval OPW11/0257.01Related documentApplication case desk ↗
Change to Exisiting Approval OPW11/0257.01Related documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.