Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Development Application part 1 of 2 · OPW11/0409

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                          Queensland
                                                                                          Government

    23 September 2011                                                                        Department of
                                                                                             Transport and Main Roads



    The Jetty Specialist
    2 Industrial Avenue
    Caloundra Qld 4551



    Dear Sir


    Operational Work, Prescribed Tidal Works - Request for comments
    Pontoon replacement - DEEDI, 2 Russell Street, Noosaville (Lot 157 on SP143417)

    Thank you for your letter of 1 September 2011 about your proposal to construct a replacement
    pontoon at the location mentioned above.


    As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
    following navigation and marine safety conditions are complied with.

    1.   The contractor must build the pontoon according to The Jetty Specialist, Drawing No JSP-SJ-
          23890, Issue B attached to your letter dated 1 September 2011.

    2.   No part of the structure or any ship berthed at this structure is to come closer than I.5metres from
         the side boundaries of the allocated water space as shown on the submitted water allocation plan
         JSP-SJ-23890, Issue No B.

    3.   The pontoon/jetty and all freestanding piles must be lit and clearly visible to approaching vessels.
          The contractor must position all lighting so it does not cause a risk to the safe navigation of other
          vessels.

    4.   The applicant or his agent is responsible for the removal of any existing structure above or below
         the waterline, and must contain and remove any debris. Any pile that needs to be removed must
         be totally extracted.


    5.   The ship moored at this pontoon must follow the most direct course from this structure to open
          waters and a similar direct course when returning to this pontoon.




Department of Transport and Main Roads                  Our ref     215/01287 P7227. E7309
Maritime Safety Queensland                              Your ref
Marine Operations (Brisbane)                            Enquiries   James O'Connor
MacArthur Avenue East                                   Telephone +61 7 3860 3504
Pinkenba Queensland 4008                                Facsimile   +61 7 3860 3571
                                                        Website     www.msq.gld gov.au
                                                        Email       [email protected] gov.au

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.