Council archive · source document
07/1017 - Response to Info Request [As Published] · 142007.1017
Deliver To : 9 Pelican Street Tewantin Qld 4565
ALAN SINCLAIR & ASSOCIATES PTY LTD
PO BOX 217 NOOSA HEADS QLD 4567
PHONE 5442 4644 FACSIMILE 5442 4767
4 TRANSMITTAL OF DOCUMENTS
€
ACT : ae f@
AETH’ TRADE:
TO Noosa Shire Council DATE 06.07.07
PROJECT 18 Douglas St Sunshine Beach ATTENTION
DRAWING DESCRIPTION COPIES
Landscape Drawings by Landgraphics
LA 1201 LAQIA Landscape Finishes Plan and Details 4 no.
LA 1201 LA 02 A Landscape Finishes & Planting Plan & Datails 4 no.
LA 1201 LA OG A Landscape Planting Plan, Detaiis & Specification 4 no.
v
-6 JUL 2007
WCOSASHIRE COUR Fo,
FRONT COUNYSR =
ETE
SENT FOR: For Information x Your Approval
Remarks Further submission of information to support Application for Operational
Works Approval to the above mentioned project.
File Number 2007 / 1017
( Receipt No. 00291019:0001 )
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
LU
c 100sq Posts. Footing 150x75 joists and bearers.
to engineering detail Excavate if required to achieve
a minimum 50mm clearance
between timber and ground
150x35 timber decking
Level 1 pond to architectural detail Garden bed Pool pavers on concrete
OTE TM TT woe > as specified and mortar and detailed
Lge “ a oe a - Oe “oa oe ’ ‘ Le Pool Paving as specified &
or — - detailed
Pond circulation t 7 SR hie serene re Pool Coping tile as specified
| ‘ond circuval fon lo Me } 4 DUPRE OD LEELA CELE eet etal
ee 4 Speer NOOR, PE —
cmanmieemeie (ale EE PSD TTS ee 7] ous
yr. \N \ WN S\N ——
' YY Y, oN IY
i Y ‘ Uy Z 4 Le Ui 600 & 400 sq concrete
tinea sen AS kee se
AN NS N IN 80mm depth gravel as
, R y Ye detailed & specified
sy \ A
92 era bees d o7 pond to match level 1 pond uo a
Re << awd POOL DECK - DETAILED SECTION Scale 1:20 a.
ORR RE QRS Ky SSA AA” - caile 1.
IM VII IY YY YY yyy YY YR . , PUUL VEVA = VEITAILEY vevVreasOLCCCtC eee’ Bush boulders as scheduled
BORA OORNKRKRN RR ‘NO no of Bearers and Hardwood sleopor as
AK Joists as shown 70x35 iy detailed & specified
x Battens 100x50
N . Joist Timber Storage Room wall
GROUNDLEVEL WATER FEATURE & PEBBLE AREA - SECTION Scale 1:20 Gif spo gon ade gan 1.2m igh poo fence as
yO 450x75 1.8m high timber fence
2 Beams p
i Timber platform as detailed
150sq Posts. Footing to
5 engineering detail
70x35 Battens
POOL DECK - DETAIL PLAN Scale 1:25
70x35 Batten upright fixed
to post. Allow one
additiona! upright at centre
point of horizontal battens
for strength
2500
150x75 joists and bearers.
MATERIALS NOTE Excavate if required to achieve a
*All timber to be F14 Hardwood ae mr and ground
70x35 Battens doubling as
Allow for 1 large, 1 *All fixings to be galv. steel 600sq scheduled pavers back rest
medium and 7 small bush on compacted subgrade ACK TES
rock as scheduled *Construction and detailed design to and co eaing on
follow industry best practices Turf as detailed Timber seat built into the
Allow for 2 medium and 1 3 shelter framework
small bush rock as nN
scheduled Allow for 1 large, 4 150x35 timber decking
medium and 3 smail bush ee -:
rock as scheduled BUSH ROCK SCHEDULE pd
Small 200-300mm in any direction OOS IED OIYP) ISS fs b
Medium 500-600 in any direction Le CARRY KX ARRAY RRR
Large 700-800 in any direction Yj R Pi; x SAS*
* g NS
Stooper and paved aide Bush rock to be smooth/round faced and . ‘S S ~ NN ~ Garden bed as specified
access as detailed free from chips and scraps. 100sq Posts. Footing to —~Z Ke At
A N S WS
* Bury all rock generally 1/2 the rock depth. engineering detail 3}. S D> y -S
* Rock selection and burying depths to be aN “
approved prior to installation..
1200 height ARC 'Reef
Glass Fence and gate or TIMBER SHELTER - DETAILED SECTION Scale 1:20
approved equivalent
Rendered blockwork fence
to architectural detail
Cc a a
LANDGRAPHICS
1200 height ARC 'Ret oo >
Glass Fence or approved Pan ge RGR
equivalent MIC LANDSCAPE ARCHITECTS
y Principal: Robert J. Burrell
I: Fi
2nd Floor Esplanade and Second Building, Maroocrydore
P.O. Box 18 Maroochydore 4558
[email protected]
‘ww landgrapnice.com,
Tet: (07) 5443 4044
Far, (07} 5443 4534
COPYRIGHT: No reproduction of all or part of this crawing may be undertaken wahout
1200 height ARC ‘Reef ‘he express wetien permission of fe ater.
Glass gate or approved
equivalent SUNVIEW VILLAS
Client
6 Horizontal battens Mr. J CAMERON & Mr. J McCormax
along side of shelter as
per section
Enclosed area for garden
tool and beach toy storage
Architect
WILL FRANKLIN DESIGN
Sleeper and paved side
access as detailed Poot Deck as detailed
Centre upright batten to
stabilise horizontals
Line of deck D Tite
rawing
LANDSCAPE FINISHES PLAN &
DETAILS
1800 height timber fence
Enclosed area for garden
tool and beach toy storage Irregularly space and
align joists and battens
as shown
Timber shelter as detailed Centre upright batten to
stabilise horizontals
Maintain free of battens
this side
9 Horizontal battens
along back of shelter as
per section
1200 height ARC
Aluminium 'Byron' Fence
or approved equivalent
pp 4 150sq Post
FINISHES PLAN . Scale 1:150 TIMBER SHELTER - MIDDLE PLAN Scale 1:25 TIMBER SHELTER - UPPER PLAN Scale 1:25
Page 3
—
i
Level 1 pond to architectural detail
. ME OL EE
Pond circulation to
Stainless steel spitters
Garden bed as specified
80mm specified grave!
on compacted sub-base
erie bee SY So
pond to match level 1 pond
LONE Le52 FSO? ES LE
x SRO NONI” ” geonerete pond sh }
YU II RP YY Hd OUY~OOID\y
BEKO ORR RRR ORIN /
SW
WV
GROUNDLEVEL WATER FEATURE & PEBBLE AREA - SECTION Scale 1:20
Allow for 2 medium and 1
Small bush rock as
scheduled
Rendered blockwork fence
to architectural detail
i
eS
cso
Sees ti
i
Ge
Ne
He
YEOIA
EKSXS
On
1200 height ARC 'Reé€
Glass Fence or approved
equivalent
1200 height ARC 'Reef
Glass gate or approved
equivalent
Sleeper and paved side
access as detailed
Enclosed area for garden
tool and beach toy storage
Allow for 1 large, 1
medium and 1 small bush
rock as scheduled
medium and 3 smatl bush
5
~
2
Q
co ©
st ES
sc) a
*
oe
PSG
ga
.
Align decking 45° to the
line of bearers and
joists as shown
POOL DECK - DETAIL PLAN
Sleeper and paved side
access as detailed
1200 height ARC 'Reef
Glass Fence and gate or
approved equivalent
Enclosed area for garden
tool and beach toy storage
Pool Deck as detailed
1800 height timber fence
Timber shelter as detailed
1200 height ARC
Aluminium ‘Byron’ Fence
or approved equivalent
FINISHES PLAN Scale 1:150
MATERIALS NOTE
*All timber to be F14 Hardwood
*All fixings to be galv. steel
“Construction and detailed design to
follow industry best practices
BUSH ROCK SCHEDULE
Small 200-300mm in any direction
Medium 500-600 in any direction
Large 700-800 in any direction
* Bush rock to be smooth/round faced and
free from chips and scraps.
* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..
Q
Line of decking
Pavers
150sq Pos'
Maintain free of battens
this side
150sq Post
TIMBER SHELTER - MIDDLE PLAN
G
Scale 1:25
150x765 joists and bearers.
Excavate if required to achieve a
minimum 50mm clearance
between timber and ground
2500
600sq scheduled pavers
on compacted subgrade
and compacted 40mm
bedding sand
Turf as detailed
as specified
150x75 joists and bearers.
Excavate if required to achieve
a minimum 50mm clearance
between timber and ground
100sq Posts. Footing
to engineering detail
150x35 timber decking
arden bed /
Pool pavers on concrete
and mortar and detailed
c va — $$ eer
4
a
eA
SEE RO
< \ N S\
ca pu
RO //
POOL DECK - DETAILED SECTION Scale 1:20
70x35
Battens 100x50
Joist
Mi Oh XM ff b ii i HAE Of MB
a |
150x75
oo Beams
150sq Posts. Footing to
engineering detail
70x35 Battens
70x35 Batten upright fixed
to post. Allow one
additional upright at centre
point of horizontal battens
for strength
70x35 Battens doubling as
back rest
Timber seat built into the
2 shelter framework
150x35 timber decking
SOS A ON IRR Oy yO IIPS INF; i
i} Ke GU ZR ROS
sre Gl eS FN
rt NS &K \ \ Ke
100sq Posts. Footing to 2 S x x x N Garden bed as specified
engineering detail s S \ B Sy : NN
W7PW
along side of she
per section
Centre upright batten
stabilise horizontals
Centre upright batten to
stabilise horizontals
9 Horizontal battens
along back of shelter as
per section
Scale 1:25
6 Horizontal battens
Scale 1:20
Iter as
to
Irregularly space and
align joists and battens
as shown
TIMBER SHELTER - UPPER PLAN Scale 1:25
m
@
m™
=
oO
\
Poot! Paving as specified &
detailed
>
od
SO
Do
Dp
Pool Coping tile as specified
& detailed
an
Poured coloured concrete as
specified & detailed
600 & 400 sq concrete
Pavers as specified and
detaited
80mm depth gravel as
detailed & specified
ra
ie
Turf as Specified
Bush boulders as scheduled
Hardwood sleepers as
detailed & specified
Timber Storage Room wall
1.2m high poo! fence as
specified
1.8m high timber fence
Timber platform as detailed
SS.
AMENDMENTS
date
27.06.07
ORIGINAL ISSUE
c a ad
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principat: Robert J. Buel
2nd Fino. Esplanade and Second Building, Marcocydore
P.O. Bax 18 Maraochydore 4558
[email protected]: (07) 5443 4004
Fax:
COPYRIGHT : No repronuction ot all or pant of hls drawing may be undertaken wibout
the Express watiten permission of he autor
SUNVIEW VILLAS
Chent
Mr. J CAMERON & Mr. J McCormax
Architect
WILL FRANKLIN DESIGN
Drawing Tite
LANDSCAPE FINISHES PLAN &
DETAILS
c
| sae | snow oat | shown GA
Lat201 oora | A
hecked: RB
late.
Ye:
heel.
Page 4
c=
=
Level 1 pond to architectural detail
LEE LE cere OG Y
. OYE LE JE KL Z a LLL
Pond circulation to ee ve
stainless steel spitters %
Garden bed as specified ee
re PV)
G AA
80mm specified gravel ELS
on compacted sub-base if
PAS
Y.
ob A
pond to match level 1 pond
* ’ 4.
Align decking 45° to the
line of bearers and
joists as shown
GROUNDLEVEL WATER FEATURE & PEBBLE AREA - SECTION Scale 1:20
—————oEeyy——emeeee wh PAINE & FEBGLE AREA ~ SECTION Scale 1:20
POOL DECK - DETAIL PLAN Scale 1:25
Allow for 1 large, 1
medium and 1 small bush
rock as scheduled
Allow for 2 medium and 1
small bush rock as
scheduled Allow for 1 large, 4
medium and 3 smalt bush
rock as scheduled
Sleeper and paved side
access as detailed
1200 height ARC ‘Reef
Giass Fence and gate or
approved equivalent
Rendered blockwork fence
to architectural detail
1200 height ARC ‘Ree
Glass Fence or approved
equivalent
1200 height ARC 'Reef
Glass gate or approved
equivalent
Enclosed area for garden
tool and beach toy storage
Sleeper and paved side
access as detailed Pool Deck as detailed
1800 height timber fence
Enclosed area for garden
tool and beach toy storage
Timber shelter as detailed
1200 height ARC
Aluminium 'Byron' Fence
or approved equivalent
FINISHES PLAN Scale 1:150
MATERIALS NOTE
‘All timber to be F14 Hardwood
*All fixings to be galv. steel 600sq scheduled pavers
on compacted subgrade
and compacted 40mm
bedding sand
Turf as detailed
*Construction and detailed design to
follow industry best practices
BUSH ROCK SCHEDULE
Smail
Medium
Large
200-300mm in any direction
500-600 in any direction
700-800 in any direction
* Bush rock to be smooth/round faced and
free from chips and scraps.
* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..
Line of dec) A,
x7
&g y
Pavers
150sq Pos!
Maintain free of batténs
this side
9 Horizontal battens
along back of shelter as
per section
150sq Post
TIMBER SHELTER - MIDDLE PLAN
150x785 joists and bearers.
Excavate if required to achieve a
minimum 50mm clearance
between timber and ground
100sq Posts. Footing to
engineering detail
Garden bed
as specified
150x75 joists and bearers.
Excavate if required to achieve
a minimum 50mm clearance
between timber and ground
100sq Posts. Footing
to engineering detail
150x35 timber decking
Pool pavers on concrete
and mortar and detailed
2500
200
Ze ay
SEG
AVPAW)>s
per section
Centre upright batten to
stabilise horizontals
Centre upright batten to
Stabilise horizontals
Scale 1:25
POOL DECK - DETAILED SECTION
6 Horizontal battens
along side of shelter as
a oan ED
¢ Jae 3Y6 j LE ELENLD) DN ACE LOCA LEC LEOL
OLE KRG UR ORG
WS S SN WN
aL] K LEK
qe N Z
RR!
Scale 1:20
70x35
Battens 100x50
Joist
ih i fi fF Ah fh fh A ff
150x75
Beams
150sq Posts. Footing to
engineering detail
70x35 Battens
70x35 Batten upright fixed
to post. Allow one
additional upright at centre
point of horizontal battens
for strength
150sq Posis
Footing. to
engineering detail
70x35 Battens doubling as
back rest
Timber seat built into the
shelter framework
150x35 timber decking
2
W Sy
xe
» Garden bed as specified
S
Scale 1:20
TIMBER SHELTER - UPPER PLAN Scale 1:25
LEGEND -
Cx
Be
By
Pool Paving as specified &
detailed
Pool Coping tile as specified
& detailed
i)
Poured coloured concrete as
specified & detailed
600 & 400 sq concrete
Pavers as specified and
detailed
80mm depth gravel as
detailed & specified
Turf as Specified
Bush boulders as scheduled
Hardwood sleepers as
detaited & specified
Timber Storage Room wall
1.2m high poot fence as
specified
1.8m high timber fence
Timber platform as detailed
SINISE
=
c a a
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J. Burred
2nd Floor Esplanade and Second Building, Macoocnydore
P.O. Box 18 Maroochydore 4558
otal
COPYRIGHT : No reproduction of all or pant of this crawing may be unoenakan wihaut
the express wrinen Athen.
SUNVIEW VILLAS
Client
Mr. J CAMERON & Mr. J McCormax
Architect!
WILL FRANKLIN DESIGN
Drawing Tate
LANDSCAPE FINISHES PLAN &
DETAILS
Date: vune "07
Sea show GAi
ake:
Sheet. Issue:
Ot OF 03 A
Job No.: Drawing:
LA1201 LAot
Page 5
Le
100sq Posts. Footing 150x75 joists and bearers.
to engineering detail Excavate if required to achieve
a minimum 50mm clearance
between timber and ground
150x35 timber decking
Level 1 pond to architectural detail Garden bed Pool pavers on concrete
: as specified and mortar and detailed
“7 Pooi Paving as specified &
0 detailed
/ Z fe ii pA q Pool Coping tile as specified
Fond circulation to 4 VE ‘ Aoi OID TESTS LER POA Pee LEER hehe & detailed
stainless steel spitters fees SSpsoy REQ Ye XZ (7, Pr ERS PGR DEES!
Og CD LL Sy NS, S PII Poured coloured concrete as
Garden bed as specified SZ a) : O UR GZ Y Ye UY Yo specified & detailed
GQ Vir YY) Y 600 & 400 sq concrete
80mm specified gravel Eh x NG pavers as specified and
on compacted sub-base a : Zp x detailed
ye HN jolnled f speed ®
pond to match level 1 pond ace WY
Oe he ig LERNER : Le Turf as Specified
LL lE
ARRON DLVPR RG .
YY Wy Uy “yy Ly Uy LEY LY Align decking 45° to the
KRAKKK a a line of bearers and Hardwood sleepers as
joists as shown 70x35 y detailed & specified
Battens 100x50
Joist Timber Storage Room wall
Mi i hi A i fl fA RA fo 1.2m high pool fence as
specified
Pho
1.8m high timber fence
450x75
2 Beams r
A Timber platform as detailed
150sq Posts. Footing to
engineering detail
70x35 Battens
POOL DECK - DETAIL PLAN Scale 1:25
70x35 Batten upright fixed
50x75 d bea 2 Footing. to to post. Allow one
150x75 joists an rers. iD i i tail additional upright at centre
MATERIALS NOTE Excavate if required to achieve a “ engineering detal point of horizontal battens
* A minimum 50mm clearance for strength ,
All timber to be F14 Hardwood between timber and ground Be. ok
i E ED Yon
Allow for 1 large, 1 *All fixings to be galv. steel 600sq scheduled pavers 70x35 Battens doubling as RECEIVEN \
medium and 4 smalt bush on compacted subgrade ACK TES! -6 JUL 2007
rock as scheduled * i : i and compacted 40mm NOOSA SHIZE CCU
Construction and detailed design to bedding sand TRONT eaioree
, follow industry best practices Turf as detailed Timber seat built into the
Allow for 2 medium and 1 co u 2 shelter framework
small bush rock as “
scheduled Allow for 1 large, 4 150x35 timber decking
medium and 3 small bush —— Se
rock as scheduled BUSH ROCK SCHEDULE ne =p
Small 200-300mm in any direction OI ILE DDS DTI IOP MS SBUSOL
Medium 500-600 in any direction Gk KARRI XK AG RARE RRC SS
irectl S W Sy (IN BLOH
Large 700-800 in any direction Ce Cex RG Cx &
* 4 \ SN
Sleeper and paved side Bush rock to be smooth/round faced and A S SN SN \ S Garden bed as specified
free from chips and scraps. 4100sq Posts. Footing to 4 < KR << R
access as detailed q ig < N N N \N
* Bury all rock generally 1/2 the rock depth. engineering detail S D> y DS
‘Jj
* Rock selection and burying depths to be
approved prior to installation...
SW
1200 height ARC 'Reef
Glass Fence and gate or TIMBER SHELTER - DETAILED SECTION Scale 1:20
approved equivalent
Rendered blockwork fence
to architectural detail a
c a
4200 height ARC 'Re® LANDGRAPHICS
Giass Fence or approved
equivalent LANDSCAPE AACHITECTS
Principal: Robert J. Burret
2nd Floor Esplanade and Second Builing, Maroocydare
P.O. re 4!
1200 height ARC 'Reef GOPYRIGHT No reproayon ot to pat ot fis crwang maybe rere na
Glass gate or approved
equivalent
SUNVIEW VILLAS
Chert
6 Horizontal battens Mr. J CAMERON & Mr. J McCormax
along side of shelter as
per section
Enclosed area for garden
tool and beach toy storage
Architect
WILL FRANKLIN DESIGN
Sleeper and paved side
access as detailed Pool Deck as detailed
Centre upright batten to
stabilise horizontals
Line of deck
1800 height timber fence Drawing Tite
LANDSCAPE FINISHES PLAN &
Enclosed area for garden DETAILS
tool and beach toy storage lmegularly space and
align joists and battens
as shown
Timber shelter as detailed Cenire upright batten to
stabilise horizontals
9 Horizontal battens
along back of shelter as
per section
1200 height ARC Maintain free of ba ms
Aluminium ‘Byron’ Fence this side
or approved equivalent
PP a 150sq Post
(— _FINISHES PLAN «Sale 1°150 TIMBER SHELTER - MIDDLE PLAN Scale 1:25 TIMBER SHELTER - UPPER PLAN Scale 1:25 more Ta
Page 6
x
(Generally 2x
Depth of rootball)
Ensure pit
edges are
porous
y Xb
a
Ff,
A
Se
Generally 2x width of rootball
TREE DETAIL
2100 x 75 x 75 Hwd stakes. All
stakes to be chamfered, centrally
pointed & driven vertically into
the ground outside the rootball
Planting Area
100x100 Extruded
Concrete Edge
Approved securing material such
as Rubber tree ties or 50mm
jutemat/hessian ties in figure 8
{oops secured loosely to tree &
fixed to stake with flathead galv.
nails
Turf
Form shallow dish drain to base
of tree. Mound at pit edge
CONCRETE EDGE nts
Excavate tree pit and backfill with
100mm friable imported topsoil with
0% organic content, light
compaction only.
(Max 2% organic content). Backfill
original subgrade material, light
compaction only. Rootball to sit
on top of backfill
Slow release fertiliser to
manufacturers specifications
Cultivate subgrade to 150 depth
nts
Lay turf (Sir Walter) as specified. To be laid
along contours with staggered and close
butted joints. To finish flush with existing
and hard surfaces. Moisten to depth of
topsoil immediately after installation
Imported topsoil to 50mm
depth. To be free from mounds
and depressions. Apply
fertiliser to manufacturers
instructions prior to turf
2 OSAXSYZpb TB
4xGREco—
14x 1SOpiod
1x LEPcar
2x SY Zbb =
2x GREoo =X
Cut every second
mesh strand
La
Tool finish
ara Contraction
"atte. Joints at 6m
centres
CRRA RRRER
CONTRACTION JOINT nts
10mm Jointex
or Equiv.
20mm Deep Sealant
; Expansion Joints at
copy tet y sts 12m centres and at
KKKKKKK_s changes of concrete
type and direction
EXPANSION JOINT nts
ar
alien ft
KEE
Saw cut with
sealant or plastic
inset 35mm deep
Sawn Joints at
3m centres
2
* «
rorertrren ies pr f RO e ONTO
SESERIG ERR
20 MPa concrete. If exposed aggregate
selected, pressure wash to expose
aggregate. Colour & aggregate as
scheduled. A 1m2 finished sample must be
provided to the site superintendent prior to
commencement for approval. The sample
may form part of the final product.
Amendments to the aggregate mix ratios,
depth of aggregate exposure or CCS
Saturation, may be made at this stage.
Compacted sub-base and sub-grade
to industry standards. Supply proof
of compaction to site superintendant.
JOINTS KWH i0a“
+ Joints as detailed
POURED COLOURED CONCRETE - DETAIL SECTION
Scheduled paver on 40mm compacted
SAWN JOINT nts bedding sand.
3x ALParu Compact sub-grade
1x PlTrho 80mm depth gravel as specified
1x EUGrei
2x GREcc
Or WII ;
3x SYZbb Lb Lebo LEA veo ae () Garden bed as specified
2x ViOhed GYUYYr Zo YQ y
2x EUGrei TIRTRURERGR OSES.
4x ALParu PTR
4x EUCsur
4x DlAbre PAVER & GRAVEL - DETAIL SECTION
2x SYZbb
1x CORrub
3x DIAbre
2x SYZbb 20 MPa concrete base
4x EUGrei §-8mm non-shrink grout
Selected paver
1x DlAbre min 25mm / max 40mm mortar bed
1x PlTrho Cement/water bonding slurry
2x AUSbb
installation AX LEP Cat oes 1x EUGrei
“ROE oN F Compacted sub-base and sub-grade
Topco oe oe LU NEL YS 3x DiAbre 1 to industry standards. Supply proof
Fi Ti | Fi FT | | FT m nee f 4x ALParu 2x AUSDD of compaction to site superintendant.
ees Oe ee ee ee 4x GREcc
Poti bt ti Et +x HYMfla JOINTS
|— = | — |—| | i—| | |— 2. + Concrete joints as detailed
| (—} | (4 I FS IIE 41x DIAb
1xLEPcar NY eee POOL PAVING - DETAIL SECTION
3 x 2 2x SYZbb
9 4 Se 2x WESfru
6 DRA
ALParu 4
2x DiAbre RF ~~ 2x ISOnod 2x ViOhed
1x EUGrei SX WY \
TURF - SECTION 1x AUSbb 2 me A 1x ACRimp
N 2x LINmon a 2x EUGrei
42x ANIgem “ 4x CORrub 2x DIAbre
\
4x PANjas \ 2x ALPary 0% VIOned
on stainless 2x ALPany 3x LINmon 2x BANaem Pre formed concrete haunch with set
steel strung 2x CORmub ox ALPans 3x CORmub Y12 reo bar at approx. 800mm ctrs.
ire trellise , 4x AUSbb S Xm AUSbb Hi 200x75 Hardwood sleeper with max 20mm
y x . x ViOhed N F pre-drilled holes for reinforcement bars.
PLANT SCHEDULE - SS tx EUGrei » 2xEUGrei ~ 1x EUGreI Hole not to continue through top face.
pastes 5x ALParu 1x a S |
CODE SCIENTIFIC NAME COMMON NAME SIZE Qty : 1x EUGrai > i Compact sub-grade
2x EUGrei > ge ~ Fe
Trees 1x ALParu 2x AUSbb SD 5 » 80mm depth gravel as specified
ARCcun Arcontonphoenix cunninghamia Bangalow Palm 100L 2 4x LINmon 5x VIOhed s Re 4) 7. 777A)
45L 3 2x ALParu 3x CORrub . TA Sa) Y Us
BANaem Banksia aemula Wallum Banksia 45L 4 2x CORrub 1x SyZbb CORrub 5x LINmon Se 2x ViOhed s LOLS
EUCsur Eucalyptus ‘Summer Rea Summer Red Gum 45L 2 x ru Cer 2x DiAbre BDA
HYMfla Hymenosporum flavum Native Frangipanni 45L 3 2x DlAbre 4x LINmon IMIS
PiTrho___Pittosporum rhombifolium White Holly 45 6 1x ALParu 5x VIOhed aN 1x WESfru KG
1x ALParu SA X)
Shrubs 7 4x AUSbb 2xviohed SLEEPER & GRAVEL - DETAIL SECTION
ACRimp Acronychia imperforata Logan Apple 300mm 7 4x EUGrei 2x ACRimp ———_—_—_ ees Se oer ereeeE eovrerteeess
ALPa = Alpinia arundetliana Dwarf Ginger 200mm 32 x rel
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 23 3x DiAbre
CORrub _ Cordyline rubra ‘Red’ Red Palm Lily 200mm 27 4x PITrho 3x DIAbre
EuUGrei Eugenia reinwardtiana Beach Chery 200mm 20
LEPcar Leptospermum ‘Cardwell’ Cardwell Tea Tree 200mm 8 2x CORrub 1x AUSbb 1x PITrho PAVEMENT SCHEDULE
LINmon — Linospadix monostachya Walking Stick Palm 200mm 15 2x CORrub yy 2x MELthy OPTION 1 OPTION 2 OPTION a OPTION 4
SYZbb Syzygium ‘Beach Balt Beach Bali oon 21 3x EUGrei Ye 3x MELthy PAVING TYPE URBANSTONE CHELMSTONE HANDSTONE EUR
WESfru = Westringia fruticosa Coastal Rosemary mm 5 4x HYMfla ; oo
ses Yeoncrepiomnt amt en mova os comeciamt 008 mS el mes
trunk x re fo
Tussocks & Ground Covers 2x AUSbb 3x CORrub ; ;
ANigem Anigozanthus ‘Bush Gem’ Bush Glow Kangaroo Paw 200mm 16 * 1x SYZbb 4x BANaem coos 6 ASS wpa wit Mushroom “in Kakadu rondon win
CARgla Carpobrotus glauscens Pigs Face 140mm 21 4x CORrub 1x WESfru oncre’ v
PANjas Pandorea jasminoides Pink Bower of Beauty 140mm 4 2x A b 3x GREce / ; ; /
DiAbre Dianella brevipedunculata Flax Lily 140mm 36 Ne 2x ACRImp Pool Paving eee Mushroom win Kakadu rondon wih
GREcc __ Grevillea ‘Cooroora Cascade’ Cooroora Cascade 140mm 21
GREste Grevillea stemora prostrate Prostrate Grevillea 140mm 4 2x ALPam 1x GREcc ; / ;
iSOnod __Isolepsis nodosa Knobby Club Rush 140mm 21 1x MELthy : 1x WESfru Pool Coping Limestone Limestone Limestone Limestone
ifolia ‘Lit ’ Th H Myrttl 140mm 10 E ey
viOhed Viole noderaten vile Beatty Native. Violet ye 140mm 34 2x ACRimp v7 Sy Sr \\Y 1x EUCsur NOTE: The above paving options have been listed in order of price. Final pavement
3x DIAbre KR pp 2x SYZbb selection is to be approved by the architect and site advisor prior to ordering.
3x ViOhed 1x PiTrho
4x MELthy
FINISHES & PLANTING PLAN
Scale 1:100
600 & 400 sq concrete
pavers as specified and
detailed
80mm depth gravel as
detailed & specified
Turf as Specified
Bush boulders as scheduled
Hardwood sleepers as
detailed & specified
Timber Storage Room wall
1.2m high pool fence as
specified
1.8m high timber fence
Timber platform as detailed
Tree planting as scheduled
Shrubs & Groundcovers as
schedul
c a a
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J. Burrell
2nd Floor Esplanade ard Sacend Buliting Maroochydore
COPYRIGHT: No enprocuction of al or part of tls drawing may be unoertaken wiht
fhe express written permission of the author.
P.O, Box 18 Marooctydo'e 4558
[email protected]
ww. Fang oman
Tek: (07) 5443 4044
Fax: (07) $443 4534
SUNVIEW VILLAS
Client
Mr. J CAMERON & Mr. J McCormax
Architect
WILL FRANKLIN DESIGN
Drawing Tite:
LANDSCAPE FINISHES &
PLANTING PLAN & DETAILS
Job No.:
Drawing Sheet
LA1201
LAG2 02 OF 03
Page 7
S
Ly
2100 x 75 x 75 Hwd stakes. All
stakes to be chamfered, centrally
pointed & driven vertically into
the ground outside the rootball
2
g
i NS
%
Approved securing material such
as Rubber tree ties or 50mm
jutemat/hessian ties in figure 8
loops secured loosely to tree &
fixed to stake with flathead galv.
nails
Form shallow dish drain to base
of tree. Mound at pit edge
Excavate tree pit and backfill with
= 100mm friabie imported topsoil with
“20% organic content, light
= RRS " .
alg RR > compaction only.
2 =,
als SS ;
© 3 RE 7 1 (Max 2% organic content). Backfill
a|- BAe a Fe original subgrade material, light
oe , compaction only. Rootball to sit
a = on top of backfill
Slow release fertiliser to
Ensure pit manufacturers specifications
ota are Cultivate subgrade to 150 depth
Generally 2x width of rootball
TREE DETAIL nts
Lay turf (Sir Walter) as specified. To be laid
along contours with staggered and close
butted joints. To finish flush with existing
and hard surfaces. Moisten to depth of
Cut every second
mesh strand
Tool finish
20 MPa concrete. If exposed aggregate
T= Contraction selected, pressure wash to expose
Cd ey Joints at 6m aggregate. Colour & aggregate as
ERIN Gentes scheduled. A 1m2 finished sample must be
CONTRACTION JOINT nts provided to the site superintendent prior to
commencement for approval. The sample
may form part of the final product.
100x100 Extruded Amendments to the aggregate mix ratios,
Concrete Edge depth of aggregate exposure or CCS
saturation, may be made at this stage.
Planting Area
Quy sey yyy
10mm Jointex
or Equiv.
20mm Deep Sealant Compacted sub-base and sub-grade
Expansion Joints at to industry standards. Supply proof
n ZR = j % changes of coneret of compaction to site superintendant.
KKK changes of concrete Saw cut with , JOINTS
CONCRETE EDGE nts eee type and direction sealant or plastic Sawn Joints at + Joints as detailed
re inset 35mm deep m centres
EXPANSION JOINT nts POURED COLOURED CONCRETE - DETAIL SECTION
wi ”
Scheduled paver on 40mm compacted
bedding sand.
SAWN JOINT nts
Compact sub-grade
1x LEPcar 3x ALParu
1x PITrho 80mm depth gravel as specified
2x ¥Zbv—> oS : tx EUGrei
(Bx GREGG SN 2x GREcc nen
/ 3x CARgia x et 3x SYZbb / \) Garden bed as specified
CESS SPE 2 2x ViOhed VISES
2x GREcc PRK Ged
LW YY”
2x EUGrei RK URRY
4x ALParu . YS
1x EUCsur
4x DiAbre PAVER & GRAVEL - DETAIL SECTION
2x SYZbb
oN 1x CORrub
cK BW? 3x DIAbre
2x SYZbb 20 MPa concrete base
§-8mm non-shrink grout
topsoil immediately after installation p Ke: ; 1x EUGrei Sel
Imported topsoil to 50mm ¥ CARGHS 4 elected paver
depth. To be free from mounds ee a 1x DlAbre min 25mm / max 40mm mortar bed
and depressions. Apply 1x S¥Zbb—~ 1 i
+. : es x PiTrho Cement/water bonding slurry
fertiliser to manufacturers ~ 4x. GREeo— 2x AUSbb
instructions prior to turf Oo) Ee ALA Eas 2
installation “ax 1xEUGrei == =
poe 8 Compacted sub-base and sub-grade
3x SYZbb = ~ 3x DlAbre 2x AUSbb 1 ta industry standards. Supply proof
Tee of compaction to site superintendant.
4x GREce —.... - 4x ALParu
50 1x HYMfla JOINTS
7 + Concrete joints as detailed
1 ~ 1x DIAb
*LEPcar re POOL PAVING - DETAIL SECTION
gp <i 2x SYZbb
75 C AS \Y
ALParu x SS & Se Q) owes
2x DIAbre ” WR > 2x ISOnod ,-— 2x VIOhed
1x EUGrei ~ RY SK 7X)
TURF - SECTION "x Ause» Sh ROB, ay 1% ACRimp
ALS Ese cS ;
2x LINmon Cae i” yg 2x EUGrei
Ny TAS wi
12x ANigem C 4x CORrub LNs 2x DiAbre
. \ S
ax PANIas \ 2x ALParu Sx wioned 7 2x BANaem .
on stainless 2x ALPantk 3x LINmon Pre formed concrete haunch with set
steel strung 2x CORrub 2x ALP. (7 3x CORrub Y12 reo bar at approx. 800mm ctrs.
ire trellise tx AUSbb Ym Noha aru iN 200x75 Hardwood sleeper with max 20mm
ViOhed S & / illed holes for reinforcement b
PLANT SCHEDULE - . c» x , 1x EUGrei pre-drilled holes for reinforce ars.
TO 1x EUGrei 2xeUGrei S SSS Hole not to continue through top face.
5x ALParu 41x fia \ STA Dc
CODE SCIENTIFIC NAME COMMON NAME SIZE aty 1x EUG rei ? Day Compact sub-grade
2x EUGrei ~ a
Trees - - - 1x ALParu 2x AUSbb —\ wD CA J 80mm depth gravel as specified
ARCcun § Arcontonphoenix cunninghamia —_ Bangalow Palm ; En 2 +x LINmon 5x VIOhed § wf ay
3 2x ALParu 3x CORrub LP}
BANaem Banksia aemula Wallum Banksia 45L 4 2x rub 1x SYZbb \ O77 oh 94 Lo 2x ViOhed
COR 3x COR 5x LINmon SOC y
EUCsur Eucalyptus ‘Summer Red’ Summer Red Gum 45L 2 Sik x rub RIN Vj 2x DiAbre
HYMfla Hymenosporum flavum Native Frangipanni 45L 3 2x DlAbre N, 4x LINmon
PiTrho Pittosporum rhombifolium White Holly 46L 6 NN 5x VIOhed ZF 1x WESfru
1x ALParu 1x ALParu
SS
eys>
Shrubs ¥ 2x VIOhed
1x AUSbb -
ACRimp Acronychia imperforata Logan Apple 300mm 7 * | 2x ACRimp _SLEEPER & GRAVEL -DETAIL SECTION
ALParu = Alpinia arundetiiana Dwarf Ginger 200mm 32 1x EUGrei
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 23
CORmb _ Cordyline rubra ‘Rea’ Red Patm Lily 200mm 27 3x DIAbre 3x DlAbre
EUGrei Eugenia reinwardtiana Beach Cherry 200mm 20 come
LEPcar Leptospermum ‘Cardwell Cardwell Tea Tree 200mm 8 1x AUSbb iS 1x PlTrho PAVEMENT SCHEDULE
LINmon — Linospadix monostachya Walking Stick Palm 200mm = 15 2x CORrub SF Yo 2x MELthy OFPTION( = QFTION2 OPTIONS — OPTION 4
SYZbb Syzygium ‘Beach Bait’ Beach Ball 200mm 21 3x EUGrei bd & 9x MELih PAVING TYPE URBANSTONE CHELMSTONE HANDSTONE EURO
WESfru Westringia fruticosa Coastal Rosemary 200mm 5 4x HYMfla Uf y
XANjoh = Xanthorrhoea johnsonii Grass Tree mix of <300 4 Wa 2x ARCcun Poured Coloured CCS Alpine CCS Alpine with 30%grey, 30%black &
trunk 2x SYZbb 7x DiAbre Concrete 30%cream/white exposed aggregate
Tussocks & Ground Covers 2x AUSbb 3x CORrub
ANIigem Anigozanthus ‘Bush Gem' Bush Glow Kangaroo Paw 200mm 16 +x SYZbb 1x BANaem 600sq & 400sq_ = Topaz with Mushroom with Kakadu London with
CARgla Carpobrotus glauscens Pigs Face 140mm 21 4x CORrub 4x WESfru Concrete Pavers Milled finish Satinstone finish Classic finish
PANjas Pandorea jasminoides Pink Bower of Beauty 140mm 4 2x AUSbb 3x GREcc K
DitAbre Dianella brevipedunculata Flax Lily 140mm 36 : Poo! Paving Topaz with Mushroom with akadu London with
GREce _ Grevillea ‘Cooroora Cascade’ Cooroora Cascade 140mm 21 1x EUGrei 2x ACRimp Milled finish Limestone finish Classic finish
GREste Grevillea stemora prostrate Prostrate Grevillea 140mm 4 2x ALParu 1x GREcc
ISOnod _— fsolepsis nodosa Knobby Club Rush 140mm 21 1x MELthy 4x WESiru Pool Coping Limestone Limestone Limestone Limestone
MELthy Melaleuca thymifolia ‘Little Beauty’ Thyme Honey Myrtle 140mm 10 .
ViOhed Viola hederacea Native Violet 140mm 34 2x ACRimp 1x EUCsur NOTE: The above paving options have been listed in order of price. Final pavement
3x DIAbre 2x SYZbb selection is to be approved by the architect and site advisor prior to ordering.
3x ViOhed 1x PiTrho
4x MELthy
FINISHES & PLANTING PLAN Scale 1:100
oa
™m
OD
m
=
O
\
600 & 400 sq concrete
pavers as specified and
detailed
7
a
80mm depth gravel as
detailed & specified
Turf as Specified
Bush boulders as scheduled
Hardwood sleepers as
detailed & specified
Timber Storage Room wall
1.2m high pool fence as
specified
1.8m high timber fence
INS
Timber platform as detailed
Tree planting as scheduled
Shrubs & Groundcovers as
scheduled
AMENDMENTS
c a ad
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J. Burret
2nd Floor Esplanade and Second Buikding, Maroocnyiora
P.O, Box 16 Maroochydore 4658
[email protected]
Janda: comau
‘Tel: (07} 5443 4044
Fax: (07) 5443 4535
COPYRIGHT: No reprocucion of a or part of this arawing may be unoertaken About
‘he express attlen permission of the author,
SUNVIEW VILLAS
Chent
Mr. J CAMERON & Mr. J McCormax
Archéect
WILL FRANKLIN DESIGN
Drawing Tite
LANDSCAPE FINISHES &
PLANTING PLAN & DETAILS
Job No.: Drawing.
LA1201 LAO2 02 OF 03
Page 8
2100 x 75 x 75 Hwd stakes. All
stakes to be chamfered, centrally
pointed & driven vertically into
the ground outside the rootball
Approved securing material such
as Rubber tree ties or 50mm
jutemat/hessian ties in figure 8
loops secured loosely to tree &
fixed to stake with flathead galv.
nails
Form shallow dish drain to base
of tree. Mound at pit edge
Excavate tree pit and backfill with
100mm friable imported topsoil with
¢, 0% organic content, light
a a RX companion only.
23 &
sj. #& (Max 2% organic content). Backfill
Sje 7Y original subgrade material, light
2 3 , compaction onty. Rootball to sit
a on top of backfill
Slow release fertiliser to
Ensure pit manufacturers specifications
edges are .
porous Cultivate subgrade to 150 depth
‘Generally 2x width of rootball
TREE DETAIL nts
Lay turf (Sir Walter) as specified. To be laid
along contours with staggered and close
butted joints. To finish flush with existing
and hard surfaces. Moisten to depth of
topsoil immediately after installation
Imported topsoil to 50mm
depth. To be free from mounds
and depressions. Apply
fertiliser to manufacturers
instructions prior to turf
installation
ed ut
4x GREcc
meres aa
3x SYZbb
HI] a
Cut every second
mesh strand
fod
CONTRACT
Planting Area
100x100 Extruded
Concrete Edge
10mm Jointex
or Equiv.
20mm Deep Sealant
= Expansion Joints at
“t, 12m centres and at
el .
SARK changes of concrete
type and direction
EXPANSION JOINT nts
CONCRETE EDGE nts
1x LEPcar 3x ALParu
1x PlTrho
2x Yebb = : 1x EUGrei
‘2x GREcc wis 2x GREcc
2x CARgla--x 3x SYZbb
x BANaem a
1x:SYZbb—-<
1x-GREec x
3x DiAbre
4x ALParu
2x ViOhed
2x GREcc
2x EUGrei
inset
Tool finish
ST Contraction
vp tts. Joints at 6m
KRESS Centres
ION JOINT nts
Saw cut with ;
sealant or plastic Sawn Joints at
35mm deep 3m centres
SAWN JOINT
nts
4x ALParu
1x EUCsur
4x DlAbre
2x SYZbb
1x CORrub
3x DiAbre
2x SYZbb
1x EUGrei
1x DlAbre
1x PlTtho
2x AUSbb
1x EUGrei
2x AUSbb
20 MPa concrete. If exposed aggregate
selected, pressure wash to expose
aggregate. Colour & aggregate as
scheduled. A 1m2 finished sample must be
provided to the site superintendent prior to
commencement for approval. The sample
may form part of the final product.
Amendments to the aggregate mix ratios,
depth of aggregate exposure or CCS
saturation, may be made at this stage.
Compacted sub-base and sub-grade
to industry standards. Supply proof
of compaction to site superintendant.
LAY
JOINTS Mir,
+ Joints as detailed
POURED COLOURED CONCRETE - DETAIL SECTION
Scheduled paver on 40mm compacted
bedding sand.
Compact sub-grade
80mm depth gravel as specified
YY KI
Garden bed as specified
PAVER & GRAVEL - DETAIL SECTION
20 MPa concrete base
5-8mm non-shrink grout
Selected paver
min 25mm / max 40mm mortar bed
Cement/water bonding siurry
15 Compacted sub-base and sub-grade
j to industry standards. Supply proof
of compaction to site superintendant.
1x HYMfla JOINTS
+ Concrete joints as detailed
R
ke
600 & 400 sq concrete
Pavers as specified and
detailed
80mm depth gravel as
detailed & specified
Turf as Specified
Bush boulders as scheduled
Hardwood sleepers as
detailed & specified
Timber Storage Room wall
1.2m high pool fence as
Specified
1.8m high timber fence
Timber platform as detailed
Tree planting as scheduled
Shrubs & Groundcovers as
scheduled
ECEIVED
6 JUL 2007
os suixe COUNCL
FRONT COUNTER
1x DiAbre
1x LEPcar POOL PAVING - DETAIL SECTION
2x SYZbb
* (ff 2x WESfru
2x ISOnod 2x ViOhed
TURF - SECTION 1x ACRimp
2x LINmon 2x EUGrei
12x ANIgem \ © 4x CORrub 2x DiAbre
i \
4x PANias \ 2x ALParu Sx WOhed 2x BANaem .
on stainiess } 2x ALPanb 3x LINmon Pre formed concrete haunch with set
steel strung 2x CORrub 2x ALParu 3x CORrub Y12 reo bar at approx. 800mm ctrs.
Xm AUSbb H { SY 200x75 Hardwood sleeper with max 20mm
x ViOhed 8 : re-drilled holes for reinforcement bars.
PLANT SCHEDULE - . 1x E pi
2xEUGrei . | ‘ x EUGreI Hole not to continue through top face.
1x ja S dns
CODE SCIENTIFIC NAME COMMON NAME SIZE QTy 1x EUGréi \ a. LY Compact sub-grade
2x EUGrei \ < iY ;
Trees 1x ALParu 2x AUSbb BD 4 ; Wo 80mm depth gravel as specified
ARCcun Arcontonphoenix cunninghamia —_ Bangalow Palm 100L 2 1x LINmon 5x ViOhed NN Be J
. 45L 3 2x ALParu 3x CORrub \ “ov
BANaem Banksia aemula ; Wallum Banksia 45L 4 2x CORrub 3x CORD 5x LINmon \ SCS p 2x VIOhed c i 4
EUCsur Eucalyptus ‘Summer Red Summer Red Gum 46L 2 VAS A, 2x DiAbre
HYMfla — Hymenosporum flavum Native Frangipanni 45L 3 2x DiAbre 4x LINmon ae OY LANDGRAPHICS
PiTrho__Pittosporum rhombifolium White Holly 45L 6 tx ALPanu 5x VIOhed x ey NN NG 1x WESfru
parted BAN
Shrubs 7 tx AUSbb mR YOY 2x lOhed SLEEPER & GRAVEL - DETAIL SECTION LANDSCAPE ancHITECTS
ACRimp Acronychia imperforata Logan Apple 300mm 7 ; \ 7 2x ACRimp Prneipal: Robert J. Bure
ALParu = Alpinia arundelliana Dwarf Ginger 200mm 32 1x EUGrei x fr Foo Cope rl Second Biking: Marcocysoce
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 23 3x DI serdaiapricatr text com at
CORnub _ Cordyline rubra ‘Rea Red Palm Lit 200mm —_-27 eel. 3x DiAbre Teas
LEPcar Leptospermum 'Cardweif' Cardwell Tea Tree 200mm 8 1x AUSbb YS LSA 1x PlTrho PAVEMENT SCHEDULE Express enter penmission ot he
LiNmon —_Linospadix monostachya Walking Stick Palm 200mm 15 2x CORrub C > 2x MELthy OPTION 1 OPTION 2 OPTION 3 OPTION 4
SYZbb Syzygium ‘Beach Ball’ Beach Ball 200mm 21 3x EUGrei Ye 3x MELthy PAVING TYPE URBANSTONE CHELMSTONE HANDSTONE EURO SUNVIEW VILLAS
WEStru tringia fruticosa Coastal Rosem 200mm 5
XANjoh Xanthones johnsonii Grass Tree. ay mix of <300 4 1x HYMfia 2x ARCcun Poured Coloured CCS Alpine CCS Alpine with 30%grey, 30%black &
trunk 2x SYZbb 7x DIAbre Concrete 30%cream/white exposed aggregate Client
Tussocks & Ground Covers 2x AUSbb 3x CORrub ; Mr. J CAMERON & Mr. J McCormax
ANigem Anigozanthus ‘Bush Gem' Bush Glow Kangaroo Paw 200mm 16 1x SYZbb 1x BANaem 600sq & 400sq Topaz with Mushroom with Kakadu London with
CARgla Carpobrotus glauscens Pigs Face 140mm 21 4x CORrub 1x WEStru Concrete Pavers Milled finish Satinstone finish Classic finish Architect
PANjas Pandorea jasminoides Pink Bower of Beauty 140mm 4 2x AUSbb 3x GREcc Pool Pavi t ah Mush ah Kakad Lond ah WILL FRANKLIN DESIGN
DiAbre Dianella brevipedunculata Flax Lily 140mm 36 . : ‘oo! Paving opaz w ushroom will akadu ondon wi
GREcc _ Grevillea ‘Cooroora Cascade’ Cooroora Cascade 140mm 21 1x EUGrei 2x ACRimp Milled finish Limestone finish Classic finish Drawing Tee
GREste Grevillea stemora prostrate Prostrate Grevillea 140mm 4 2x ALParu 1x GREcc ; / LANDSCAPE FINISHES &
ISOnod = /solepsis nodosa Knobby Club Rush 140mm 21 1x MELthy 4x WESfru Poot Coping Limestone Limestone Limestone Limestone PLANTING PLAN & DETAILS
MELth Melaleuca thymifolia ‘Little B " Thyme Honey Myrtfe 140mm 10
viOhed Viola hederacea ONS CNY Native Viola * 140mm 34 2x ACRimp 1x EUCsur NOTE: The above paving options have been listed in order of price. Final pavement
3x DlAbre 2x SYZbb selection is to be approved by the architect and site advisor prior to ordering.
3x VIOhed 1x PITrho
4x MELthy
Joe No.;
FINISHES & PLANTING PLAN Scale 1:100
LA1201
Page 9
2100 x 75 x 75 Hwd stakes. All
stakes to be chamfered, centrally
pointed & driven vertically into
the ground outside the rootball
Approved securing material such
as Rubber tree ties or 50mm
jutemavhessian ties in figure 8
loops secured loosely to tree &
fixed to stake with flathead gaiv.
nails
Form shallow dish drain to base
of tree. Mound at pit edge
compaction only. Rootball to sit
on top of backfill
aD Excavate tree pit and backfill with
OH 099<~.100mm friable imported topsoil with
< ~~” 20% organic content, light
alg RR compaction only.
28 2
38 SS .
Oh AY (Max 2% organic content). Backfill
gle “ original subgrade material, tight
<|3
Qa
Siow release fertiliser to
Ensure pit manufacturers specifications
edges are
porous Cultivate subgrade to 150 depth
TREE DETAIL nts
Lay turf (Sir Walter) as specified. To be laid
along contours with staggered and close
butted joints. To finish flush with existing
and hard surfaces. Moisten to depth of
Cut every second
mesh strand
Too! finish
Eee
K
ENA
Planting Area
100x100 Extruded
Concrete Edge
Oe ey sis
10mm Jointex
or Equiv.
20mm Deep Sealant
STIs Expansion Joints at
» 7.77," 12m centres and at
KECK changes of concrete
type and direction
EXPANSION JOINT nts
Turf
CONCRETE EDGE nts
te rt
RE
Saw cut with
sealant or plastic
inset 35mm deep
1x LEPcar 3x ALParu
1x PiTrho
2x NZD == ce 1x EUGrei
2x: GREcc 6 ~ AI 2x GREcc
~ J PR GRE GG oe Pet\>
; 2x CARgla—~ Ke S_OK 3x SYZbb
Bs KT ) 2x ViOhed
Jz
2x GREcc
B. ¥ . oo
x ANeorn 2x EUGrei
4x ALParu
1x EUCsur
4x DlAbre
2x SYZbb
4x CORrub
3x DlAbre
TTT ~=6Contraction
ita sl+ Joints at 6m
centres
ULRRREELRER
CONTRACTION JOINT _nts
2x SYZbb
20 MPa concrete. If exposed aggregate
selected, pressure wash to expose
aggregate. Colour & aggregate as
scheduled. A 1m2 finished sample must be
provided to the site superintendent prior to
commencement for approval. The sample
may form part of the final product.
Amendments to the aggregate mix ratios,
depth of aggregate exposure or CCS
saturation, may be made at this stage.
nts
Compacted sub-base and sub-grade
__— to industry standards. Supply proof
of compaction to site superintendant.
JOINTS
+ Joints as detailed
POURED COLOURED CONCRETE - DETAIL SECTION
Sawn Joints at
3m centres
Scheduled paver on 40mm compacted
bedding sand.
Compact sub-grade
80mm depth gravel as specified
45 Ae : x fy Garden bed as specified
RERDKKA KAKA IRR
SO RRR
YY IY Ys
PAVER & GRAVEL - DETAIL SECTION
20 MPa concrete base
§-8mm non-shrink grout
topsoil immediately after installation fp 1x EUGrei
Imported topsoil to 50mm ke CARGH Selected paver
depth. To be free from mounds A | v3 fogd 1x DIAbre min 25mm / max 40mm mortar bed
and depressions. Apply (IX SYZDb Be. 1x PITrho Cement/water bonding slurry
fertiliser to manufacturers 1x. GREes QS 2x AUSbb
instructions prior to turf Carrer oor NENG
installation _ AX LEP Gate = 1x EUGrei
dad vo 5 : : Compacted sub-base and sub-grade
3x SYZbb Ar i 3x DlAbre 2x AUSbb 1 ys a ies) to industry standards. Supply proof
: my ‘e QRRAR LARRABEE" of co tion to sit intendant.
4x GREce =<. 4x ALParu 4 RX KD[MK KVi15 NS WSK mpaction to site superintendan
50} - 7X 1x HYMfla JOINTS
7 d brs + Concrete joints as detailed
1x LEP GER 27 & 1x DlAbre
“ WB * Sey POOL PAVING - DETAIL SECTION
. cK eK RY 2x SYZbb
, ras % 2 v
3x CORrub sae SRK 2x WESfru
; cS ALParu xe: QOS Q)
2x DiAbre ; KG Ox 2x ISOnod_,— 2x ViOhed
< > x rei R aA cd
TURF - SECTION 1x AUSbb SS, JOAN ae 4x ACRimp
> ,
2x LINmon Shae i 2x EUGrei
Os
12x ANIgem 4x CORrub , 2x DIAbre
4x PAN 6x ViOhed
t F lose \ 2x ALParu 2x BANaem .
on stainless 2 2x ALParnk 3x LiNmon Pre formed concrete haunch with set
Y12 reo bar at approx. 800mm ctrs.
2x: COftrub 2x ALParu —{} 3x CORrub PP 4
ViOhed Ry 200x75 Hardwood sleeper with max 20mm
PLANT SCHEDULE - . x ec N 1x EUGrei pre-drilled holes for reinforcement bars.
tx EUG rel 2x€UGrei * > * Hole not to continue through top face.
5x ALParu 1x ja \ H, Xn
CODE SCIENTIFIC NAME COMMON NAME SIZE QTY 1x EUGréi T é ‘ » Compact sub-grade
2x EUGrei as ‘
Trees 1x ALParu 2x AUSbb —~ TS y Ce , YJ 80mm depth gravel as specified
ARCcun = Arcontonphoenix cunninghamia Bangalow Palm 100L 2 5x ViOhed RY Rx q J
45L 3 xhinmon e/ Sy
x aru 3x CORrub .
BANaem Banksia aemula Wallum Banksia 45L 4 2x CORrub 1x SYZbb ix Linmon \ \ 44 P , 2x VIOhed
EUCsur Eucalyptus ‘Summer Rea’ Summer Red Gum 45L 2 3x CORrub Ox Sa 2x DIA
HYMfla Hymenosporum flavum Native Frangipanni 45L 3 2x DlAbre 4x LiNmon pve thats 8 . Kw x re
PlTrho Pittosporum rhombifolium White Holly 45L 6 5x VIOhed ’ 5 1x WESfru
1x ALParu
1x ALParu
Shrubs 2x ViOhed
4x AUSbb -
ACRimp Acronychia imperforata Logan Appie 300mm 7 x ; 2x ACRim SLEEPER & GRAVEL DETAIL SECTION
ALParu = Alpinia arundeliiana Dwarf Ginger 200mm 32 1x EUGrei P
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 23
CORrub__ Cordyline rubra ‘Red’ Red Palm Lit 200mm 27 oo 3x DlAbre
EUGrei Eugenia reinwardtiana Beach Cherry 200mm 20 xe ORrub
LEPcar Leptospermum 'Cardwelf Cardwell Tea Tree 200mm 8 1x AUSbb 4x PlTrho PAVEMENT SCHEDULE
LiNmon —_Linospadix monostachya Walking Stick Paim 200mm 15 2x CORrub 2x MELth OPTION 1 OPTION 2 OPTION 3 OPTION 4
SYZbb Syzygium ‘Beach Balt’ Beach Ball 200mm 21 3x EUGrei hi 3x MELthy ¥ PAVING TYPE URBANSTONE CHELMSTONE HANDSTONE EURO
WESfru Westringia fruticosa Coastal Rosemary 200mm 5 1x HYMfla Vs
XANjoh = Xanthorthoea johnsonii Grass Tree mix of <300 4 2x ARCcun Poured Coloured CCS Alpine CCS Alpine with 30%grey, 30%black &
trunk 2x SYZbb 7x DlAbre Concrete 30%cream/white exposed aggregate
Tussocks & Ground Covers 2x AUSbb 3x CORrub
ANIgem Anigozanthus ‘Bush Gem' Bush Glow Kangaroo Paw 200mm 16 4x SYZbb 1x BANaem 600sq & 400sq Topaz with Mushroom with Kakadu London with
CARgla Carpobrotus glauscens Pigs Face 140mm 21 1x CORrub 4x WESfru Concrete Pavers Milled finish Satinstone finish Classic finish
PANjas = Pandorea jasminoides Pink Bower of Beauty 140mm 4 2x AUSbb 3x GREcc
DlAbre Dianella brevipedunculata Flax Lily 140mm 36 ” ‘ ’ Pool Paving Topaz with Mushroom with Kakadu London with
GREcc —_Grevillea 'Cooroora Cascade’ Cooroora Cascade 140mm 21 1x EUGrei baer 2x ACRimp Milled finish Limestone finish Classic finish
GREste Grevillea stemora prostrate Prostrate Grevillea 140mm 4 2x ALParu 5 1x GREcc
ISOnod = /solepsis nodosa Knobby Club Rush 140mm 21 1x MELthy RASZ 1x WESfru Pool Coping Limestone Limestone Limestone Limestone
MELthy Melaleuca thymifolia ‘Little Beauty’ Thyme Honey Myrtle 140mm 10 , . oF
viOhed Viola hederacea Native Violet 140mm 34 2x ACRimp : X : \S 1x EUCsur NOTE: The above paving options have been listed in order of price. Finat pavement
3x DlAbre yy OP Ne Op selection is to be approved by the architect and site advisor prior to ordering.
XS Px 2x SYZbb
3x VIOhed 1x PITrho
4x MELthy
FINISHES & PLANTING PLAN
Scale 1:100
LEGEND -
600 & 400 sq concrete
pavers as specified and
detailed
80mm depth gravel as
detailed & specified
Turf as Specified
Bush boulders as scheduled
Hardwood sleepers as
detailed & specified
| | Timber Storage Room wall
| 1.8m high timber fence
1.2m high pool fence as
specified
Shrubs & Groundcovers as
scheduled
somven (x
\
6 8 2907
cence LY
ee
c a a
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Rober J. Bure
2nd Finor Esptanada and Second Bulking, Ma-oocnyiore
P.O. Box 18 Marooctrydoe 4558
landgrapnics@ fexinet com au
COPYRIGHT: No repracuction of afl or part of ints crawing may be undertaken without
the express wairien ot te author
SUNVIEW VILLAS
Cliert
Mr. J CAMERON & Mr. J McCormax
Architect
WILL FRANKLIN DESIGN
Drawing Tide
LANDSCAPE FINISHES &
PLANTING PLAN & DETAILS
Job No. Drawing: Sheet
LA1201 LA02 02 OF 03
Page 10
2x AUSbb
4x DlAcae
14x MACluc
1x DORexc
2 medium & 1
small bush rock
as scheduled
2x AUSbb
3x ViOhed
4th FLOOR PLANTING PLAN
Scale 1:100
PLANT SCHEDULE -
CODE SCIENTIFIC NAME COMMON NAME SIZE Qry
Shrubs
ALParuy = Alpinia arundeliiana Dwarf Ginger 200mm 7
AUSbb — Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 4
CORrub_ Cordiyline rubra ‘Red’ Red Palm Lily 200mm 4
DORexc Doryanthus excelsa Gymea Lily 300mm 2
LINmon _ Linospadix monostachya Walking Stick Palm 300mm 17
MACluc Macrozamia lucida Pineapple Zamia 300mm 2
XANjoh Xanthorrhoea johnsonii Grass Tree <300 trunk 1
Tussocks & Ground Covers
ANigem Anigozanthus 'Bush Gem’ Bush Glow Kangaroo Paw 140mm 6
PANias Pandorea jasminoides Pink Bower of Beauty 140mm 3
DiAbre _—— Dianella brevipedunculata Flax Lity 140mm 4
{SOnod _Isolepsis nodosa Knobby Club Rush 140mm 2
VlOhed ‘Viola hederacea Native Violet 140mm 47
1x MAClud in
timber pot as
detailed
4 medium & 2
smail bush rock
as scheduled
6x ANIgem
1x PAnjas
2x CORrub
1 xPAnjas
2 medium & 3
small bush rock
as scheduled
Scale 1:100
3rd FLOOR PLANTING PLAN
SPECIFICATION
EXTENT OF WORKS
Contractor should take full account of documentation of Civil Engineering, Hydraulic and Electrical Engineering Works. Landscape works are
to include the following:
EXCAVATION AND DRAINAGE
Break up and remove any excess concrete slurry from construction works to achieve required planting depths. Excavate site soil to a depth af
100mm. Break up remaining subgrade to a depth of 100mm. Drainage is to be incorporated to al planting areas that are enclosed by hard
edging and not otherwise drained. Contractor should allow for averland gravel drains through mulched areas to stormwater catchment pits.
IRRIGATION
Irrigation for the project shall be carried out by an experienced and reputable inigation contractor - Tenderers intending to handle the imigation
themselves will be required to demonstrate proficiency in this area. Submit an irrigation plan fo the site supervisor for approval prior to
installation. A fully automated and programmable irrigation system, with rainswitch, is to be provided to all Garden areas. All fitings are to be
fully effective and inconspicuausly placed with lines placed through conduits under hard surfaces. Water connection points wil be the water
tanks at the rear of each jot. The system should provide requlated application to all areas with no overspray or runoff onto hard surfaces.
Irrigation systems are to be guaranteed for a period of 12 months against faulty materials and workmanship.
TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to be progressively filled with premium grade blended organic garden soil mix to a minimum of 400mm depth. Soil to be an
appraved garden organic mix. Soil supptier as well as intended mix is to be nominated. Soil is fa be mounded to facilitate good drainage to
hardstand areas (max 1:3 grade) and is to finish 50mm below edging after settlement. ‘Organic auditive such as ‘Dynamic Lifter’ is to be
incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote’ or equivalent is also to be incorporated
with individual plantings in accordance with the manufacturers recommendations.
EDGING
Provide an extruded concrete edge to ail garden beds where adjacent to grass areas. Line of edging to be set out and approved on site prior
to construction.
SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and to show planting to best advantage.
Contractor is to seek confirmation of finished levels prior to final plantings and application of mulch.
CONTAINERISED PLANT MATERIAL
Plant material is to be approved by superintendent prior to planting. Planting is to be cartied out in a manner consistent with good horticultural
practice. All 300 pot and larger plant material is to be guyed and staked as per Detail - Advanced Container Planting. Smaller plant stock is to
be staked as necessary. Stakes shall not pass through the rootball of plant at time of planting or any fime thereafter.
Stock may be rejected if plants are:-
a) Undersized proportional to specified container size or is the root system if underdeveloped
b) Oversized proportional to specified container size or severely root bound.
c} Unbalanced or uncharacteristic of normal or specified growth pattem for the species.
d) Not suitably acclimatised for the specific environment
e) Diseased, infested with pests or suffering from other form of significant stress.
GARDEN MULCH
Mulch shail be one inch hoop pine mulch to predominant depth of 100mm. Mulch is to be graded to avoid placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.
TURF
a) "SIR WALTER’ minimum sod depth 25mm
b) Turf to be laid within 24 hours of being cut
¢) Allow for ground preparation and deposition of 50mm imported garden ioam topsoil
d) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface
CONCRETE & PAVING - SUPPLY AND INSTALLATION
To all areas as shown on drawings, supply and install exposed aggregate coloured concrete and pavers. Concrete colour, aggregate
selection paver selection and installation details as nominated on the plan Paving Schedule. Installation to follow industry best practices
including ground preparation, campaction, minimal slump allowances and minimum joint distances.
GRAVEL - SUPPLY AND INSTALLATION
Supply and install minimum 80mm depth approved 16mm-20mm Cream River Gravel fo a compacted sub base to all areas shown on the
plan.
MAINTENANCE
a) Obtain signoff of all landscape construction works prior to commencement of the maintenance period. The maintenance period will not be
deemed to have commenced without signoff.
b) Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture levels are critical during early
establishment
c) Mow turf every 1-2 weeks or as required to ensure turf does not exceed 80mm height. .
d) Prune and shape all shrubs and trees as required. Replace at the contractors cost all plants which display a lass of condition or are stolen
& vandalised.
e) Monitor irrigation performance and take remedial action where required.
f) Fertitise all garden beds at completion of maintenance period (12 weeks).
g) Contractor shall maintain an up ta date written log book to record inspection observations and actions
h) Contractor must obtain signoff of all landscape works at the completion of the 12 week maintenance period. To obtain signoff ali plants
must display health and establishment, mulch must be at the specified depths, irrigation must be in complete working order, timber elements
must be re-stained within 2 weeks of maintenance completion, electrical elements must be in complete working order, concrete is to be dean
and free of cracks and depressions, turf is to display a healthy dense even sward to 95% cover and generally the landscape must display
compliance with industry standards. If at the final inspection, the landscape does not obtain signoff, the landscape contractor must continue to
maintain until the landscape is compliant with the above standards.
Planter box shown without lining
for information purposes. Both
boxes require tining
Stainless steel angle
brackets with ss. coach head
bolts connecting battens
TIMBER POTS - DETAIL SECTION
BUSH ROCK SCHEDULE
Small 200-300mm in any direction
Medium 500-600 in any direction
Large 700-800 in any direction
* Bush rock to be smooth/round faced and
free from chips and scraps.
* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..
Impermeable rigid
membrane lining
timber boxes
Stainless steel angle
brackets with ss. coach
head bolts connecting
battens
100x35 Hardwood
timber battens
TIMBER POTS - DETAIL PLAN Scale 1:20
100mm mulch as specified
and imported podium
topsoil mix in planter boxes
WALL OF UNIT
Impermeable rigid membrane
lining timber boxes
100x35 Hardwood
timber battens
100mm mulch as
specified & imported
podium topsoil mix
Concrete blocks
supporting planter boxes
at their required height
Drainage medium
(by others)
EDGE OF PODIUM GARDEN BED
Scale 1:20
LEGEND -
FS 80mm depth gravel as
detailed & specified
Bush boulders as scheduled
Tree planting as scheduled
Shrubs & Groundcovers as
scheduled
AMENOMENTS
cate deserplon drawn
2706.07 ORIGINAL ISSUE aS
c a a
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J. Burret
2nd Floor Esplanada and Second Buikding. Maroocryeore
P.O, Box 18 Maroochydore 4558
[email protected] au
www Jandgraphics.com.au
Tet: (07) 5443 4044
Fax: (07) 5443 4534
GOPYRIGHT: No reproduction af all or part of this drawing may be undertaken wafhout
The express written permission of he auf,
SUNVIEW VILLAS
Chert
Mr. J CAMERON & Mr. J McCormax
Architect
WILL FRANKLIN DESIGN
Drawing Tite
LANDSCAPE PLANTING PLAN,
DETAILS & SPECIFICATION
Peon fe
eae |
cc
Jab No, Drawng: Sheet: tesue.
LA1201 LAQ3 3 OF 03 A
Page 11
2x AUSbb
4x DIAcae
4x MACluc
1x DORexc
2 medium & 1
small bush rock
as scheduled
2x AUSbb
3x VIOhed
4th FLOOR PLANTING PLAN
Scale 1:100
PLANT SCHEDULE -
CODE SCIENTIFIC NAME COMMON NAME SIZE Qty
Shrubs
ALParu = Alpinia arundelliana Dwarf Ginger 200mm 7
AUSbb — Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 4
CORmb Cordyline rubra ‘Red Red Palm Lily 200mm 4
DORexc Doryanthus excelsa Gymea Lily 300mm 2
LINmon __Linospadix monostachya Walking Stick Palm 300mm 17
MACluc Macrozamia lucida Pineapple Zamia 300mm 2
XANjoh = Xanthorrhoea johnsonii Grass Tree <300 trunk 1
Tussocks & Ground Covers
ANigem Anigozanthus ‘Bush Gem’ Bush Glow Kangaroo Paw 140mm 6
PANjas = Pandorea jasminoides Pink Bower of Beauty 140mm 3
DiAbre _—— Dianella brevipedunculata Flax Lily 140mm 4
{SOnod /solepsis nodosa Knobby Club Rush 140mm 2
ViOhed Viola hederacea Native Violet 140mm 47
1x MAClud in
timber pot as
detailed
1 medium & 2
small bush rock
as scheduled
6x ANigem
1x PAnjas
2x CORrub
1 °
Anjas
2 medium &3
small bush rock
as scheduled
3rd FLOOR PLANTING PLAN Scale 1:100
SPECIFICATION
EXTENT OF WORKS
Contractor should take full account of documentation of Civil Engineering, Hydraulic and. Electrical Engineering Works. Landscape works are
to include the following:
EXCAVATION AND DRAINAGE
Break up and remave any excess concrete slurry from construction works to achieve required planting depths. Excavate site soft to a depth of
100mm. Break up remaining subgrade to a depth of 100mm. Drainage is to be incorporated to all planting areas that are enclosed by hard
edging and not otherwise drained. Contractor should allow for overland gravel drains through mulched areas to stormwater catchment pits.
IRRIGATION
Irrigation for the project shall be carried out by an experienced and reputable irrigation contractor - Tenderers intending to handle the irrigation
themselves will be required to demonstrate proficiency in this area. Submit an irrigation plan to the site supervisor for approval prior to
installation. A fully automated and programmable irrigation system, with rainswitch, is to be provided to all Garden areas. All fittings are to be
fully effective and inconspicuously placed with lines placed through conduits under hard surfaces. Water connection points will be the water
tanks at the rear of each lot. The system should provide requiated application to all areas with no overspray or runoff onto hard surfaces.
Irrigation systems are to be guaranteed for a period of 12 months against faulty materials and workmanship.
TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to. be progressively filled with premium grade blended organic garden soa mix to. a minimum of 400mm depth. Soi to be an
approved garden organic mix. Soil supplier as well as intended mix is to be nominated. Soil is to be mounded to facittate good drainage to
hardstand areas (max 1:3 grade) and is to finish 50mm below edging after settlement. Organic additive such as ‘Dynamic Lifter’ is to be
incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote' or equivalent is also to be incorporated
with individual plantings in accordance with the manufacturers recommendations,
EDGING
Provide an extruded concrete edge to all garden beds where adjacent to grass areas. Line of edging to be set out and approved on site prior
to construction.
SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and ta show planting to best advantage.
Contractor is to seek confirmation of finished levels prior to final plantings and application of mulch.
CONTAINERISED PLANT MATERIAL
Plant material is to be appraved by superintendent prior to planting. Planting is to be carried out in a manner consistent with good horticultural
practice. All 300 pot and larger plant material is to be guyed and staked as per Detail - Advanced Container Planting. Smaller plant stock is to
be staked as necessary. Stakes shall not pass through the rootball of plant at time af planting or any time thereafier.
Stock may be rejected if plants are:-
a) Undersized proportional to specified container size or is the root system if underdeveloped
b) Oversized proportional to specified container size of severely root bound.
c) Unbalanced or uncharacteristic of normal or specified growth pattern for the species.
d) Not suitably acclimatised for the specific environment
e) Diseased, infested with pests or suffering from other form of significant stress.
GARDEN MULCH
Mulch shail be one inch hoop pine mulch to predominant depth of 100mm. Mulch is ta be graded to avoid placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.
TURF
a) "SIR WALTER" minimum sod depth 25mm
b) Turf to be laid within 24 hours of being cut
c) Allow for ground preparation and deposition of 50mm imported garden loam topsoil
d) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface
CONCRETE & PAVING - SUPPLY AND INSTALLATION
To all areas as shown on drawings, supply and install exposed aggregate coloured concrete and pavers. Concrete colour, aggregate
selection paver selection and installation details as nominated on the plan Paving Schedule. Installation to follow industry best practices
including ground preparation, compaction, minimal slump allowances and minimum joint distances.
GRAVEL - SUPPLY AND INSTALLATION
Supply and instatl minimum 80mm depth approved 46mm-20mm Cream River Gravel to a compacted sub base to all areas shown on the
plan.
MAINTENANCE
a) Obtain signoff of all landscape construction works prior to commencement of the maintenance period. The maintenance period will not be
deemed to have cammenced without signoff.
b) Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture levels are critical during early
establishment
c) Mow turf every 1-2 weeks or as required to ensure turf does not exceed 80mm height.
d) Prune and shape all shrubs and trees as required. Replace at the contractors cost all plants which display a loss of condition or are stolen
& vandalised.
) Monitor irrigation performance and take remedial action where required.
f) Fertilise al garden beds at completion of maintenance period (12 weeks).
g) Contractor shall maintain an up to date written log book to record inspection observations and actions
h) Contractor must obtain signoff of all landscape works at the completion of the 12 week maintenance period. To obtain signoff all plants
must display health and establishment, mulch must be at the specified depths, imigation must be in complete working order, timber elements
must be re-stained within 2 weeks of maintenance completion, electrical elements must be in complete working order, concrete is to be clean
and free of cracks and depressions, turf is to display a healthy dense even sward to 95% cover and generally the landscape must dispray
compliance with industry standards. If at the final inspection, the landscape does not obtain signoff, the landscape contractor must continue to
maintain until the landscape is compliant with the above standards.
Planter box shown without lining
for information purposes. Both
boxes require lining
Stainless steel angle
brackets with ss. coach head
bolts connecting battens
TIMBER POTS - DETAIL SECTION
BUSH ROCK SCHEDULE
Small 200-300mm in any direction
Medium 500-600 in any direction
Large 700-800 in any direction
* Bush rock to be smooth/round faced and
free from chips and scraps.
* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..
impermeable rigid
membrane lining
timber boxes
Stainless steel angle
brackets with ss. coach
head bolts connecting
battens
100x35 Hardwood
timber battens
TIMBER POTS - DETAIL PLAN Scale 1:20
100mm mulch as specified
and imported podium
topsoil mix in planter boxes
WALL OF UNIT
impermeable rigid membrane
lining timber boxes
100x35 Hardwood
timber battens
400mm mulch as
specified & imported
podium topsoil mix
Sos
= Poe
L508
LLG8
LOGS
Maia
BON
Concrete blocks
supporting planter boxes
at their required height
is
os
nite
LVS
05
SID
Od
$s
es
LX
XS
XJ
He
Ks
os
ee
USC
bo
4
ie
OX
Drainage medium
(by others)
EDGE OF PODIUM GARDEN BED
Scale 1:20
LEGEND -
80mm depth gravel as.
detailed & specified
Bush boulders as scheduled
Tree planting as scheduled
Shrubs & Groundcovers as
scheduled
ro
~6 JUL 2007
5545 a
FRONT COUR.
oe
’-
c a ad
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J, Burred
2nd Floor Esplanade and Secand Buikding. Mar
P.O. Box 18 Maroochydore 4558
landgraphicegPfexinet.com.au
wrune Jandgraphics.com.ay
Tel: (07) 5443 4044
Fay: (07) 5443 4534
COPYRIGHT ; No reproduction al all o¢ part a his crawing may be unooraken wlhout
The express wnitien permission of the ausher.
SUNVIEW VILLAS
roachydore
‘Client
Mr. J CAMERON & Mr. J McComax
Architect
WILL FRANKLIN DESIGN
Drawing Tie
LANDSCAPE PLANTING PLAN,
DETAILS & SPECIFICATION
03 OF 03
Page 12
2x AUSbb
4x DilAcae
_< 1X MACluc
By
BS, 1x DORexc
Ze
GF
2 medium & 1
small bush rock
as scheduled
2x AUSbb
3x VIOhed
4th FLOOR PLANTING PLAN
Scale 1:100
PLANT SCHEDULE -
CODE SCIENTIFIC NAME COMMON NAME SIZE QTy
Shrubs
ALParu = Alpinia arundelliana Dwarf Ginger 200mm 7
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 4
CORmb = Cordyline rubra ‘Red’ Red Palm Lily 200mm. 4
DORexc Doryanthus excelsa Gymea Lily 300mm 2
LiNmon —_Linospadix monostachya Walking Stick Palm 300mm 17
MACluc Macrozamia lucida Pineapple Zamia 300mm 2
XANjoh = Xanthorrhoea johnsonii Grass Tree <300 trunk 1
Tussocks & Ground Covers
ANigem Anigozanthus ‘Bush Gem' Bush Glow Kangaroo Paw 140mm 6
PANjas Pandorea jasminoides Pink Bower of Beauty 140mm 3
DlAbre —— Dianella brevipedunculata Flax Lily 140mm 4
\SOnod _—_ /solepsis nodosa Knobby Club Rush 140mm 2
ViOhed Viola hederacea Native Violet 140mm 47
1x MAClud in
timber pot as
detailed
1 medium & 2
small bush rock
as scheduled
6x ANigem
1x PAnjas
2x CORrub
1IxPAnjas
smail bush rock
as scheduled
3rd FLOOR PLANTING PLAN Scale 1:100
SPECIFICATION
EXTENT OF WORKS
Contractor should take full account of documentation of Civil Engineering, Hydraulic and Electrical Engineering Works. Landscape works are
ta include the following:
EXCAVATION AND DRAINAGE
Break up and remove any excess concrete slurry from construction works to achieve Tequired planting depths. Excavate site sod to a depth of
100mm. Break up remaining subgrade to a depth of 100mm. Drainage is to be incorporated to alf planting areas that are enclosed by hard
edging and not otherwise drained. Contractor should allow for overland gravel drains through mulched areas to stormwater catchment pits.
IRRIGATION
Irrigation for the project shail be carried out by an experienced and reputable irrigation contractor - Tenderers intending to handle the irrigation
themsetves will be required to demonstrate proficiency in this area. Submit an irrigation plan to the site Supervisor for approval prior to
installation. A fully automated and programmable irrigation system, with ramswitch, is ta be provided fo all Garden areas. All fittings are to be
fully effective and inconspicuously placed with lines placed through conduits under hard surfaces. Water connection points wi be the water
tanks at the rear of each lot. The system should provide requlated application to all areas with no overspray or runoff onto hard surfaces,
Irrigation systems are to be guaranteed for a period of 12 months against faulty materials and workmanship.
TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to be progressively filled with premium grade blended organic garden soil mix to a minimum of 400mm depth. Soil to be an
approved garden organic mix. Soil supplier as well as intended mix is to be nominated. Soil is to be mounded to facilitate good drainage to
hardstand areas (max 1:3 grade} and is to finish 50mm below edging after settlement. Organic additive such as ‘Dynamic Lifter is tobe...
incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote' or equivalent is also to be incorporated
with individual plantings in accordance with the manufacturers recommendations.
EDGING
Provide an extruded concrete edge to all garden beds where adjacent to grass areas. Line of edging to be set out and approved on site prior
ta construction.
SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and to show Planting to best advantage.
Contractor is to seek canfirmation of finished levels prior to final plantings and application of mulch.
CONTAINERISED PLANT MATERIAL
Plant material is to be approved by superintendent prior to planting. Planting is to be carried out in a manner consistent with good horticultural
practice. All 300 pot and larger plant material is to be guyed and staked as per Detail - Advanced Container Planting. Smatier plant stock is to
be staked as necessary. Stakes shall not pass through the rootball of plant at time of planting or any time thereafier.
Stock may be rejected if plants are:-
a) Undersized proportional to specified container size or is the root system if underdevelaped
b) Oversized proportional to specified container size or severely root bound.
c) Unbatanced or uncharacteristic of normal or specified growth pattem for the species.
d) Not suitably acclimatised for the specific environment.
e) Diseased, infested with pests or suffering from other form of significant stress.
GARDEN MULCH
Mulch shail be one inch hoap pine muich to predominant depth af 100mm. Mulch is to be graded to avokd placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.
TURF
a) "SIR WALTER" minimum sod depth 25mm
b) Turf to be laid within 24 hours af being cut
c) Allow for ground preparation and deposition of 50mm imported garden loam topsoil
d) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface
CONCRETE & PAVING - SUPPLY AND INSTALLATION
To all areas as shown on drawings, supply and install exposed aggregate coloured concrete and pavers. Concrete colour, aggregate
selection paver selection and installation details as nominated on the plan Paving Schedule. Instalfation to follow industry best practices
including ground preparation, compaction, minimal slump allowances and minimum joint distances.
GRAVEL - SUPPLY AND INSTALLATION
Supply and instal! minimum 80mm depth approved 16mm-20mm Cream River Gravel to a compacted sub base to all areas shown on the
plan.
MAINTENANCE
a) Obtain signoff of all landscape construction works prior to commencement of the maintenance period. The maintenance period will not be
deemed to have commenced without signoff.
b) Monitor plant performance and stress constantly and take appropriate remedial action. Sol moisture levels are critical during early
establishment
c) Mow turf every 1-2 weeks or as required to ensure turf does nat exceed 80mm height.
d) Prune and shape all shrubs and trees as required. Repiace at the contractors cost all plants which display a loss of condition or are stolen
& vandalised.
@) Monitor irrigation performance and take remedial action where required.
1} Fertilise all garden beds at completion of maintenance period (12 weeks).
g) Contractor shall maintain an up to date written log book to record inspection observations and actions
h) Contractor must obtain signoff of all landscape works at the completion of the 12 week maintenance period. To obtain signoff all plants
must display heaith and establishment, mulch must be at the specified depths, irrigation must be in complete working order, timber elements
must be re-stained within 2 weeks of maintenance completion, electrical elements must be in complete working order, concrete is to be clean
and free of cracks and depressions, turfis ta display a healthy dense even sward to 95% cover and generally the landscape must display
compliance with industry standards. if at the final inspection, the landscape does nat obtain signoff, the landscape contractor must continue to
maintain until the landscape is compliant with the above standards.
Planter box shown without lining
for information purposes. Both
boxes require lining
Stainless steel angle
brackets with ss. coach head
bolts connecting battens
BUSH ROCK SCHEDULE
Small 200-300mm in any direction
Medium 500-600 in any direction
Large 700-800 in any direction
* Bush rock to be smooth/round faced and
free from chips and scraps.
* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..
Impermeable rigid
membrane lining
timber boxes
Stainless steel angle
brackets with ss. coach
head bolts connecting
battens
100x35 Hardwood
timber battens
TIMBER POTS - DETAIL PLAN Scale 1:20
100mm mulch as specified
and imported podium
topsoil mix in planter boxes
WALL OF UNIT
Impermeable rigid membrane
lining timber boxes
100x35 Hardwood
timber battens
Q
OY
ORR’
SRR
100mm mulch as
specified & imported
podium topsoil mix
Concrete blocks
supporting planter boxes
at their required height
Drainage medium
EDGE OF PODIUM GARDEN BED
TIMBER POTS - DETAIL SECTION
(by others)
Scale 1:20
LEGEND -
AMENDMENTS
80mm depth gravel as
detailed & specified
Bush boulders as scheduled
” Tree planting as scheduled
Shrubs & Groundcovers as
scheduled
description
dats
27.06.07
Cc a
LANDGRAPHICS
dawn
ORIGINAL ISSUE ALS
d
LANDSCAPE ARCHITECTS
Principal: Robert J. Burrell
2nd Fino. Esplanade and Sacand Auiding. baroocnydore
P.O. Box 18 Mavoochydore 4558
handgraphics@ fexinat com,au
plandgré comau
Tet (07) 5443 4044
Far. (07} 5443 4534
COPYRIGHT: No reproduction of all or pat of this crawing may be undertaken wanout
the express wittien permission of he aur,
SUNVIEW VILLAS
Client
Mr. J CAMERON & Mr. J McComax
Architect
WILL FRANKLIN DESIGN
Drawing Tile
LANDSCAPE PLANTING PLAN,
DETAILS & SPECIFICATION
Drawing.
Job No...
LA1201
LA03 03 OF 03
Page 13
SPECIFICATION
EXTENT OF WORKS
BUSH ROCK SCHEDULE
Contractor should take full account af documentation of Civil Engineering, Hydraulic and Electrical Engineering Works. Landscape works are Small 200-300 mm in any di rection
to include the folowing: Medium 500-600 in any direction LEGEND
EXCAVATION AND DRAINAGE Large 700-800 in any direction
Break up and remove any excess concrete slurry from construction works to achieve required planting depths. Excavate site soil to a depth of
100mm. Break up remaining subgrade to a depth of 10mm. Drainage is to be incorporated to ail planting areas that are enclosed by hard
edging and not otherwise drained. Contractor should allow for overland gravel drains through mulched areas to stormwater catchment pits.
* Bush rock to be smooth/round faced and
free from chips and scraps.
IRRIGATION hall be sed and 1 nde he * Bury all rock generally 1/2 the rock depth.
rigation for the project shall be carried out by an experienced and reputable irrigation contractor - Tenderers intending to h irigation * ‘ j
themselves will be required to demonstrate proficiency in this area, Submit an irigation plan to the site supervisor for approval prior to Rock selection and burying depths to be
installation. A fully automated and programmable irrigation system, with rainswitch, is to be provided to all Garden areas. Al fittings are to be approved prior to installation..
fully effective and inconspicuously placed with lines placed through conduits under hard surfaces. Water connection points will be the water
tanks at the rear of each fot. The system should provide requlated application to all areas with no overspray or runoff onto hard surfaces.
Irrigation systems are to be guaranteed for a period of 12 months against fauity materials and workmanship.
80mm depth gravel as
detailed & specified
Bush boulders as scheduled
Tree planting as scheduled
CPS o Shrubs & Groundcovers as
TOPSOIL - SUPPLY AND INCORPORATION iy scheduled
Planting areas are to be progressively filled with premium grade blended organic garden soil mix to a minimum of 400mm depth. Soil to be an “pre
approved garden organic mix. Soil supplier as well as intended mix is to be nominated. Soil is to be mounded to facilitate good drainage to
2x AUSbb
4x DlAcae
4x MACluc hardstand areas (max 1:3 grade) and 1s To finish 50mm below edging after settement. Organic additive such as Dynamic tifter‘is to be
incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote’ or equivalent is also to be incorporated
1x DORexc with individual plantings in accordance with the manufacturers recommendations.
EDGING
Provide an extruded concrete edge to all garden beds where adjacent to grass areas. Line of edging to be set out and approved on site prior
2 medium & 1 to construction.
small bush rock
as scheduled SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and to show planting to best advantage.
, Vion ASD Contractor is to seek confirmation of finished levels prior to final plantings and application of mulch.
x er
CONTAINERISED PLANT MATERIAL
Plant material is to be approved by superintendent prior to planting. Planting is to be cartied out in a manner consistent with good horticultural
practice. All 300 pot and larger plant material is ta be guyed and staked as per Detail - Advanced Container Planting. Smaller plant stock is to
be staked as necessary. Stakes shall not pass through the rootbail of plant at time of planting or any fime thereafter.
Stock may be rejected if plants are:-
a) Undersized proportional to specified container size or is the roat system if underdeveloped
b) Oversized proportional to specified container size or severely root bound.
c) Unbalanced or uncharacteristic of normal or specified growth pattem for the species.
d) Not suitably acckimatised for the specific environment
) Diseased, infested with pests or suffering from other form of significant sires.
4th FLOOR PLANTING PLAN
Scale 1:100
GARDEN MULCH
PLANT SCHEDULE - Mulch shall be one inch hoop pine muich to predominant depth of 100mm. Mulch is to be graded to avoid placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.
CODE SCIENTIFIC NAME COMMON NAME SIZE QTy TURF
a) “SIR WALTER" minimum sod depth 25mm
Shrubs b} Turf to be laid within 24 hours of being cut
ALParu = Alpinia arundeliliana Dwarf Ginger 200mm 7 ¢) Allow for ground preparation and deposition of 50mm imported garden loam topsoil
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 4 d) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface
CORrub Cordyline rubra ‘Rea’ Red Palm Lily 200mm 4
DORexc Doryanthus excelsa Gymea Lily 300mm 2 fo eeae a Choon Shavings, supply ad instal exposed aggregate coloured concrete and pavers. Concrete colour, aggregate
i i i i 300mm y + I,
snow Anosha a Hy monosiachy a ny oer oie Zaria 300mm , selection paver selection and installation details as nominated on the plan Paving Schedule. Instalation to follow industry best practices
indudi ion, ion, mini a
XANjoh _ Xanthorrhoea johnsonii Grass Tree <300 trunk 1 induding ground preparation, compaction, minimal slump allowances and minimum joint distances,
GRAVEL - SUPPLY AND INSTALLATION
Tussocks & Ground Covers Supply and install minimum 80mm depth approved 16mm-20mm Cream River Gravel to a compacted sub base to all areas shown on the
ANigem Anigozanthus ‘Bush Gem’ Bush Glow Kangaroo Paw 140mm 6 plan.
PANjas Pandorea jasminoides Pink Bower of Beauty 140mm 3 MAINTENANCE
DiAbre = Dianella brevipedunculata Flax Lil 140: 4
ISOnod _—/solepsis nodosa * Knobby. Club Rush 440mm 2 a) Obtain signoff of all landscape construction works prior ta commencement of the maintenance period. The maintenance period wil not be
ViOhed Viola hederacea Native Violet 440mm 47 deemed to have commenced without signof.
b) Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture levels are critical during early
establishment
c) Mow turf every 1-2 weeks or as required to ensure turf does nat exceed 80mm height.
d) Prune and shape all shrubs and trees as required. Replace at the contractors cast ail plants which display a loss of condition or are stolen
& vandalised.
e) Monitor irrigation performance and take remedial action where required.
f) Fertilise ail garden beds at completion of maintenance period (12 weeks).
impermeable rigid
membrane lining
timber boxes
AMENOMENTS
a
A | 27.06.07 JS
4x MAClud in
timber pot as
detailed
¢) Contractor shall maintain an up to date written log book to record inspection observations and actions
h) Contractor must obtain signoff of ail landscape works at the completion af the 12 week maintenance period. To obtain signoff al plants
must display health and establishment, mutch must be at the specified depths, irrigation must be in complete working order, timber elements
Stainless steel angle
brackets with ss. coach
must be re-stained within 2 weeks of maintenance completion, electrical elements must be in complete working order, concrete is to be clean
and free of cracks and depressions, turf is to display a healthy dense even sward to 95% cover and generally the landscape must display head bolts connecting
compliance with industry standards. If at the final inspection, the tandscape does not obtain signoff, the landscape contractor must continue to battens
maintain until the landscape is compliant with the above standards.
100x35 Hardwood
timber battens
1 medium & 2
small bush rock
as scheduled
6x ANIgem
b
=
c a d
TIMBER POTS - DETAIL PLAN Scale 1:20 LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J. Burret
2nd Floor Eaplanade and Second Bung, Mar
P.O, Box 18 Maroomdore 4558
landgraphics@ texinat com au
wan. rapnics. com.au
Tet (07) 5443 4044
ronchydora
WALL OF UNIT
1 x PAnjas Far, (07) 5443 4534
2x COR 100mm much 0 pei Sa
4x PAnjas Planter box shown without lining and imported podium
impermeable rigid membrane
lining timber boxes
100x35 Hardwood
timber battens Client
Mr. J CAMERON & Mr. J McCormax
for information purposes. Both topsoil mix in planter boxes
boxes require lining SUNVIEW VILLAS
Stainless steel angle
brackets with ss. coach head
bolts connecting battens.
2 medium & 3
smail bush rock
as scheduled
100mm mulch as
specified & imported Architect
SO
SKS
a
o
BES
Oi
Ok
8 A im
a XO4 podium topsoil mix WILL FRANKLIN DESIGN
SO
WN Drawing Tele
SS Concrete blocks LANDSCAPE PLANTING PLAN,
supporting planter boxes
at their required height DETAILS & SPECIFICATION
NS a . NS if
VSR, f
PERO ROSPVorey
Drainage medium
(by others)
3rd FLOOR PLANTING PLAN Scale 1:100
EDGE OF PODIUM GARDEN BED
Scale 1:20 Jeb No. Dawg sheet:
LA1201 LAQ3 03 OF 03
TIMBER POTS - DETAIL SECTION
Used in these records
07/1017 - Response to Info Request [As Published]Related documentApplication case desk ↗