Skip to the record
Accept no substitutions.

Council archive · source document

Development Application part 1 of 2 · OPW11/0409

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                              B0386923


    THIS IS THE NEXT PART OF A
 MULTIPLE PART RECORD
                     Part I                     Of 2

Application number:                                  cPR^ t 104c4 9
       C Documents and Senings\eje\Desktop\Muhi Pan Record Covet Sheet NEXT PART (3) doc




                                     .ZS-           r7
Full text of the other 15 pages

Page 2

Page 3

                       T H E




                   J
                                E TTXI
                                    P E C I A
                  SERVICING THE EAST COAST OF            RA?IAA    SOUTH PACIFIC REGIONS


                                                          A
          n llai' mbar 3nii                /       /   KLGLIVLlJ   \W


          Sunshine Coast Regional Coi,in'il 1 2         DEC ?u11
          P O Box 141                                   SCRC
          TEWANTIN QLD 4565                    \       Nambour

          ATTENTION:- CHRIS GIBBERD

          RE:     Department of Employment, Economic Development' Innovation
                  LOT 157 (2) Russell Island
                  NOOSAVILLE QLD 4566

          Dear Chris

          Pursuant to the Sustainable Planning Act 2009, we wish to make application for
          Prescribed Tidal Works under the legislation that was adopted on 18 December, 2009.

          A similar pontoon proposal was recently approved by Council on 20 June, 2011,
          however rocks under the seabed prevented the piles being installed in the approved
          position. The piles had to be installed further into the waterway so we are required to
          seek another approval for this new position.

          Please find attached:
              1. Four copies of the plans for the proposal.
              2. IDAS FORMS I and 28.
              3. Government Land Register document detailing DEEDI as the trustee of the land.
              4. Resource Entitlement from Department of Environment and Resource Management.
              5. A full copy of SP143417.
              6. A full copy of the certificate of title.
              7. Engineer's certificate.
              8. Required fee of $1,508.00.
              9. Early concurrence response from Maritime Safety Queensland.

          We look forward to receiving correspondence from Council within the designated timeframes
          pursuant to the Sustainable Planning Act 2009.

         Yours faithfully
         The Jetty Specialist                                       Development Couni.-
                                                                                 1 2 DEC 2011

         MRS TRICIA HOOPER                                                 Maroochydore
         Applications Manager



THE MARINA SPECIALIST PTY LTD TRADING AS THE JETTY SPECIALIST - ABN 32 010 633 119
2 Industrial Avenue, Caloundra Queensland 4551 Australia
Telephone 07 5492 5925     Freecall 1300 133 155   Facsimile 07 5492 6699                               Quality
Web Page - www.thejettyspecialist.com.au   Email - [email protected]                     Endorsed
                                                                                                      Company

Page 4

                                                                                                                      -1^i
                                                                                                                         ,yyyy^^,- I,1
                                                                                                        1.^." -.^.r          ^
                                                                                                                             re eNr•y
                                                                                                                                    .
                                                                                                                        r.             .;6 1




Application Details - IDAS form 1
(Sustainable Planning AG 2009 version 1.0 effective 18 December 2009)


You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•     complete this form (Application details - IDAS form 1)
•     complete any other forms relevant to your application
      provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


Name/s (individual or company name in full)                  DIRECTOR OF HARBOURS & MARINE


For companies, contact name

                                                             C/- The Jetty Specialist, 2 Industrial Av, Caloundra Old
Postal address
                                                             4551

Contact phone number                                         5492 5925

Mobile number (non-mandatory)

Fax number (non-mandatory)                                   5492 6699


e-mail address (non-mandatory)                               [email protected]



1. What Is the nature of development proposed? (tick all applicable boxes)

q    material change of use of premises
q    building work
     operational work
q    reconfiguring a lot

Page 5

2. What type of approval is being sought?

® development permit
q preliminary approval
q both - provide details below


3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

® No
q    Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premise s

                                                                                  Lot on plan
                Street Address
                                                                                  description
                                                                                                       Local government area
                Unit   Street       Street name and official         Post              Plan type         (e.g. Logan,Caims)
                                                                            Lot No.
                No.     No.          suburb/locality name            code             and plan no.

            1          2        Russell St, Noosaville           4566       157       SP143417       Sunshine Coast

q Street address / lot on plan
® Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
  water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

                Coordinates (note: place each set of
                coordinates in a separate row)                           Zone                                Local government
                                                                                          Datum
                                                                       reference                             area (If applicable)
                 Easting        Northing     Latitude    Longitude
                                                                                      q GDA94
                                                                                      q WGS84
            1
                                                                                      q other

5. Total area of the premises on which the development is proposed (indicate hectares or m')
21 m2
6. Current uses of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


        1       Boating & Fisheries Patrol



7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.) J

New pontoon system including existing access gangway and restraint piles




                                                                                                     V, i_rc^, 1 1' 7; (., t F.ml^^ r llnic

Page 6

18. Is owner's consent required for this application? (refer to notes at the end of this form for more information)


    [] No

    ® Yes - complete either table D. table E or table F as applicable


i
    Table D (note: do not complete this table if lodging the application on-line using Smart eDA)



    Name of owner/s of the land


    I/We, the above-mentioned owner/s of the land, consent to the making of this application



    Signature of owner/s of the land                                                  (6'7 Fjt,%+ x/11 ^^i


    Date                                          10      ZOI


    Table E


    I Name of owner/s of the land

     n The owner's written consent is attached or will be provided separately to the assessment manager


    Table F


     Narne of owner/s of the land

           By making this application. I. the applicant. declare that the owner has given written consent to the making of
           the application


    9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
    materials. Refer to the notes at the end of this form for more information)


        No                           0 Yes - complete table G

Page 7

Table G - state owned resources (provide details for more than one state-owned resource click on add another
resource button below)


Nature of state-owned resource               Unallocated State Land



                                            q Evidence of an allocation of, or an entitlement to, the resource


                                              Evidence the chief executive of the department administering the
Nature of evidence required (tick the
applicable box and attach a copy of the     q resource is satisfied the developments is consistent with an allocation
                                              of, or an entitlement to, the resource
evidence to this form)

                                                  Evidence the chief executive of the department administering the
                                                  resource is satisfied the development application may proceed in the
                                                  absence of an allocation of, or an entitlement to, the resource




110. Identify if any of the following apply to the premises (tick applicable box/es)

       adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
q      on strategic port land under the Transport Infrastructure Act 1994 - complete table I
       in a tidal water area - complete table J


Table H       Name of water body, watercourse or aquifer

              Noose River

              Name of local government for the tidal area           Port authority for the tidal area
Table J
              (if applicable)                                       (If applicable)

          1   N/A


11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
    water, etc.)

®No       q Yes - ensure the type, location and dimension of each easement is included in the plans submitted

12. Does the proposal include new building work or operational work on the premises? (inducing any
    services)

q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
    end of this form for more information)

® No - Go to question 15                   q Yes




                                                                                                                  I( .n,, l nn,
                                                                                                             I   . wriht     1i

Page 8

15. Has the local government agreed to apply a superseded planning scheme to this application under
    section 96 of the Sustainable Planning Act 2009?


     No
0 Yes - provide details below


16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                 Method of lodgement to
                             Description of attachment or title of attachment
                                                                                                  assessment manager

            1    IDAS FORM 24                                                                    mail



            2    ENGINEERED PLANS & CERTIFICATE                                                  mail


            3    REGIONAL HARBOUR MASTER REFERRAL RESPONSE                                       mail



            4    EVIDENCE OF RESOURCE ENTITLEMENT                                                mail



17. Applicant's declaration

 ® By making this application, I declare that all information in this application is true and correct (note: it is
     unlawful to provide false or misleading information).




                                                                                                                      IOAS fin II t
                                                                                              1'r;; loti 7 (, i i (Ir^.f (, t,et ?U(1

Page 9

Prescribed tidal work - IDAS form 28
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


This form must be completed for development applications for prescribed tidal work.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications you must:
•     complete Application details - IDAS form 1
•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

11. What type of approval Is sought?

    development permit
q preliminary approval

2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)


                                                   Private use      Non-private use   Estimated value of completed works ($)

q jetty, pier or wharf
q    mooring pile
q deck or boardwalk
q boat ramp or spillway
Z pontoon
q revetment, sea wall or retaining wall
q other - please specify below

3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
the lot are connected to the work and neighbouring lots are not at right angles to the waterway?

®     No           q      Yes

4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the
works comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)

q     No           ® Yes - provide details below

Page 10

    1-1
Engineers name/s                              Paul Calver
Organisation name (if applicable)             Cardno (Qld) P/L

Postal address                                Locked Bag 4006, FORTITUDE VALLEY QLD 4006

Contact phone number                          3369 9822
Fax number (non-mandatory)                    3369 9722
e-mail address (non-mandatory)
RPEQ number (or equivalent if
interstate)                                   1667

Reference number of all plans to which this certification relates             JSP-SJ-23890B/JSP-SJ-23891 B/JSP-SC-045A/JSP-
                                                                              SD-142E/JSP-SD-10OB/JSP-GW-006E
15. Confirm the following mandatory supporting information accompanies this application

Plans certified by a registered professional engineer of Queensland
                                                                                  Confirmation of              Method of
(RPEQ) (or an interstate or international equivalent registered with
                                                                                    lodgement                  lodgement
the appropriate professional body) showing:

the location (real property description and boundaries) and dimensions
of the proposed works in relation to the land (including tidal land) that          confirmed            mail
would abut or adjoin the proposed works

the proposed works in relation to the locations and levels of lowest
astronomical tide, highest astronomical tide, mean high water springs           ® confirmed             mail
and the coastal management district
the slope angles of the beds and banks of the tidal area and the finished
                                                                          ® confirmed                   mail
levels of the proposed works
Written statements or evidence

a copy of the certificate of title for the land (including tidal land) that
                                                                                   confirmed            mail
would abut or adjoin the proposed works

details of how the proposed work addresses the IDAS code for
prescribed tidal work in the Coastal Protection and Management                     confirmed            mail
Regulation 2003, schedule 4A
                                                                                   confirmed
details of the largest vessel, if any, to be moored at the structure                                    mail
                                                                                   not applicable

evidence that the proposed work will not prejudice the access rights of
adjoining property owners in the form of:
                                                                                   confirmed            mail
          •   letters of support from adjoining property owner; or
          •   plans illustrating a water allocation area.

For applications within a cul-de-sac, a bend in the waterway or
other location where the side boundaries of the lot connect to the
work and neighbouring lots are not at right angles to the waterway
must also provide:

photos of any constructed neighbouring structures or information about          q confirmed
approved but unconstructed neighbouring structures.                                not applicable


Privacy - please refer to your assessment manager for further details on the use of information recorded in
this form.




                                                                                           Prescribe('' tidal work - IDAS form 28
                                                                                                Version 1.0 18 December 2009

Page 11

                                                                                          ^^ Cardna
                                                                                                        Ullman& Nolan
                                                                                                        Shaping the Future


 Our Ref      B7900-05-008(233)
                                                                                                           Cardno (Old) Pty Ltd
 Contact     Paul Calver                                                                                   Trading as Cardno Ullman & Nolan
                                                                                                           A2N 57 051 074 992



 7 September 2011                                                                                          Level 11
                                                                                                           515 St Paul's Terrace
                                                                                                           Fortitude Valley OLD 4006
The Manager                                                                                                Australia
The Jetty Specialist Pty Ltd
2 Industrial Ave                                                                                           Locked Bag 4006
                                                                                                           Fortitude Valley OLD 4006
CALOUNDRA QLD 4551
                                                                                                           Australia

 Dear Sir
                                                                                                           Phone: 61 7 3100 2199
                                                                                                           Fax:    61 7 3369 9722

 Structural Design Advice                                                                                  www.cardno.com.au


Project:                Proposed Pontoon Replacement
Owner:                  Director of Harbours & Marine
Address:                Lot 157 (2) Russell Street, Noosaville


We, Cardno Ullman & Nolan Pty Ltd, advise that the proposal to construct the
works described above has been checked by us. When the works are constructed
in accordance with the approved drawings and in the location shown, the proposed
works are structurally adequate for the anticipated usage in this location and
should comply with the minimum acceptable standards detailed in the EPA
operational policy for Building and Engineering Standards for Tidal Works, based
on the design criteria, and assumptions listed below.


Basis of Design Advice

             •      The works do not impose loads that would significantly affect existing
                    structures
             •      The works do not adversely affect the stability of the bed and banks in
                    the near vicinity of the structure
             •      Structural design criteria:

Floating Pontoons Deck Load                              3 kPa or 4.5 kN
Maximum Wave Height                                      400mm wind wave
                                                         300mm boat wake
Wind Classification                                      N3
Max. Current                                             1.4 m/s
Impact Loads                                             Minor loads without some damage to structure
Relevant Codes                                           AS1170, AS 3962 and AS 3600, except where
                                                         varied by the EPA Guidelines




Australia • Belgium • Indonesia • Kenya • New Zealand • Papua New Guinea
United Kingdom • United Arab Emirates • United States • Operations in 60 countries
I.\b7900-05\sub008\233-directs of harbours 8 marine\word\design advicel.doc

Page 12

                                                                               2             Car'dna
 7 September 2011                                                                            Ullman& Nolan


This design advice does not cover the construction or installation of the works on site. The Builder shall
confirm the adequacy of the site conditions during installation and shall advise the Engineer in writing if
variation from details shown on the drawings occur. No detailed site investigation or studies have been
carried out by us or provided to us. The design review has been carried out on the basis of limited
enquiry only. Pile depths shown are applicable to founding in stiff clay or dense sand. There is some
additional risk of failure should the above design criteria be exceeded, or actual site conditions be
inferior to those assumed. If ground conditions other than those described above are encountered
during construction or seabed levels encountered are deeper than those shown on the drawings,
further advice should be sought.

This design advice relies on standard designs prepared by other consultants, but does not warrant
them.

The structure is to be built in accordance with the following referenced documentation, using good
building practice.


Referenced documentation

             •     Drawing No. JSP-SJ-23890 B
             •     Drawing No. JSP-SJ-23891 B

Competent Person Details

Name: Paul Calver BE RPEQ 1667

Name of firm for and on behalf person is signing:

             Cardno Ullman & Nolan
             Level 11 Green Square Nth Tower
             515 St Paul's Terrace
             Fortitude Valley QId 4006

Postal address:

             Locked Bag 4006 Fortitude Valley
             OLD 4006 Australia

Phone: (07) 3100 2199                                          Fax:         (07) 3369 9722

Reference:               B790005-008 (233)

Signature of competent person:



for Cardno Ullman & Nolan




I:\b7900-05\sub008\2334vedor of harbours & marine\word\des'gn ads cel.doc

Page 13

                                                                                          Queensland
                                                                                          Government

    23 September 2011                                                                        Department of
                                                                                             Transport and Main Roads



    The Jetty Specialist
    2 Industrial Avenue
    Caloundra Qld 4551



    Dear Sir


    Operational Work, Prescribed Tidal Works - Request for comments
    Pontoon replacement - DEEDI, 2 Russell Street, Noosaville (Lot 157 on SP143417)

    Thank you for your letter of 1 September 2011 about your proposal to construct a replacement
    pontoon at the location mentioned above.


    As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
    following navigation and marine safety conditions are complied with.

    1.   The contractor must build the pontoon according to The Jetty Specialist, Drawing No JSP-SJ-
          23890, Issue B attached to your letter dated 1 September 2011.

    2.   No part of the structure or any ship berthed at this structure is to come closer than I.5metres from
         the side boundaries of the allocated water space as shown on the submitted water allocation plan
         JSP-SJ-23890, Issue No B.

    3.   The pontoon/jetty and all freestanding piles must be lit and clearly visible to approaching vessels.
          The contractor must position all lighting so it does not cause a risk to the safe navigation of other
          vessels.

    4.   The applicant or his agent is responsible for the removal of any existing structure above or below
         the waterline, and must contain and remove any debris. Any pile that needs to be removed must
         be totally extracted.


    5.   The ship moored at this pontoon must follow the most direct course from this structure to open
          waters and a similar direct course when returning to this pontoon.




Department of Transport and Main Roads                  Our ref     215/01287 P7227. E7309
Maritime Safety Queensland                              Your ref
Marine Operations (Brisbane)                            Enquiries   James O'Connor
MacArthur Avenue East                                   Telephone +61 7 3860 3504
Pinkenba Queensland 4008                                Facsimile   +61 7 3860 3571
                                                        Website     www.msq.gld gov.au
                                                        Email       [email protected] gov.au

Page 14

6.   The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
      clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
     depths and draft restrictions.

7.   Any ships and equipment you or your agent use must comply with the Transport Operations
     (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
     Transport Operations (Marine Pollution) Act 1995.


8.   Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
      1994 and the Transport Operations (Marine Safety) Regulation 2004.


9.   Any ship moored at this pontoon/jetty must not impede the safe navigation of other ships or
     restrict safe access to or from neighbouring structures.


10. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
    pontoon/structure must not exceed the following sizes:

         Wet Berth                                                 Dry Berth/Air Lifting Pontoon
     Length Overall -         8.0 metres                           Length Overall -     N/A
     Beam -                   3.5 metres                           Mass -               N/A


11. The contractor must construct the pontoon/jetty within two years from the date of approval. If
     construction is not completed, you will need additional or amended comments from the Regional
      I larbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.



Yours sincerely




Captain Glenn N Hale
Acting Regional Harbour Master (Brisbane)




                                                                                                Page 2 of 2

Page 15

                                                                          Queensland
                                                                           Government

Author: Charmaine Duke                                                     Department of
File / Ref number: 2011/006105                                             Environment and Resource
Directorate / Unit: State Land Asset Management                            Management
Phone: (07)54512243


29 November 2011


Attn: Trish
The Jetty Specialist
2 Industrial Avenue
CALOUNDRA QLD 4551



Dear Trish

APPLICATION FOR RESOURCE ENTITLEMENT - LOT 157 ON SP143417,
NOOSAVILLE .

Reference is made to your request for your clients for evidence of resource entitlement
required to accompany their development application for proposed new pontoon system
including existing access gangway and restraint piles.

I wish to advise that the proposed development is consistent with an allocation of, or an
entitlement to, the resource. A copy of this letter is to be attached to your IDAS Form I as
the required evidence for Table G.

Although evidence of resource entitlement to your development application has been
provided, you are always required to comply with the purpose, terms and conditions of your
"tenure" over Lot 157 on SP143417 and undertake works only if and when the development
application has been approved by the assessment manager, and in accordance with the
conditions of that approval.

You will also need to comply with all other legislative and regulatory requirements which
may also include approvals that are not part of the assessment of the development
application under the Sustainable Planning Act 2009 (SPA) e.g. a marine park permit if in a
marine park.

Further, please note that the above evidence will expire on 29 May 2012. Should the
development application not be lodged with the assessment manager prior to this date, you
will be required again to lodge the IDAS Form I and any attachments with this Department
with a further request for evidence of resource entitlement - any further request will need to
be reconsidered by the Department.



Office :                                   Postal :                Telephone : (07)54512215
DERM Nambour                               DERM Nambour            Fax: 54512262
Floor I. Centenary Square                  Po Box 573
Currie Street                              Nambour
Nambour QI.D 4560                          4560 QLD

Page 16

I would also like to advise that any land use activities must comply with the Aboriginal
Cultural Heritage Act 2003 or the Torres Strait Islander Heritage Act 2003

Finally, providing evidence of resource entitlement is required under SPA to enable your
application to be considered properly made for lodging with the assessment manager and is a
completely separate process to assessment of the application under SPA.

Accordingly, the Department may act at a later date as assessment manager,
concurrence/referral agency, or advice agency in the assessment of the development
application - providing evidence of resource entitlement will not influence any statutory role
the Department may have in this assessment.

If you wish to discuss this matter please contact Charmaine Duke on (07)54512243.

All future correspondence relative to this matter is to be referred to the contact Officer at the
address above or by email to SLAM [email protected] v.au. Any hard copy
correspondence received will be electronically scanned and filed. For this reason, it is
recommended that any attached plans, sketches or maps be no larger than A3-sized.

Please quote reference number 2011/006105 in any future correspondence.

Yours sincerely




Matthew Halls
Acting Senior Land Officer
A duly authorised delegate of the Chief Executive
under the current Land Act (Chief Executive) Delegation




                                                                                                    2

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.