Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2015-03-03 Infrastructure & Services Committee Agenda

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


Infrastructure & Services
   Committee Meeting


             Tuesday, 3 March 2015


                 commencing at 9.00am
         Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon, Noel Playford
Log in to download the original file

2015-03-03 Infrastructure & Services Committee Agenda(PDF, 12MB).pdf · 12.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 77 (of 80)

Section 2

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA             3 MARCH 2015


TABLE OF CONTENTS

ITEM                                                                    PAGE

ATTENDANCE & APOLOGIES                                                      -
PRESENTATIONS                                                               -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                               3
Infrastructure Planning & Design                                           3
1      REQUEST FOR CHANGES TO NOOSA LOCAL ROADS OF REGIONAL
       SIGNIFICANCE                                                        3
2      MUNNA POINT CARAVAN PARK FORESHORE EROSION                         15
COMMUNITY SERVICES DEPARTMENT REPORTS                                     24
3      REVIEW OF THE OPERATIONS OF THE COOROY BUTTER FACTORY              24
Community Facilities                                                      62
4      NOOSA AQUATIC CENTRE (NAC) - HALF YEARLY REPORT TO 31 DECEMBER
       2014                                                               62
5      NOOSA LEISURE CENTRE (NLC) - HALF YEARLY REPORT TO 31 DECEMBER
       2014                                                               66
6      THE J AND BICENTENNIAL COMMUNITY CENTRE (BCC) - HALF YEARLY
       REPORT TO 31 DECEMBER 2014                                         71
7      NOOSA COMMUNITY CARE (NCC) - HALF YEARLY REPORT TO 31 DECEMBER
       2014                                                               76
CLOSED SESSION                                                        -




                                                                 Page 2 of 80

Section 3

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              3 MARCH 2015



PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Infrastructure Services only)

Infrastructure Planning & Design
1                        REQUEST FOR CHANGES TO NOOSA LOCAL ROADS OF REGIONAL SIGNIFICANCE
DOCUMENT INFORM AT ION




Author                             Project Officer, Beth Potter
                                   Planning & Infrastructure Department

Index                              ECM/ Subject: Roads Maintenance

Attachments                        1.    Updated list of Noosa Local Roads of Regional Significance
                                   2.    Maps of proposed amendments to Noosa Local Roads of Regional
                                         Significance


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Project Officer, Asset Planning to the Infrastructure &
Services Committee Meeting dated 3 March 2015 and:
A.                       Endorse the changes requested to the approved listing of Noosa Local Roads of Regional
                         Significance as presented to the Northern South-East Queensland Regional Roads &
                         Transport Group; and
B.                       Appoint Cr Frank Pardon as Council’s representative on the Northern South-East
                         Queensland Regional Roads & Transport Group.



REPORT
This report seeks Council endorsement of a request made to the Northern South-East
Queensland Regional Roads & Transport Group (NSEQRR&TG) to make changes to the list of
roads in Noosa Shire classified as Local Roads of Regional Significance (LRRS). If the request
is approved by NSEQRR&TG it will provide Council with a greater selection of eligible roads to
spend future Transport Infrastructure Development Scheme (TIDS) funds.

Cr Bob Abbot is currently Council’s representative on the NSEQRR&TG and he has requested
that another Councillor replace him in this role. This report also seeks to appoint Cr Frank
Pardon as Council’s representative.

1.                       Northern South-East Queensland Regional Roads & Transport Group (NSEQRR&TG)

Regional roads groups have been established throughout Queensland with the purpose of
(among other things):
 Managing TIDS programme investment on the regional transport network and ensuring the
   annual TIDS allocation is spent in accordance with the policy;




                                                                                                  Page 3 of 80

Section 4

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015


 Determining the LRRS network and advising changes to the Roads & Transport Alliance
   Board (representatives from Transport & Main Roads and Local Government Association of
   Queensland).

The NSEQRR&TG is comprised of representatives from four Councils:

1.   Noosa Council;
2.   Sunshine Coast Regional Council;
3.   Moreton Bay Regional Council; and
4.   Somerset Council.

This request for amendments will be presented to the group on 27 February 2015.

2.    Transport Infrastructure Development Scheme (TIDS)

The TIDS provides funding to local governments for transport related initiatives which support
State government objectives.

Funding categories applicable to Noosa Shire are:

1. Construction or upgrade of Local Roads of Regional Significance (LRRS);
2. Development of cycle-ways, shared paths and crossing provisions; and
3. Provision/upgrade of road and transport infrastructure that improves the safety of children
   travelling to and from school.

All funds are to be matched dollar for dollar by Council.

For the current financial year all funds allocated to Noosa Council by the NSEQRR&TG are being
spent on improvements to road and transport infrastructure that improves the safety of children
travelling to and from school.

Funding for the 2015/2016 financial year is expected to increase due to the method used by the
State government in allocating funding based on the number of Council’s within regional roads
groups, resulting in a larger allocation to the Group and Noosa Council.

3.    Local Roads of Regional Significance (LRRS)

The LRRS is a network of roads of similar function owned by state and local governments.
Criteria for LRRS are that they:

1. Provide a primary connecting function across more than one local government area within a
   regional road network;
2. Form a key part of economic development strategies within local government areas (major
   access to rural, agricultural, industrial);
3. Play a key role for regional industry and access to attractions of regional significance and
   major natural resources;
4. Connect shires, towns, cities and regions and provide travel time and distance savings to
   commuter routes;
5. Provide access from a higher order regional road to rail head, freight depots, ports and major
   airfields;
6. Provide access to regionally significant institutions (community health, education, recreation,
   youth, aged care and entertainment facilities); or
7. Form the only access to a remote community.



                                                                                    Page 4 of 80

Section 5

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                 3 MARCH 2015


Attachment 1 includes the updated list of Noosa LRRS.

Attachment 2 provides maps which show in greater detail the proposed amendments to the
Noosa LRRS.

The main reasons for the amendments requested to the Noosa LRRS are to adjust for new roads
and changes to roads, to map a more logical traffic route or to include other roads that meet the
above criteria.

The request to add roads to the Noosa LRRS will not increase the TIDS funding allocation to
Noosa Council, however it will enable greater flexibility for Council in future years in allocating
TIDS funds across the network.


Previous Council Consideration

Ordinary Meeting, 3 April 2014, Item 16, Page 9
That Council note the report by the Administration Officer, Executive to the Planning &
Organisation Committee dated 25 March 2014 and:
E.   Appoint Cr Bob Abbot as Council’s representative on the Roads and Transport Alliance.

Ordinary Meeting, 31 July 2014, Item 5, Page 4
That Council note the report by the Civil Operations Manager to the Infrastructure & Services
Committee Meeting dated 22 July 2014 regarding the 2013/14 TIDS funding.

Finance & Risk

Nil.

Consultation
External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Coordinator Design & Traffic
Civil Operations Manager

Departments/Sections Consulted:

       Community Services                      x   Planning & Infrastructure
       Disaster Management & Public Order          Building & Plumbing Services
       Waste & Environmental Health                DA Planning
       Community Facilities                        Strategic Land Use Planning
       Cultural Facilities                     x   Asset Design & Investigations
                                               x   Asset Planning
                                               x   Civil Operations
                                                   Environment

       Executive Office                        x   Corporate Services
       Community Engagement                    x   Finance
       Customer Service                            ICT
       Executive Support                           Procurement & Fleet
       Governance                                  Property & Facilities
       Human Resources                             Revenue Services



                                                                                     Page 5 of 80

Section 6

Page 6 of 80

Attachment 1 — Updated list of Noosa Local Roads of Regional Significance
   ee                               eee Start Description                  End Description                      Comments or Amendments

 Greenridge Pinbarren Road                   Pomona Kin Kin Road           Queen Street                          Existing LRRS — no change

 Queen Street                                Greenridge Pinbarren Road     Bridge Street                         Existing LRRS — no change

 Bridge Street                               Queen Street                  King Street                           Existing LRRS — no change

 King Street                                 Bridge Street                 Traveston Cooran Road                 Existing LRRS — no change

 Traveston Cooran Road                       King Street                   Shire border                          Existing LRRS — no change

 Cooroy Belli Creek Road                     Kenilworth Skyring Creek Road __| Maple Street                      Existing LRRS — no change
                                                                                                                Additional LRRS, connector road to Elm Street
                                                                                                                 (TMR road), and connector road to regional
 Maple Street               Cooro            Cooroy Belli Creek Road       Myall Street                          institutions
                                                                                                                Additional LRRS, connector road to Elm Street
                                                                                                                 (TMR road), and connector road to regional
 Myall Street               Cooro            Maple Street                  Elm Street                            institutions
                                                                                                                 Existing LRRS — no change
 Dr Pages Road              Cootharaba       Gympie Kin Kin Road           Kinmond Creek Road
                                                                                                                 Existing LRRS — no change
 Kinmond Creek Road         Cootharaba       Dr Pages Road                 Cootharaba Road
                                                                                                                 Existing LRRS — no change
 Cootharaba Road            Cootharaba       Kinmond Creek Road            Junction Road
                                                                                                                 Existing LRRS — no change
 Junction Road              Cootharaba       Cootharaba Road               Louis Bazzo Drive
                                                                                                                 Existing LRRS — no change
 Hastings Street            Noosa Heads      Claude Batten Drive           Noosa Drive
                                                                                                                 Existing LRRS — no change
 Noosa Drive                Noosa Heads      Hastings Street               Weyba Road
                                                                                                                 Existing LRRS — no change
 Sunshine Beach Road        Noosa Heads      Noosa Drive                   Edwards Street, Sunshine Beach

                                                                                                                                                          Page 6 of 80

Section 7

Page 7 of 80

ee                                    ee Start Description                 End Description                       Comments or Amendments

 Weyba Road                                                                Gympie Terrace, Noosaville            Existing LRRS — no change
                                                                                                                 Additional LRRS, main thoroughfare from
                                                                                                                 Hastings Street to Gympie Terrace (attractions
 Noosa Parade               Noosa Heads      Noosa Drive                   Weyba Road, Noosaville                of regional significance).

 Gympie Terrace                              Weyba Road                     Eumundi Noosa Road                   Existing LRRS — no change

 Hilton Terrace                              Eumundi Noosa Road             Memorial Avenue, Tewantin            Existing LRRS — no change
                                                                                                                 Additional LRRS, preferred route between
                                                                                                                 Weyba Road and Eumundi Noosa Road,
                                                                                                                 connecting to industrial zones, significant
 Mary Street                Noosaville       Weyba Road                    Gibson Road                           commuter route.
                                                                                                                 Additional LRRS, preferred route between
                                                                                                                 Weyba Road and Eumundi Noosa Road,
                                                                                                                 connecting to industrial zones, significant
 Gibson Road                Noosaville       Mary Street                    Eumundi Noosa Road                   commuter route.
                                                                                                                 Additional LRRS, main connector road to
                                                                                                                 Eenie Creek road, connecting to industrial
                                                                                                                 zones, significant commuter route and
 Reef Street                Noosaville       Weyba Road                     Eenie Creek Road                     regionally significant facilities.

 Beckmans Road                               Eumundi Noosa Road            Cooroy Noosa Road, Tewantin           Existing LRRS — no change

 Eenie Creek Road                            Eumundi Noosa Road            Ben Lexcen Drive, Sunshine Beach      Existing LRRS — no change

 Eumundi Noosa Road                          Hilton Terrace                 Eumundi Noosa Road (State Controlled) | Existing LRRS — no change
                                                                                                                 Additional LRRS, missing from portion of
                                                                                                                 Walter Hay Drive already included in LRRS.
                                                                                                                 Joins to Eumundi Noosa Road. Connector road
                                                                                                                 to industrial Zones, significant commuter route
 Walter Hay Drive           Noosaville       Eumundi Noosa Road             Emu Mountain Road                    and regionally significant facilities.
                                                                                                                 Additional LRRS, preferred route to detour
                                                                                                                 traffic to more direct route on higher order road.
                                                                                                                 Removes Bicentennial Drive and Ben
 Edwards Street             Sunshine Beach | Sunshine Beach Road            David Low Way                        Lexcen Drive from LRRS.

 David Low Way              Sunshine Beach   Edwards Street                 Emu Mountain Road                    Existing LRRS — no change

                                                                                                                                                          Page 7 of 80

Section 8

Page 8 of 80

Heathland Drive             Sunshine Beach     Eenie Creek Road                David Low Wa                            Existing LRRS — no change
                                                                                                                       Additional LRRS, connector road to Goodchap
                                                                                                                       Street which services Noosa Hospital,
Ernest Street               Tewantin           Hilton Terrace                  Goodchap Street                         significant regional institution.
                                                                                                                       Additional LRRS, services Noosa Hospital,
                                                                                                                       significant regional institution, significant
Goodchap Street             Tewantin           Ernest Street                   Eumundi Noosa Road, Noosaville          commuter route.

                                               Hilton Terrace                  Doonella Street                         Existing LRRS — no change
                                                                                                                       Additional LRRS, preferred route to detour
                                                                                                                       traffic from Tewantin CBD, significant commuter
                                                                                                                       route. Removes part of Poinciana Avenue &
Doonella Street             Tewantin           Memorial Avenue                 Sidoni Street                           Memorial Avenue from LRRS.
                                                                                                                       Additional LRRS, preferred route to detour
                                                                                                                       traffic from Tewantin CBD, significant commuter
                                                                                                                       route. Removes part of Poinciana Avenue &
Sidoni Street               Tewantin           Doonella Street                 Poinciana Avenue                        Memorial Avenue from LRRS.

                                               Sidoni Street                   Butler Street                           Existing LRRS — no change
                                                                                                                       Additional LRRS, newly constructed connector
                                                                                                                       road, significant commuter route. Removes
                                                                                                                       Goodwin St and Cullinane Streets from
Butler Street               Tewantin           Cooroy Noosa Road               Cullinane Street                        LRRS.
                                                                                                                       Additional LRRS, services Noosa River Ferry,
                                                                                                                       forms the only access to a remote community
                                                                                                                       (Noosa North Shore and Teewah village) and
Moorindil Street            Tewantin           Poinciana Avenue                Noosa River                             attractions of regional significance.

                                               Cullinane Street                McKinnon Drive (State Controlled)       Existing LRRS — no change

Cooroy Noosa Road                              Butler Street                   Cooroy Noosa Road (State Controlled)    Existing LRRS — no change

                                                                                                                                                                   Page 8 of 80

Section 9

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                   3 MARCH 2015


Attachment 2 – Maps of proposed amendments to Noosa Local Roads of Regional
Significance




                                                                       Page 9 of 80

Section 10

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 10 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 3 MARCH 2015
  SW                      SASS
            TKS  SS             Tee OF
       0 |\_ BRS           A      7S ba
 | RLY        BA |       \>         Ay PS    A
      7       A 7»        a  YI  q Ei    Sy,
  <\_ Ils          &   anil! S   auth RSS    f
S28        H                   J Hie
    Ye  Sree t 3        a ear      ULE  oy
L     AS A  |]       Seti Pea | eam     4.
     Se        )        Fis  +    HUI   E
    $5) gon    ae           PN    te OS
    <Q    eA      FG   ie   eG | ae iE)
NS             (oss       AR Cee
  aN         A)  Ses 6 A Ne          SN
|          (FAR IT BAY                     g
K\— SS         : my)      FAS              ‘
   ,              g                        i
                 A aN     Ui  pre  es
                          “py; Ost
           i     SS            ~~,
Legend   Cooroy Proposed LRRS Changes
  Water Bodies LRRS Changes
 =      Esa                 0 100 200 300 400 oo
                                      Page 10 of 80

Section 11

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 11 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 3 MARCH 2015
      VX,
                |          A
ie Batis =  a        )  fi a |
Ci SBE ae           ES a! SSE
 ae          i      ezas
    ae       SAE EY                     :
 pe Pee
 _/E Tippee                 Ne
 [SHH sp 7 a TE Ta,                 =
S                TARY Haag        <7
Y                            D
9                              5
BY CAS sSR

                                  Page 11 of 80

Section 12

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                                    Page 12 of 80

— BrYXooa ew.                                             —                  3S     ALE Bas —
           i     Seon ey                                                   9          ESS LY            —
           |   a                 eal éy,        WA, =          ! Ne SEH es
           '    rungs YOM        Get       Ht    £9                    oS AFB HE See a | Be"
           ii    ler aed oo lk   aa}  A   L                                ; : Hepa Pane 6
             Salaun      S| | io 3          a7    Ma         in |      a   les sree
           Bad?      Tomy        Be LN ES        Te by] “Bas T) “aS —   see ree |    SS BY
           BY                    A     e  ~    .    ep) el Ahm Le Pee Se f BS AE Cay |) pt ta! mo They — ¥
               UT       b       Rete heal Wf. we } We (ay DET a C) fecaee se “Es ar I amy stare
               NA pr RO        p—~6&                Si              3         fey i HT A
                   bil LTT) ORES                :   4    HkUT fal Bie see <4 ww      Tare
                   SEES               tea SUSE Sages            BE      ates   ARO      EEN
                    —_j                       7 Titty. ns     =    +r a         6 HSS   Ee gS           {
                 Ov.          “ee,   I    roe dit  =  Fe TT OE CaS                     Ig F BS       ZF)
                i :        BS mt /Z           TT Lae      SD,  egg UT         ennai    Al ~ Sa
                bs          Ben              OSH,                 REIS Ue                   SO Ne
                 ae         a tt               Mey   ARI        D    red STR     !  ON         KML | E>
                 RO        POT      Wann     Were    AR      Q         Ll TOS           ei |     Sy PS
                 ae        oF  US      BH MGS       AS         CU»        YRS         a     |     YE
                 BA\     S Soe     i       Ressay   AN’    Cv      een    Z     VDA  &      |    b feo
                            ey t)  }      TARAS ES  eS            OTF RL 4           ci     }    S Bod ;
                    CX OSEAY ECR TSG 4 en                  KO) 6)       um            OR   |      BRE
      By                    SRY  a Soh, KOS Airs ES                            RO   riish         AUTOS
  5 ee |         T \                 HE  2 PS BIN,        Sy ope =        S ASS       3           ss .
         5       Lome SRO     PY) DoH    ORs ©:        mA,     yf ite, A     r        =)           <5
 “fp  eS , ie    t we = CES   Y    (7 ‘a , ee x Y n >,     >    til] i! TT} is         = Cy
 eee           ABM SO                SERO”_//        gf Renu          Sty, ss         B:
   Y    SR?        a iH \NOSe S Cy        ST          {}  [7         Ca               AS
 Jesh Be          Ste                               A ORS                R     ee
  Tee WY       (Ey EBESZSX          SOS             PT         iy LR,     Loe        <V§  Om
   HEY         nity rgeaees Sy T | T) & '               SLO       ST Om,    STS    SONS         mo,
ne TX.   ie      |   oe     ’ a               m    I   AG    Bt = cas x ne Y)  cs CS Sy  —         ™
    Ral         NC eas                        mead      2    Rape
 PROOF            \   (   <p  ty                 EBA    °    Dera)   eT NOTTS                =        -
 5        ,                Piped                uu        OOS LT HS CS                        =i
 QE            wYA           LTS                         UT        HP AT RSS                  Ck
 ph         “eo SOL Fy bes BSS ‘ ud a                 oo     an  a   .  Ve                    i
  Rete ia       ¥ rar      SORRY            —                   ie                            Co
  pe      Ken, es 4 A   |         =   > —_                  —   =                             =
 SS ee                                                           —                            :
Pe         CP) eg    dA               \                                                        =
 Legend                     Noosaville Proposed LRRS Changes
    Water Bodies LRRS Changes                                                                        a
—— TR Roads. New                                                      0 100 200 300 400 500m        @
 Cadastre  — Existing                                                    a
 [_] Land Parcel — Remove
                                                                                                  Page 12 of 80

Section 13

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                                    Page 13 of 80

|}              a                                          q                                      —
                      |  R080 225 No Tyee 3
                    |               %                                         Pa    =
           oe -     |i                                                                           a
                                                                                             at   ERE Na —    ba” Ls
                                                                                            wy        Sed |e be) by
                                 ‘                                                    Sa                   BY Sle 7
                                                                                     sy <b ae»              = Ol ae A
                                                                                 Sats                        “i     &
                                                                              Te ET eS      OB             _ | {Tag  ‘
                                                                               ge Fmt TS                   hy 1
                                                                   sae oe                Dy               TT  a
                                                              - FS                \ oy           f?      Ul   BS
                                                          FSS VLE RS Se "                           le SS     ay
                                                         (red M         SES SS       ye RS                    Ns
                                                           ge    AN) ee wa  ch} .\                 34 | Re 4  \ ‘i S
                                                         U0    7 EF a             Toei sar Ke ll eS 9          VR
                                                          o{     ®, AL            OR Ne        nT eh    IER :   Si
        |                                                 ey)    Dx Vi            [Xé i} TET yes Be,   V4 Sige    QS
Ne                                                 a            Li              Ade o          Bee    eda          oy
                                                  ST                           CRE     SS ep Se I] || Bess         i
                                     o   Sie      Wasim  BO emt               \        /   VE ERs Alls, ear =      SS
                                           b      (en :   :                            a, =       A       re        Q
                               ee          ONO           ES Be) SU              \    1] > Th EEF           Seg A Pham
                                “ae a SAS        ‘Seppe STH oop ee]   O                 +,     vy   o        ae va) |
                                Fa [hs SO SOG BY vel Pete TA aap A                      Ce 9 ERO              La
                    4%      ai CH Fi Rw   = a   5    uch bel) (ees ATE _               I  = 5       S/ hs 4 On  CBE
              5)   ge?                                Anes      OS,   Sa                SES       ASG           Ht,
                 ty Teaiseisoe sft                    2     9 wotha daye TTS            HEE   BOF     SCS ke   TT
fl        OT         eet ES oa tome                  cone            ae                   a    Ss     CAG
AU    8      = Pires a a 9               SS          Ss a         ams                SAR EO          Ni           g
Perec eI                         TY  {)                   "                         &y                Le
i es Re tel           ep   ed                                                       KIA            a ae ek eRe
 AY Bg SBeP oro       mee?                                                          Ease               PRS 5
De  “ cr - My Se |] | Th dh aan Le                                                  iY ] J i             et    A =
 Fig  Ke     tet lary Street Lf OSHTA Ai                                     —      KOT A |          A)   &)     XY
Hea Ss | GM      Br.      et                                                 ESTs p TAY, oh        Ara Stest       Ss
1 So                    ORT                                                  OER         ache     CAH
b|    4   ul] J     [)                                                       (604: Sees   3         5 ©       .
 te oe                 Sarthe)                                                2 BST    ws:         AS
|                   6 QAM eae iN                               ,                Ps   Ta ay t} a,  g   UU
 Legend                           Noosa Pr                                                              =
    Water Bodies LRRS Changes                      Pp               S Changes
                                                 oposed LRR
Cadastre   __ eting                                                                                               .
—— TMR Roads
[-_] Land Parcel — Remove                                                      0  100 200 300 400 500m          C)
                                                                                ——
                                                                                                            Page 13 of 80

Section 14

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 14 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 3 MARCH 2015
                                                    BY
                                                    eR
                                                     SS
                                                      aa
                                                      cr
        |                                             =e
               )          ons WW      by            5S
                                     a              BE
               YS)         AWE TT    a               i
              7           VM EVAR   Ae ESS,          xX
            7          S    DO     WT    Taare 6     ~ CX
           ;               eK ALITT Es" NE
                          SRN            EDS. ANG
           .                NV Aeese   ser          SS
             SS          be    YF}     LK SY SQ
                           =      5    a       QO     Xe)
               “S|       HEI    DSSS   BR QS Ss
                   S     a         REA SRO
                      \ | Cire  2 s         5,     BS
                        <I          Chi                % 1
                       faite         So    GRE POSS
                       | 1S           x     BN     C29
                      ' Oe        *         LB SRS
        -   —         ! WIE                BS RRS     SF
ci                    POON
                      EPG  SEO              CE SS
  y                  igs     ¢       D>        KH Bes
          |   eras | BSB     NO     C3       Nee = ae
                      aac LS         ISS      NO  SERS
                      anh hee Ba         ‘iletome Soc PONS fay x
                     be ara eat)        STITT Eady  SOR
                     pln? ares 2 iS >    L | Ra ia \\ JS PEL
                     Be eS Su          OQ   cant, \ Says
                       ne aN,         A SIS SL
                          ) ay * SIZ, {7   ©  Oe Stee re d
                    7      MLSS      LD?    AER BY
                    PH late A Os    {/) 7        moe Hot
                    ATE AOR           RUD O    RII
       |           =      a“      ;   i> a      A QO OR
       |             S              CAL AR IEA   Z    e\
      |     Gramtree Couat ry io 6 > OSS Ce      C5
      ty   —   NO Es       =   ox  NR RR NWO          V
      Y            SEU       Coe GY           lea
                 b PAA       OA     Oh         SB ow
                 KN.   1 |  xO : SDS) i        (EU ER, A
  Legend Sunshine Beach Proposed LRRS Changes
    Water Bodies LRRS Changes
 Cone Roots —— New            0  100 200 300 400 po
        —— Existing
 [] Land Parcel — Remove

                                               Page 14 of 80

Section 15

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                      3 MARCH 2015


2                        MUNNA POINT CARAVAN PARK FORESHORE EROSION
Document i nformati on




Author                           Technical Officer, Coastal & Foreshores, David Shing
                                 Planning & Infrastructure Department

Index                            ECM/ Subject/ Beach Erosion

Attachments                      1.   ICM Drawings
                                 2.   Proposed Dredge Area


EXECUTIVE SUMMARY
The Munna Point foreshore was severely eroded during Cyclone Oswald in January 2013. The
erosion caused large trees to become undermined and also a large scarp had developed along
the shoreline. Council immediately installed a geofabic wall as emergent works to stop further
erosion. The Development Approval for these emergent works asked for Council to look at a
permanent solution to address erosion at this site.

The Department of Environment and Heritage Protection recommended Council trial a groyne
field to address the erosion and channel issues which will ensure that any sand nourishment on
the Munna Point Caravan site would be protected.

RECOMMENDATION
That Council note the report by the Coastal & Foreshores Technical Officer to the Infrastructure &
Services Committee Meeting dated 3 March 2015 providing an update on the Munna Point
Caravan Park Foreshore Protection project.


REPORT
The purpose of this report is to advise the Committee of the design, cost estimate and
approximate timelines for the Munna Point Caravan Park Foreshore Protection project.

Design
It is proposed to install three geofabric groynes along with a geofabric scour mattress. The
purpose of this construction is to trap sand between the groynes to maintain a beach profile and
manage the channel flow away from the eroded foreshore to allow sand renourishment. A copy
of the design drawings is provided at Attachment 1.

Cost Estimate
A cost estimate was produced by the consultant International Coastal Management (ICM), for the
three groynes, however their estimate did not include the placement and filling of the three scour
mattresses which were required. Our total cost estimate for all three groynes including scour
mattresses and contingency is $62,000.

Timelines
Designs have been completed. Applications have been lodged with the Department of State
Development, Infrastructure and Planning with approval usually taking 6 to 8 weeks. Approvals
are expected to be finalised mid-April.

It is anticipated that construction will then be completed by the end of May 2015.




                                                                                         Page 15 of 80

Section 16

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                 3 MARCH 2015


Sand Source
An application has been lodged to amend an existing Dredging Permit. A map of the proposed
area is provided at Attachment 2.

Dredging Operator
Broadwater Dredging is programmed to undertake the required dredging to fill the groynes and
scour mattresses. They are due to be back in the Noosa River at the end of March to align with
this work.

Previous Council Consideration

Ordinary Meeting, 25 September 2014, Item 2, Page 4
That Council note the report by the Director Planning & Infrastructure and Senior Technical
Officer to the Infrastructure & Services Committee Meeting dated 16 September 2014 and:
A.       Request that a detailed assessment for the development of a hydrodynamic model for the
         Noosa River between Tewantin and the river mouth be prepared for consideration by
         Council at the next budget review; and
B.       That a Tidal Works application be submitted to the Department of Environment and
         Heritage Protection for the trialling of geotextile sandbag groynes at Noosa River Holiday
         Park located at Munna Point.

Finance & Risk

Financial risk to Munna Point Caravan Park
Public Safety Risk

Consultation

External Consultation - Community & Stakeholder

Munna Point Stakeholders
Department of Environment and Heritage Protection
Department of Natural Resources and Mines
Maritime Safety Queensland

Internal Consultation

The Property & Facilities Branch has been consulted through this process.

Departments/Sections Consulted:

x    Community Services                        x   Planning & Infrastructure
     Disaster Management & Public Order            Building & Plumbing Services
     Waste & Environmental Health                  DA Planning
x    Community Facilities                          Strategic Land Use Planning
     Cultural Facilities                       x   Asset Design & Investigations
                                                   Asset Planning
                                                   Civil Operations
                                                   Environment

     Executive Office                          x   Corporate Services
     Community Engagement                      x   Finance
     Customer Service                              ICT
     Executive Support                             Procurement & Fleet
     Governance                                    Property & Facilities
     Human Resources                               Revenue Services



                                                                                    Page 16 of 80

Section 17

ATTACHMENT 1




   Page 17 of 80

ATTACHMENT 1

                                  .                                    ‘                   DRAWING REGISTER
                     International                     oo                :                 06.02.2015
                                                              =        fe                  MPG-001   SCHEME OF WORKS
                    Coastal                                 yo ;                 .         MPG-003.  GROYNE 1 SECTIONS
                                                            \                              MPG-002   GROYNES - PLAN LAYOUT
                    M                    t                  Y          z                   MPG.005-  GROYNE 3 SECTIONS
OFFICE 50/G Arm, SYC Marina, Main Beach, 4217, QLD, Australia o        :,       we pe
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia fagaen” ey ) Pee eee
TELEPHONE +617 55640564   FAX +61 755329147                          Ss as
WEBSITE www.coastalmanagement.com.au                   Mun        ake SO           ee
eee                                                   4       Ne     EN   i    ae a
MUNNA POINT GROYNES                                       lll      EE,            es

                                                                                                                                      Page 17 of 80

Section 18

Page 18 of 80

’           «7's                                 |                                                                                                                                         LY
                                                                                                                                                                                                                   tie      >
                                                                                                                                                                                                                7
           ae                                                                                                                                                                                                     Sey)       at    ee
                                                                                                                                                                                                             -        Fn, Was : -
                                                                                                                                                                                                           “a         eas?       Pw
 % -                                                                                                                                                                                                       NOTES aac              ~
   an      Nits                                                                                                                                                                                              Scheme of works
 ace       a         3          -                                                                                                                                                                            .  Canesten tig ib eae)
 a                     "s     eo                                                                                                                                                                               Gumiia cine  May Saas
                  :                                                                                                                /                                                                         *  einen  acne aan eg
I"             4                                                              ee                                                                                                                                approval IPOCQ00S7404A33 amanaed
                                                                             nn        -                                                                                                                        to include additional Dredge Area 7 (as
 i                                                                       Ae      \)                                                                                        A                                    shown),
                                                                        a    Re                                                                                                                           2  Works to be constructed as a tnal witn
                                                                  A                                                             =~                                                                          cngomg mantoing evaluate eectveness
                                                             oor     soe                                                  —    i           ———     J                                                     B.    oes iretatra festaching ot
                                                                  ou                                                  yaa                            —                                                       cevstaes) Ge widnsaher gs alles.
                                                                                                                                                       ‘“                                                    Groynes to be marked wah sullable
                                                                                                                ;                                          <<                                                rerprerects of Regional Harbour Mester
                                                                                                              7                                                                                           5  No works within Noosa River Fish Habitat
                                                                                                           A                Approved Dredge Area 1            ~                                              Ares or relevant buffer zones Closest point
                                                                                                                                                                  .                                          && 19m from the boundary
                                                                                                                               (separate approval)                                                           reining
                                                                                         a Ri        A                                                                                                    B  Crm ot more margin refer
                                                                                       Q                                                                                                                     Grawing Mi! to -005
                                                                                    ern                                          VTE Rel                                    \
                                                                         SNosis           “a   eerie Rte ceall                                    ls                          »s        Copier
                                                                                               Pere eee |                                                                        : ~     elite
                                                    .                            7 -s                                  <*        .                                       eg     td    , \
                                       Proposed Trial Groynes         |       ae                                                 D                     ~~                                 <
                                                                 /     Sa     /                              "       ia                           a       =                                 .
                                                                             a                                     Py                            “                                           5            LEGEND
                                                                |         7       ee                              a           —                   ‘        ty     ‘                        fo             RP Bound
                                                                |  5 aN BS) een Tels)                     r »          m ha           ¥                     r          -               F f                MHS J MLS
                                                                     NL             Ser                                       +h                          4                               A                   werdary      ——
                                                                 ga          pipe               Y       a De        .        3           ’            a v                           ’ f                    peroved Dredge Area a
                                                           2 4                             a    y   . ad           -       a                             <                        7                      cocoa Deena We    -         -
                                                   2          ]                            a          a        - y           ry      Pa                       ny                > 4 |                     Target nourishment zone SURAT
                             [                  ee            |                    x      eK. “=           4  =                        os)                         J           7      > b                |Ceotextle Structure —
  Dea                    Derren el]        a                                        So               ae         ae             PS                aes                y                                         __            -—
                                         <                                Ne           %    -         eS             *"                ’    E  es       a          4             ,              ee           ae         ee
                   erecta a                                                               ;     4            aan       " ¥5      Ay          r    NS)                  - Su                               a
                                           ;                                a              q        A                *                   ¥      -            b                                     iF
                                            \                           -            —               oe               oF:                 :                                         =             —
                                             q               ‘                                  Ko                        Pa              .                                             coukk         ~~
                                                                                               s                                          .         »                                         4          ‘i                        E
                                           B S\             f                             Vet                           Vea                                                            /                w1-)              |||]
                                 Peo,                   "                             ee cg’      CP            ee    aX         S          Ai                                      i      a
                                           9                   ?            e      ee   e             »   Os       eo  ;       Sd se                              os       ax       )      :     :              =      International
                       Ps                   ;                                        >       iam     a                  ys       x        a                   .       a                       4                - > Coastal
                          4                                              1)                a iy           Z             ,            ,               ,             oe     ry                                  Sa       Management
                                                                      k              fe                    ve               $                         ey            =)                    —                 _cereeteiteny
           .           :                ?                         rae                                     A                f                                        P           a                           Bee Se        ae
                       .                 a               .        t          aie Y              F Fa ,                      fs                  —                    a                        ;            see
                      a                  Re.                      el      Ae                              we                                                                                               a
                            tw:                           Aa                         es                                   o
    ©          PR                   wore                                   ox                                                   oe
     '                     a bY         ie   «      mh        os                 é        oe           a*         :     a                                                       _                          —
          a                      A       ON                                   One                                         3
  a                                  Oa                                                              a                                                                                                   4                       neanens
   Sak.                       7 NE                     OCU                                              ae                                                                                      ae
                                 **        ys                       Lo                       ss             <                                                               a                                       a
      Pa               hei                   %                    OP                  Dat                Ae                                                           ’                              ~~               -           mem
                        st                .                  ut            =            rs       .     =        .                                                                      a         4         a)       SCALE An ven DATE ores 2aN
                                                                                                                                                                                                               Page 18 of 80

Section 19

Page 19 of 80

Po                                                                                                                                                                                                                           7                                                                                    |
           ra                                                                                                                                                                                                                                        Ze                                                                                          |
                                                                                                                                                                                                                                                    @.                                                                               ||         Rp,             in
        *                                                                                                                                                                                                                                                     4
Ll                                                                                                                                                                                                                                                     ao                                                                            |        ~
+                                                                                                                                                                                                                                                         QO  4                                                                                   a           =
                                                                                                                                                                                                                                                           oe                                                                                    ‘                               B
                                                                                                                                                                                                                                                                 @                                                                      ,                                        -
                                                                                                                                                                                                                                                            Av                                                                       —                                        ee
                                                                                                                                                                                                                                                            Oy                                                                                                           Pe
                                                                                                                                                                                                                                                                                      ‘                                                 Ad             Me
                                                                                                                                                                                                                                                                                     aie  <                                           «              ie   bs 4 By _”      a &
                                                                                                                                                                                                                                                                        eo                  \                                                Lime |                        as
                                                                                                                                                                                                                                                                        a                      \ 3                                   NOTES              ~       .
                                                                                                                                                                                                                                                                 sp                              \                                        All measurements are in metres,
                                                                                                                                                                                                                                                              \                                                                           Dimensions not to be scaled.
                                                                                                                                                                                                            6                                                                                       \                                     Survey by Noosa Shire Council Jan 2014
                                                                                                                                                                                                                                                                                                     \                                3.  Tidal levels taken from Queensland
                                                                                                                                                                                                                                                                                                                                          Transport Tide Tables 2014.
                                                                                                                                                                                                                                                                                                                                      4.  Containers expected to be stable in
                                                                                                                                                                                                                                                                                        O                                            ||   velocities of 1.5 - 2.0mis.
                                                                                                                                                  fA                                                                                                                                     A                                            Is. Groyne works to be entirely within Lot 131 on
                                                                                                                                                    Qe                                                                                                                                  OG                                           |    sptasai7
                                                                                                                                                     Q,                                                                                                                               \&                                             |].  Groyne 3 to be located downstream (east) of
                                                                                                                                                              Q                                                                                                                             XO                                       ||   existing stormwater pipe. Works not to
                                                                                                                                                        Za                                                                                                                               CS                                          ||   damage existing pipe.
                                                                                                                                                         ~      Oo                                                                                                                             x                                     |]?  Groynes to be constructed using 0.75m3
                                                                                                                                                           Q    ho                                                         E                                                                  ‘eS                                    ||   sand-filled geotextile containers fabricated
                                                                                                                                                                  2                                                         u                                                                       :                                |]   using ElcoMAX 1209RP (or equivalent).
                                                                                                                                                                   @                                                                                                                            ‘2      s                                 Containers to be hydraulically filed in
                                                                                                                                                                      YP                                                                                                                            Xe                                    accordance with manufacturers instructions
                                                                                                                                                              xy                                                                                                                                   “)                                |    and placed such that closures are covered
                                                                                                                                                                                                                                                                                                        eS                                and adjacent containers are well interlocked
                                                                                                                                                                                                                                                                                                                                     |]   and butted together.
                                                                                                                                                                                                                                                                                                                                      8.  Sand-flled geotextile scour mattress to be
                                                                                                                                                                        “                    \                                                                                                                  507340.3mE           |    couivatend comprising -20 independent fi
                                                                                                                                                                                      A                                                  f                                                                  \_                            fabricated using ElcoMAX 1209RP (or
                                                                                                                                                                      AA                       ne                                                                                                               7080717.4MN |             oom Fi compartments to be
                                                                                                                                                                                              :                                                                                                                                           compartments with filled dimension 7m x
                                                                                                                                                                    2                              ee                                             sc                                                                                      parallel with the groyne orientation. Mattress
                                                                                                                                                              -                                                                                   WY                                                                                      to be well-filled with sand (not mortar) using
                                                                                                                                                                                                                                              ‘                                                                                           pump/ dredge system
                                                      —                                                                                                                                              \                                                                                                                                9   Sand to be sourced from approved dredge
                                                       Qe.                                                                                                                                            \                                                                                                                                   areas (separate approval) or imported.
                                                         é                                                                                                                       ®                                                                    o
                                                          2                                                                                                                        \\                                                                “
                                                           Z@Q                                                                                                                        o                                                                     ‘                                                                                       wer      tone      oem An
                                                             ~*~   6                                                                                                                  \\)                                                                                                                                            |              MWS      078m CO   0:38 AHD
.                                                             @      2                                                                                                                      oO                                                                        >                                                                             AHD      0.42m CD 0.00m AHD
                                                                       ®                                                                                                              \“e                                                                      raw                                                                   |              Mus      —at7mcd. 025m AHO
                                                                  oD    a                                                                                                                NX                                                                                                                                          ||           LAT       0.00m CD_-0.42m AHD.
                                                                  e                                                                                                                        \%
                                                                                                                                                                                         t                                                                                                                                            LEGEND
                                                                                                                                                                                                2D,                                                                                 ‘                                                  RP Boundary                ————
                                                                                                                                                                                           \e                                                                                           *                                              MHWS / MLWS                ——_—_
                                                                                         Bs                                                                                                   \Z                            -                                                                i                                         Approved Dredge Area               a
                                                                            os          Z       rf:                                                                                                  co                                                                                                                                0.75m3 RP Container              tJ
                                                                                  Y                \                                                                                                   Cg
                                                                              -                                                                                                                         o                                                                                                                              Scour mattress             GS5ECr
                                                                       ;                              a                                                                                               \
                                                                                                        aa                                                                                                     f
                                                                                                                                                                                                             \                                                                                                                       |
                                                                                                           .                                                                                                  — §07314.0m E
                                                                                      \                                                                                                                         roman                                                                                                                 os
                                                                                         WS                                                         «                                                                                                                            g                                                    =
                                                                                          (\)                                                     s\<                                                                                                                               %                                               le}st sf alflzifis J

                                                                                                   \‘G                                                                                                                    S                                                                    &                    wey”             Y                    International
                                                                                                        Xe                                                                                           =                                                                                                                 \                                  Coastal
                                                                                                      \S                                                                                       ~              % \                                                                                                          -                              Management
                                                                                                                                                                                                    Z         ~<a                                                                                                     \
                                                                                                                ;                                                                                               iy                                                                                                                        OFFICE 50/6 Am, SYC Matra Man Beuh 4217 OLD, Ara
                                                                                                              Se \                                                                                                                                                                                                                   |]  East Foc   won gexentPo, Maroy OLD 47a
                                                                                                          .      5                                                                                                :                                                                                                                       TEErONe 517 SRO      FAL. 17 SHON?
                                                                              ~                                C                                                                                   5              ig                                                                                                                   (it saomanniniee
                                                                                \.                            Ke                                                                              Ps   4               iN                =                                                                                               [Roma
                            0                                                                                                                                                                                         ie
 i                                                                                                                 \                                                                          \      x       ¢       S                                                                                                                   NOOSA R - MUNNA POINT TRIAL
    se                                                                                }                             \                                                                          \                               .
                                                                              (                                      \                                                                          \        ,                                                                                                                            DRANG TTTE
         oe                                                                                                               907289.6m E                                                            XS                                                                                                                                         GROYNES - PLAN LAYOUT
 \                                                                                                                        7080680.1m N                                                        7       =           _/                                                                                                                 ‘earn                                 a
                                                                                                                                                                                                                                                                                                                                                   MPG-002
                                                                                                                                                                                                                                                                                                                                      PORTE          RESO TE         PRED AT
                                 ee                                     |                                                                                                                                                                                                                                                            |                 fill          oof ~4-
   0                 5                10                5                20               25m                                                                                                                                                                                                                                        |                  .               7 Arca 2076
                                                                                                                                                                                                                                                                                                                  SF                                                fonre: coree.2015 |

Section 20

Page 20 of 80

;    a YY     :
                                                                                                                                                                                              :         sa

                                                          16.5m (approx)                                                                                                                 ic        PN os ao
r                                                                                                                                                             7                           on    PRS \\
                                                                                                                                                              =                             OR ee             Vas
                                                                                                                                                              8                          NOTES                  7
                                                                                                                                                              a                         li. All measurements are in metres.
                                                                                                                                                              a                            Dimensions not to be scaled.
                                                                                                                                                                                        2. Tidal levels taken from Queensland
                                                                                                                                                                                           Transport Tide Tables 2014.
                                                                                                                                                                                        3. Survey by Noosa Shire Council Jan 2014.
                                                   -— Approved nourishment profile                                                                                                       -  ee ees pears oes

 RL +1.0m AHD             L_~14.8
            ee
             a            x           Os           \            Q                                                                               scour mattress   BAT  *oesm Ag
                                                        =>         (         é          ()                                                 5
                                                                               0          x          ()           —                   Ss.                        AHD 0.00m AHD
                                                                                            @                           ——. ———_                 8               MLWS -0.25m AHD
                                                                                                       0)                            “-         S                LAT -0.42m AHD
                                                                                                         *                                      v/
                                                                                                                                                o/
                                                                                                                                               3/
                                                                                                                                              s/

                                                                                                                                              ;            Ril -2.6m AHD
                                                                                                                                                                       N

                                                                              “ ~                                                                                                     “BA
                                                                                             .                                                                                          LEGEND

                                                                                                                                                                                        [REVISIONREGISTER—~—SCi@d REGISTER
                                                                                                                                                     — Beet HanireES                   pes = Bee aif si}
                                                                                                                                                   j                                   pepsp sepa] =]
                      |       26-30                                                                                        8m                   ZL                                      9D is
                    1 ~                     -                                             4 |                                                  /                                        PeeWee fee = |
                                                                                                                 C5)                                                                   [= [isi __= _}izafca] =]
                   eS                                                                      ©                                              ,                                            Pa [ceq fae]
                    2                                                                      3                             7—Y—Y                                 ~                        =          cam     a ee ta |
                                                  eve varies lor nah                         euecseeceneseueuseee(                                             a          as            —————_—-
                                                                                                                                                                                                    International
                                                                                                                                                                                                    Coastal
                                                                                                                                                                                                    Management
                           .              .                                                                        .                     -                                                cae     en a ae
                      Typical X-Section                                                                      Typical End X-Section                                                        EEETE orcs
                                                                                                                                                                                         FET

                                                                                                                                                                                        ARRON                 saan
                                                                                                                                                                                                 ETE       TS
      a EL ————aa—EE=                                                                                                                                                                                      s
                                                                                                                                                                                                              ieee

                                                                                                                                                                                          Page 20 of 80

Section 21

Page 21 of 80

a
                                                                                                                                                                                                                                             X          hn
                                                                                                                                                                                                                                            >
                                                                                                                                                                                                                                            EJ,      >
                                                                                                                                                                                                                                            - $        ”             ,

                                                                                                                                                                                                                                        w         Fa       < ve soa ,
                                                                                                                                                                                                                                      4           a     ae
                                                                                                                                                                                                                                           Gaz                  Ve
                                                                                                                                                                                                                                      NOTES        ——
                                                                                                                                                                                                                                        All measurements are in metres.
                                                                                                                                                                                                                                        Dimensions not to be scaled.
                                                                                                                                                                                                                                     2  Tidal levels taken from Queensland
                                                                                                                                                                                                                                        Transport Tide Tables 2014.
                                                                                                                                                                                                                                     ls. survey by Noosa Shire Council Jan 2014
                                                                   15.3m (approx)                                                                                                                                                     4. For groyne location and material
l                                                                _— Approved nourishment profile                                                                                      3                                                 specifications, see drawing MPG-002.
                                                                                                                                                                                      =
                                                                                                                                                                                      8
    RL +1.0m AHD                                                                                                                                                                      a.
                                          ~1.8             /                                                                                                                          «
 Nye          Ee                   lee                                        i             a a pg ge                            gy Sarg                 te                                .        1» ———HAT 068m AHD
       ==                                          Q                                                        eae                                                                                         9          erase
                                                       :                                                                                                                                  ee ee ee
                         ieee                          °          J                                                                                           /— Scour mattress
                                                       .              y               7                           Qf                                — /——_ - —:                               /——— + ———MLWS -0.25m AHD
                                                                       i              —               97                                            (SS
                                                                                                                                                         j                ¥
                                                                                                                      X                                  ,               o
                                                                                                                                                                       % /
                                                                                                                                                                      &

                                                                                                                                                                                      Vv
                                                                                                                                                                                                                  NSL
                                                                                                                                                                                                                                      LEGEND
                                                                                                  ~         ~

                                                                                                                                                                                                                                     a a
                                                                                                                                                                                                                                     fie fe ee ea
                                                                                                                                                                                                                                    Pe
                                                                                                                                                                                       /— scour mattress                                ES ae
                                                                                                                                                                                                                                     eS
                                   2.6- 3.0           |                                                                                                8m                          Z                                               |-—-__-..
                       '                                                                                       4F                              jaa)                                           |
                      3                                            /                                            3                                          i,              Z                     toe                                                International
                                                            level varies along length                            Cee TD                                                                                      level varies                           Coastal
                                                                                                                 |                                                                                                                                  Management
                                                                                                                                                                                                                                       OFFICE 501A SYC Manna. Men Beach 1217, 0.0, Mowat
                                                                                                                                                                                                                                        FEET F0 poe an Been ?0, Mon Boh GLD.27, use
                                                                                                                                                                                                                                        TELEPHONE 61755640561 FAK 617 SGQ09147
                                                                                                                                                                                                                                        WORST S so ccatamaregeent Sores
                                .                  .                                                                                          .                          .                                                           PRORET Was
                         Typical X-Section                                                                                             Typical End X-Section
                                                                                                                                                                                                                                      STE
                                                                                                                                                                                                                                     prommnaRs                  ae
  °         '         2         °        ‘        “m                                                                                                                                                                                 Pf wer               Pre,
                                                                                                                                                                                                                                      RAE       Ea          FRED AT
                                                                                                                                                                                                                                                                 tiene

                                                                                                                                                                                                                                               Page 21 of 80

Section 22

Page 22 of 80

Py
                                                                                                                                                                                     Sos,    ‘hen
                                                                                                                                                                                     7        >
                                                                                                                                                                               ||   ‘ =
                                                                                                                                                                                    ¥ %      ;
                                                                                                                                                                                             :         fe

                                                                                                                                                                               re        arg       Paes
                                                                                                                                                                               [notes  es          ~
                                                                                                                                                                                 All measurements are in metres.
                                                                                                                                                                               | Dimensions not to be scaled.
                                                                                                                                                                               2. Tidal levels taken from Queensland
                                                                                                                                                                               |], Transport Tide Tables 2014
                                           13m (pron                                                                                                                             Sei eg oa mig
                                                                                                                2                                                                specifications, see drawing MPG-002.
                                                 ,— Maximum Approved nourishment profile                       is
                                                /                                                               3
   RL +1.0m AHD                               j                                                                 %
   : =          = i    sa                   /
 z                      De                                         ee        eee                   _——-                     |         |)      - —— +» —HAT 068m AHD
(\        Le                                                    _——     . ——_— . ——_.              _—__.             _——— — —— / —— _ - —— MWS 0.36m AHD
            ()       ha                                                             oo              _——-             _ | |                              > —ARD 0.00m AHD
             .           (        ()          ———      Fs                                          .——_"            oe |                                       MI  -0.25m AHD
                         Cy                         SS                                               ——"                                    Sh                 LAT  ode AD
                                     (        Ma.                              Si a              =a
                                                ()        Coe                           * ee Ss                  — scour mattress
                                                      ae             {ar F                                    A.
                                                 5           >                                   . ens          /
                                                                                                os      ~      /
                                                                                 x                           /      eas
                                                                                                             /              Sas
                                                                                                                RL -2.6m AHD         i
                                                                                                                                              =
                                                                                                                                                       ss      NSL

                                                                          - ~                                                                                                            BD
                                                                                        ¥                                                                                      LEGEND

                                                                                                                                                                               |[REVISIONREGISTER
                                                                                                                                                                               Le lefii safle B |
                                                                                                                                                   /— scour mattress           jp) __=_) E492
                                                                                                                                                 J                             fefiepi) oe      | aifa ee]
                       |       26-30         |                                                                            8m                                                   2           ee
                   4                                                                        4 Pr                                                                              f= [epi     =     alli fn |
                     1                                                                       t                    C3)                    2                                       es     ce ee
                     e                                                                       S                           —                                 =                   |
                                                 level varies along length                     CYT TTY TET TT TT tT TT LT                                    LF    tevet varies           International
                     t                                 i                                     t                                                                ,          ‘
                                                                                                                                                                                          Coastal
                                                                                                                                                                                          Management
                                                                                                                                                                                 OFFICE $0 6 Am, STC Marea, an Beh 4217, GLD, sao
                                                                                                                                                                                 PORT Po tarde nvoecntro ten bean cine Aare
                                                                                                                                                                                 ee     ee     mn
                       Typical X-Section                                                                      Typical End X-Section                                            =
                                                                                                                                                                                 NG TE
                                                                                                                                                                               ee
  pe                                                                                                                                                                           [    [a        Prod
                                      |                                                                                                                                        | pramar-ec Fora  RDA
                                                                                                                                                                                                    fren er
                                                                                                                                                                               | a Ea
                                                                                                                                                                                      Page 22 of 80

Section 23

ATTACHMENT 2




 Page 23 of 80

7                                                                                                                                                                                                                                                                            Wt oratrry Bl AN
                                                                                                                                                      »   8                                                                                                                    ATTACHMENT 2
                                                                                                                                    we        ,             \                                                                                                                          y      .
                                                                                                                                                                   .                                                s                                                              Ly %           -              by
                                                                                                                         wee         ,                                                                                                  2m                                    CS                                . .
                                                                                         \                 ; oe                                                                                                                                                                 A           Pe Fs aie
                                                                                    se         \                                                                                   ;                                                                                          NOTES       ae
                                                                                                                                                                                    \                                                                                         1. All measurements are in metres.
                                                                                  7:             \                                                                                                                                                                               Dimensions not to be scaled.
                                                                         Pe                        ,                                                                                       i                                                                                  l2. Tidal levels taken from Queensland
                                                                       :                            i                                                                                                                                                                            Transport Tide Tables 2014
                                                             2                                       ;                                                                                    P Cc                                                                                   Survey by Noosa Shire Council Jan 2014.
                                                gee                                                                        “A                                                           ,      dp                                                                             4. Extent of dredge area defined as per
                                                                                                         \           pre?                                                          a                                                                                             co-ordinates below.
                                        we                                                                 \     gat                                                        ‘                                                                                                  [Point | Easting | Northing |
                                      seo                                                                   oe
                                                                                                          od)                                                      >                                                                                                          [8 | soreez_| rosea
                                                                                                       oe                                                        :
                        A                                                                        oo?           \                                                                                                                                                                 {=o} sorea2 [7080723 |
                                                                                                                 \                                     Let                                                                                                                    I5. Design dredge depth -3.0m AHD. Maximum
                                                                                                                                                     .                                                                                                                           vertical dredging tolerance to be 0.5m.
                               ‘                                                                                    Ke                      Pa                                                                                                                                6. Available volume ~30,000m?
                                \                                                                                     \         a :                                                                                                                                           17. Batters may be formed by equivalent box cut
                              at                                                                                         Ni                                                                                                                                                   \8. Previous dredging activities suggest the area
                                      :                                                                                                                                                                                                                                          is highly mobile and contains clean sand
                                       \                                                                  =f        AI                                                                                                                                             wy            suitable for nourishment.
                                            3                                                  ies                           @                                                Munna Point                                                         Yn
                                                   ;                             —                                                                                                                                                             =
                                                                                                                                                     of                                                                                       2,
                                                    *                          .                      Sy                                                  Sy                                                                               Dy                                 LEGEND
                                                       .              ie                                                                                                                                                              "Im                                     IRP Boundary          ——
                                                    as  N . gee                                                                                                                                                                                                               Proposed Dredge Area  fee    feces
                                                          D                      Ne                                                                              ver Ho
                                                           af                                                                                          Noosa River Holiday Park
                                                                    oe?                                                                                    Lot 131 SP143417
                                                                                    :                                                                                                                                                                                        fe fs fe Jey |
                                                                    ”              P                                                                                                                                                                                        fc Pe ler Pl} |
                                                                                        a                                                                                                                                                                                     P[-[                  TTT
                                                                                          .                                                                                                                                                                        man     [-[-[                    TTT]
                                                                                                                                                                                                                                                                             b= tefos ee ds |
                                    %                                                                                                                                                                                      g                                                  fef-| oo                  ie f=} «|
                                 «2                                                                                                                                                                                    s. 8
                                 2 <                                                                                                                                                                                    Zo                                                                     International
                                 35                                                                                                                                                                                     g|>
                                 as                                                                                                                                                                                     alo                                                                   Coastal
                                    a                                                                                                                                                                                      a                                                                  Management
                                   .                                                                                                                                                                                      ;                                   MHWs               EERE, 5G am 5 Mn Mane 217-00, ara
                      ee                                                                                                                                                                                                                                      MLWS               Tibor avsoos    tne   yea
                                                                                                                                                                                                                                                                                 TERETE sw crtamuragineni soe ts

                                                                                                                                                                                                                                                                              ANS TTE
                                                                                                                                                                                                                                                                              DRAWING No                     REWSION:
                                                         es                                                           X-Section A-A                                                                                                                                                           cr ial    2 ~—
                                                                                                                                     .                                                                                                                                         ——         ——              ——
    0          5          10         15         20        25m                                                                                                                                                                                                                               ail              rea
                                                                                                                                                                                                                                                                              me

                                                                                                                                                                                                                                                                                     Page 23 of 80

Section 24

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                        3 MARCH 2015


COMMUNITY SERVICES DEPARTMENT REPORTS


3                        REVIEW OF THE OPERATIONS OF THE COOROY BUTTER FACTORY
DOCUMENT INFORM AT ION




Author                           Director, Community Services, Alan (Fox) Rogers
                                 Community Services Department

Index                            ECM/Subject/Branch Management/Community Services

Attachments                      1.   Review of the Cooroy Butter Factory Arts Centre by d sipher



EXECUTIVE SUMMARY
The 2014 Galleries Service Review recommended that a further review of the Butter Factory be
undertaken in consultation with the community, to explore potential contemporary uses and
develop a more sustainable management model. Over the years, both the former Noosa Council
and Sunshine Coast Regional Council have tried different management models for this facility but
none has proven to be sustainable in the long term.

The consultation revealed that many Noosa residents view the Butter Factory as a valuable
community facility with diverse potential. It also demonstrated that the community wanted to have
greater involvement in the decision-making and operation of the facility.

A broad range of ideas and proposals were received through the consultation. The first phase of
analysis determined four of these ideas as having merit:
 U3A Noosa operating a Cooroy sub-branch and facilitating other users of the building;
 the Cooroy Lower Mill Board managing and programming the Butter Factory;
 a Centre for Ceramic Excellence being established and using the Butter Factory as a cultural
   and training hub focussed on ceramics; and
 a Biosphere Interpretation Centre being established as a tourist attraction and providing
   interpretative arts, environment and heritage exhibitions.
Detailed analysis of the community proposals determined that none of them made optimum use
of the facility and none of the proposers had the necessary resources to operate the Butter
Factory as a community facility without some Council support. Therefore after the consultation
period the Review Team undertook a final phase of analysis which considered Council retaining
management and a new hybrid community-management model.




                                                                                            Page 24 of 80

Section 25

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                     3 MARCH 2015


The options considered were:
Option                          Comment                                         Cost

Option 1 Council to hire out     Simple to manage                             2015/16: approx. $45,000
the facility as a venue and      Lowest cost option                           (depreciation            &
primarily act as bookings        May remain idle for long periods             maintenance); assumes
manager                          Does not respond to community                hire income covers other
                                   expectations     particularly    regarding   costs of approx. $36,000
                                   activation & community management
                                 Low economic and social outcomes

Option 2 Council to continue     Requires re-instatement of staff and         2015/16:          approx.
to operate and manage the          budget                                       $207,000
Butter Factory as an arts        Most expensive option
centre                           Does not respond to community
                                   expectations regarding activation and
                                   community management
                                 Moderate economic and social outcomes

Option 3 Butter Factory is a     Community managed and driven                 Approx.          $125,000
community managed facility       Greater activation of Butter Factory         (including   maintenance
with      Council   providing    Reduces       Council     financial   and    costs) in year 1 reducing
financial   support   to    a      operational burden                           to $100,000 in year 3
community organisation to        Responds to community expectations
manage and activate the          Incorporates     multiple    ideas   from
facility.                          community consultation
                                 Strong social outcomes
                                 Moderate economic outcomes


The current budget for the 2014/15 financial year is $157,385.

Taking these factors into consideration the Review Team believes that Option 3 is the most
beneficial.

After further consultation with the community groups the Review Team is recommending Council
enter into a Memorandum of Understanding with the Cooroy Lower Mill Board to operate the
Butter Factory for an initial period of three years with U3A and the Ceramic Centre of Excellence
being anchor tenants. This model allows for the continuation of arts and cultural activities at the
Butter Factory as well as the exploration of new activities and potential sources of income.

The Cooroy Lower Mill Board believes that over time it can generate enough revenue to
significantly subsidise the costs of running the Butter Factory, however it is also astute enough to
know that this will not happen overnight. In order to give the Mill Board the best chance of
success it is recommended that Council subsidise the operations of the Butter Factory by
$80,000 per annum in the first year with this subsidy gradually reducing over the subsequent two
years. It is further recommended that Council continue to maintain the building over this period.

This option is not without its risks particularly as the Cooroy Lower Mill Board has never
managed a facility before, hence the recommendation to enter into the MOU for an initial trial
period.




                                                                                           Page 25 of 80

Section 26

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  3 MARCH 2015


RECOMMENDATION
That Council note the report by the Director of Community Services to the Infrastructure &
Services Committee Meeting dated 3 March 2015 and agree to:
A.    Adopt Option 3 as its preferred option and enter into a Memorandum of Understanding
      (MOU) with the Cooroy Lower Mill Board to manage the operations of the Cooroy Butter
      Factory for an initial period of three years;
B.    Include in the MOU that U3A Noosa and the Ceramic Centre of Excellence be anchor
      tenants in the Butter Factory for this period;
C.    Consider as part of the 2015/16 budget process, the allocation of $80,000 to the Cooroy
      Lower Mill Board to allow them to meet start-up expenses and employ suitably qualified
      staff to support the operations of the Butter Factory. This amount to be reviewed annually
      thereafter with a view to the subsidy being reduced to $55,000 in the third year; and
D.    Continue to maintain the Butter Factory and Pottery Shed buildings.



REPORT
The purpose of this report is to provide Council with an overview of the review into the operations
and management of the Cooroy Butter Factory and a recommendation for a future management
model.

1.    Background

The Butter Factory at Cooroy is a local heritage building purchased by Noosa Council in the early
1990s.

Since then, the Butter Factory has fulfilled a variety of community functions as a creative hub, an
art gallery, a workshop space, an education provider, a performing arts venue and an office
space for Council’s creative and heritage staff. Groups and organisations that have used the
Butter Factory include TAFE, Permaculture Noosa, the Butter Factory Arts Inc., the Queensland
Museum Regional Development Officer and Creative Noosa.

A ceramics studio was built on the site when TAFE was based at the Butter Factory site and,
since 2004 when TAFE left the site, the studio has been utilised by local ceramic artists as a
workshop space and pottery studio.

Under the Sunshine Coast Council the Butter Factory operated as a Council-run gallery space for
local and visiting artists with an exhibition program, associated public programs and workshops
as well as being an occasional venue for performing arts and professional development
workshops for teachers in the region.

In 2010 the Cooroy Library, a state of the art facility, was built close to the Butter Factory on the
Lower Mill site further expanding the community facilities on the precinct.

The Butter Factory attracts on average 11,000 visitors annually, made up of local residents,
schools, community groups, practicing artists and interstate visitors.

Over the years, both the former Noosa Council and Sunshine Coast Regional Council have tried
different management models for this facility but none has proven to be sustainable in the long
term.




                                                                                      Page 26 of 80

Section 27

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015


2.   Review of Butter Factory Operations

In 2014, following the de-amalgamation of the Noosa Council from the Sunshine Coast Council a
service review of the operations of the Noosa Regional Gallery and the Butter Factory was
undertaken. It recommended that a further review of the operations of the Butter Factory be
undertaken in consultation with the community to explore more sustainable management models.

The Butter Factory review was undertaken in the second half of 2014 by staff of the Community
Services Department. Ellen Vasilauskas from d sipher consulting assisted in the development
and analysis of options for the management of the Butter Factory.

The objectives of the review were:
 in consultation with the community, to explore and develop options for the management of
   the Cooroy Butter Factory.
 to identify a future for the Butter Factory that is viable, has contemporary relevance, and is
   supported by the local community and users of the Butter Factory.

3.   Process

The review adopted an iterative approach, comprising five main phases:
 Stage 1: Community consultation and call for ideas (August – October 2014);
 Stage 2: Research into other community art centres and other management models used in
   similar venues (August – October 2014);
 Stage 3: Identification of lead proposals and work with community groups to refine (October
   – November 2014);
 Stage 4: Analysis of community proposals (December 2014); and
 Stage 5: Final assessment of proposals, development of options, preparation of report and
   recommendations to Council (December 2014 – February 2015)

4.   Community Feedback

The Butter Factory review involved extensive community consultation through public forums,
stakeholder meetings and over 1,500 people participating online via Your Say Noosa.

People who participated in the consultation believed that the Butter Factory needed to be
sustainable on many levels particularly having a sound financial base, wide community support
and a strong community-management model.

In terms of activities and programmes, respondents believed the Butter Factory should:
 have a significant arts and cultural orientation, including support for emerging artists;
 recognise the importance of the existing pottery facilities and users;
 complement, enhance and integrate with existing services and businesses, not compete with
    them;
 extend functions from visual arts to other community and cultural activities, such as learning,
    performances and recreational activities; and
 align with and connect to the Lower Mill precinct, the town of Cooroy and the broader Noosa
    community.

In terms of governance and support respondents believed the Butter Factory should:
 be community run and driven;
 be viable and sustainable; and
 continue to be supported by Council for operations and maintenance.
                                                                                   Page 27 of 80

Section 28

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  3 MARCH 2015


In terms of usage and access respondents believed the Butter Factory should:
 be open to the broader community, not just a select few;
 be more dynamic and have more energy; and
 aim for better levels of use, with access and opening hours extended to include evenings and
    weekends.

Respondents also identified:
 the importance of the building as part of Cooroy’s history, heritage and community;
 a number of building limitations which should be addressed in order to facilitate more
   effective and efficient use of discrete and overall areas within the Butter Factory. For
   example: poor acoustics prevent use for concurrent activities and access issues constrain co-
   location of organisations;
 opportunities to incorporate old and new ideas relevant to Cooroy and broader Noosa. For
   example: ceramics, heritage, environment, the Noosa Biosphere Reserve Accreditation,
   training and creative community-working spaces; and
 the building should be used to meet identified needs in the local area. For example: a place
   for lifelong learning and helping young people.

5.    Community Proposals

A broad range of ideas were proposed through the consultation from informal notions to detailed
submissions. The first phase of analysis determined four of these as having significant merit and
members of the Review Team assisted the groups in developing these initial concepts into
comprehensive proposals. These four proposals were:
 U3A Noosa operating a Cooroy U3A sub-branch and hiring out the facility to other users;
 the Cooroy Lower Mill Board managing and programming the Butter Factory;
 a Centre for Ceramic Excellence being established providing a cultural and training hub
   focussed on ceramics; and
 a Biosphere Interpretation Centre being established providing interpretative arts, environment
   and heritage exhibitions.
In addition to these four community proposals the review team flagged to the community that it
would also consider the option of Council retaining management of the Butter Factory
A brief summary of each of the community proposals is provided below.

U3A Noosa Proposal

Under this proposal U3A Noosa would lease the Butter Factory predominantly using it to
establish U3A activities in the hinterland. In addition, U3A would facilitate other uses of the
building by working with community organisations and hiring out spaces.
U3A is a “self-help; self- managed, lifelong learning co-operative for over fifties who are no longer
in full-time work. They provide opportunities for members to share learning experiences in a wide
range of interest groups and to pursue learning not for qualifications, but for fun.”1 Weekday
classes and weekend social activities are offered.
U3A Noosa (www.u3anoosa.org.au) – is an established organisation with approximately 720
members in Noosa. A Cooroy sub-branch of U3A would be established to run U3A programs.
This proposal would require Council to maintain, insure and provide security for the Butter
Factory building but otherwise minimal Council subsidy.




1 See www.u3anoosa.org.au



                                                                                     Page 28 of 80

Section 29

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015


Cooroy Lower Mill Board Proposal

Under this proposal the Cooroy Lower Mill Board would lease and manage the Butter Factory. It
would develop and coordinate programs and activities in partnership with other groups as well as
hiring out spaces. This would enable the visual arts and pottery aspects to continue, as well as
expand activities to incorporate a number of the ideas that have been identified in the community
consultation process.
The Cooroy Lower Mill Board is a not for profit community based organisation with a long
standing association with the Lower Mill site and strong links to the Cooroy and hinterland
community.
The Cooroy Lower Mill Board’s proposal would require Council to continue to maintain the
building and also requires an initial subsidy for start-up expenses and a project officer to
coordinate and promote activities at the Butter Factory. The Mill Board believe that in the medium
to long term (three plus years) they can reduce the subsidy requirement for the project officer.

Centre for Ceramic Excellence Proposal

This proposal sees the Butter Factory develop as a Centre for Ceramic Excellence. Current
pottery activities would be expanded to form a cultural centre focussed on ceramics. Activities
would include industry support, exhibitions, festivals, master classes and accredited training in
ceramics.
This idea has been developed by local professional practicing ceramicists and artists who have
now formed an incorporated association.
This proposal would require Council to continue to maintain the building and would require
Council subsidy to establish the Centre. To be fully realised the Centre for Ceramic Excellence
would need a partnership with a Registered Training Organisation or University and/or ongoing
government subsidy.

Biosphere Interpretation Centre Proposal

This proposal sees the Butter Factory and broader precinct being developed as an interpretative
centre for the Noosa Biosphere Reserve and becoming a major tourist attraction. It would extend
the existing arts focus by adding new technology and collection based exhibits featuring the
environment, community and indigenous and heritage culture.
This proposal was developed and put forward by a group of local residents associated with the
Noosa Museum.
This proposal would require the agreement of the new Noosa Biosphere Reserve Foundation
and significant financial support in the establishment phase to deliver the exhibition quality
necessary for a major tourist attraction.

6.    Assessment of Community Proposals

To assist with evaluating the proposals for the Butter Factory, d-sipher developed an assessment
model comprising six main areas of review:

   The concept;
   Organisation and governance;
   Resources required;
   Council policy priorities;
   Community outcomes ; and
   Comparative assessment.


                                                                                   Page 29 of 80

Section 30

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                   3 MARCH 2015


A detailed assessment of each community proposal is contained in d-sipher’s full report to
Council, refer Attachment 1. A summary of the assessment appears below.

U3A NOOSA

U3A Noosa offers a convenient solution for Council with a single tenant that proposes to use the
space regularly and will administer the Butter Factory for use by other users.

U3A is well established community organisation and has a proven ability to deliver its programs.
This proposal would extend the programs and activities U3A Noosa currently offers from its
Tewantin facility. As the U3A would not use all of the building for their programs they are
proposing to work with other community organisations to incorporate other uses and schedule
the space for other users.

Of all the proposed concepts, this is the least strategic and most administrative based program
delivery model. The proposed model of management is not a best fit with community aspirations,
as the U3A are logically focused on their members and activities, rather than the broader
community. While there is scope for use by other organisations this is likely to be more reactive
to user enquiries and not realise the same outcomes as a proactive program driven option.

There would likely be a small cost or some initial support needed in assisting the group to
promote the Butter Factory and run some of the online systems as well as some minor building
modifications to enable multiple concurrent users.

Cooroy Lower Mill Board

The Cooroy Lower Mill Board is an established presence in the Cooroy community and has a
proven record for delivering on projects such as the Cooroy Fusion Festival.

In order to animate the Butter Factory, the Cooroy Lower Mill Board proposes to significantly
extend community use and involvement in the Butter Factory through extended opening hours,
cultural programs, events and other activities. It will also have a focus on generating income
through a membership fee structure (similar to Wallace House), a user pays system for hire of
rooms with the aim of recovering costs, other measures that they are considering include a
requirement for exhibiting artist to attend their own exhibitions as has been successfully trialled in
recent months.

The Lower Mill Board proposal most closely aligns with the community aspirations for the Butter
Factory with its over-arching, inclusive, community-driven approach that is encompassing of
other groups, arts, cultural, and other potential activities.

As indicated in their proposal, they would seek funding for the development of a business plan,
the establishment of online systems, communication and programming infrastructure and
ongoing program delivery as well as some minor building modifications to enable multiple
concurrent users.

While individual board members have facility management experience, the Lower Mill Board itself
has not managed a community facility.

This model could readily accommodate a number of the other community proposals, including
the U3A and the Centre for Ceramic Excellence.




                                                                                      Page 30 of 80

Section 31

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    3 MARCH 2015


Centre for Ceramic Excellence

The Centre for Ceramic Excellence (CCE) proposal is probably the most visionary of all of the
community proposals. However, as a standalone proposal, its focus is singularly on ceramics and
on its vision for the Centre rather than a broader community use. A significant plus is that the
proposers have quickly established their not for profit status as an association as a result of the
Cooroy Butter Factory review process.

This proposal maximises use of the existing pottery facilities, aligns well with state government
policy and potential partnerships with educational institutions. It would require some financial
investment to establish its viability.

This proposal does not require immediate full use of the Butter Factory and would require a
gradual development phase therefore there is scope for it to be co-located with other
complementary users of the Butter Factory.

The CCE proposal could be accommodated in funding for the Cooroy Lower Mill Board proposal
if the project officer worked with the CCE to obtain grants to establish an initial artist in residency,
subsequent arts programs and resources to establish partnerships with educational institutions.

Interpretation Centre

This proposal has gained support from some community members and the proposers have to
their credit, quickly formed a working group. However, support of the Noosa Biosphere Reserve
Foundation organisation, has not yet been established, which is a key factor in progressing the
concept.

The costs involved in establishing an interpretation centre are likely to be significant and the
proposal requires a full business plan and feasibility study to establish its viability. The
experience of other councils with similar interpretation centres has also shown that there are
significant ongoing costs associated with managing and maintaining these centres.

Compared with other proposals, this option is less well aligned with local community values and
with community preferences for a community and arts focus for the building. Other proposals are
more strongly positioned for immediate implementation and demonstration of on the ground
programming outcomes.

7.    Final Options

Detailed analysis of the community proposals determined that none of them made optimum use
of the facility and none of the proposers had the necessary resources to operate the Butter
Factory as a community facility without some Council support. Therefore after the consultation
period the Review Team undertook a final phase of analysis which considered Council retaining
management and a new hybrid community-management model.

The options considered were:
1.    Council to hire out the facility as a venue and primarily act as bookings manager;
2.    Council to continue to operate and manage the Butter Factory as an arts centre; and
3.    The Butter Factory be established as a community managed facility with Council providing
      financial support to a community organisation to manage and activate the facility.




                                                                                        Page 31 of 80

Section 32

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  3 MARCH 2015


Option 1.      Council to hire out the facility as a venue and primarily act as a bookings
               manager
The proposal to operate the Butter Factory as a hire-only venue would see Council act as a
bookings agent for community groups or individuals seeking to hire a venue. In practice, staff at
the Library would hold the keys for the facility and take bookings. The events or exhibitions at
the site would then be managed and manned by the community. Currently, there is a
requirement for any exhibitors to “man” the exhibition for at least one day.
This model provides the least cost to Council, but arguably does not meet the expectations
expressed by residents during the consultation process. Under this model, the venue would be
closed except when being rented for an event or exhibition.
The Butter Factory is currently available for hire however there are very few bookings given the
constraints of the building and the availability of other facilities in the hinterland.
Inevitably there would be demand for the facility to be used outside of traditional working hours,
particularly on weekends. This may present security issues, otherwise the fee structure would
need to accommodate security staff or some other arrangement put in place to handle access
outside normal working hours..
The Community Services zoning may result in restrictions on commercial hiring depending on the
intended use.
Council would still be required to maintain the building. With the building being less active than at
present, there is also an attendant higher risk of vandalism and break-ins.
The Council-managed hire-only option would have a net cost of approximately $45,000 in
2015/16 as the only costs would be depreciation and building maintenance assuming that venue
hire covers other costs such as cleaning, rates and security which would be approximately
$36,000.

Option 2.      Council to continue to operate and manage the facility as an art centre

Programming of exhibitions and events would continue to be managed by Council staff with
additional support provided by volunteers. While the arts focus would continue there would be no
significant increase in community engagement or ownership. In addition, this option provides the
most cost burden to Council.

For Council to operate the Butter Factory as an arts centre commensurate with recent years
budget funding would need to be re-instated to approximately $207,000 in 2015/16. The staffing
and programming budgets were reduced considerably across the past three years from a net
cost of $264,000 in 2012/13 to $186,500 in 2013/14 and then down to $157,385 in 2014/15 in
anticipation of a transfer to a community managed model. The current budget is unsustainable as
it relies on significant cross-departmental support which is only temporary.

Option 3.      The Butter Factory be established as a community managed facility with
               Council providing financial support to a community organisation to manage
               and activate the facility.
After consultation with the parties the Review Team considered a hybrid community management
model incorporating three of the strongest community proposals and those which have the
greatest potential to be co-located and complement each other while at the same time delivering
the best community outcome.

The proposed community management model identifies the Cooroy Lower Mill Board (CLM
Board) as the facility manager, with the U3A and Ceramics Centre for Excellence as anchor
tenants.



                                                                                      Page 32 of 80

Section 33

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    3 MARCH 2015


This model has particular merits. It is a community-driven approach which is actively inclusive
and encompassing of other groups. It would allow for the continuation of arts and cultural
activities at the Butter Factory as well as the exploration of new activities and potential sources of
income. Of particular significance is the fact that this model can accommodate a number of the
other community proposed concepts as well as the U3A and the Centre for Ceramic Excellence.

The CLM Board, U3A and the CCE have each indicated in principle agreement to this approach.

If successful, this option will activate the Butter Factory, engender community stewardship and
approach long-term sustainability.

There are some risks associated with this proposed model. While individual CLM Board
members have facility management experience, the Lower Mill Board itself has not managed a
community facility and their successful relationship to other stakeholder groups and individuals
needs to be developed. In order to manage these risks, it is recommended that Council clearly
establish roles and responsibilities by way of a Memorandum of Understanding between Council
and the CLM Board. It may be that such agreements would also need to be established between
the CLM Board and its anchor tenants. Expectations and boundaries would need to be clearly
and sensitively established and effective communication developed between the groups involved.

The CLM Board have requested that Council continue to maintain the building and also provide
funding for a project officer to help activate the precinct over an initial three year period. The total
of these costs is less than if Council were to continue to manage the building as a functioning
facility.

Previous Council Consideration

Nil.

Finance & Risk

Budget History

The 2012/13 net cost to Sunshine Coast Council to operate the Butter Factory as an arts centre
was $264,000.

Following de-amalgamation, a reduction was made to staffing and programming levels and the
net cost to Council for 2013/14 was the equivalent of $186,500.

The 2014/15 recurrent budget for the Butter Factory is:

       Revenue                                                         $ 5,000
       Expenditure                                                    $162,385
         Employee Costs                                                $52,139
         Materials and Services                                        $89,643
         Depreciation                                                  $19,440
         Other Expenses                                                $ 1,164
       Net Cost to Council                                            $157,385




                                                                                        Page 33 of 80

Section 34

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  3 MARCH 2015


2015/16 Financial implications of three final options

Option 1 - Venue for Hire managed and operated by Council

      Maintenance                                                     $25,000
      Depreciation                                                    $19,440
      Total Operating Cost                                            $44,440

This assumes that venue hire covers other basic costs such as cleaning, electricity, water and
security which would be approximately $36,000. Current revenue from hiring is less than $5,000
per annum, therefore unless there is active marketing of the facility there is a risk that there will
be a shortfall in revenue and additional cost burden to Council.

Option 2 - Arts Centre managed and operated by Council

      Revenue                                                       $ 15,000
      Expenditure                                                   $222,000
        Employee Costs                                              $106,527
        Materials and Services                                       $95,000
        Depreciation                                                 $19,440
        Other Expenses                                               $ 1,033
      Net Cost to Council                                           $207,000


Option 3 - Community Facility with the Cooroy Lower Mill Board as the managing organisation

      Grant to Cooroy Lower Mill Board                               $80,000
      Maintenance                                                    $25,000
      Depreciation                                                   $19,440
      Total Operating Cost                                          $124,440



Capital Works

This current review and previous reviews have highlighted the need for building modifications to
address building constraints and increase potential uses. It is therefore recommended to
consider enhancements across the coming three years. There may be scope for a community
managed model to seek external funding to achieve this.

Consultation
External Consultation - Community & Stakeholder

Consultation and information included:
1. 27 August 2014 - a ‘launch presentation and ‘World Café’ workshop that included information
   on the objectives of the review, and opportunity for questions and contribution of ideas to
   specific questions [Approximately 110 participants ]
2. September to December 2014 - Your Say Noosa, an online discussion open to all community
   members on Council’s website guided by information and questions [Unique Visitors: 1519,
   Visits:2033, Page Views: 5219]
3. September to December 2014 meetings and workshops with the Cooroy Lower Mill Board
   (CLM Board), U3A, the Centre for Ceramic Excellence (CCE), Bruce Cresswell, and other
   interested parties to discuss their ideas and develop up these options proposed by the
   community

                                                                                      Page 34 of 80

Section 35

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                       3 MARCH 2015


4. 25 November 2014 - a public meeting and presentation by council officers on the consultation
   process, an overview of ideas received, options being considered, and the review
   assessment model. [Approximately 50 participants ]
5. November 2014 – January 2015 – stakeholder meetings with Cooroy Lower Mill Board, U3A
   Noosa and the Centre for Ceramic Excellence to workshop proposed hybrid model

Internal Consultation

Alan Rogers Director Community Services*
Kerri Contini Manager Libraries and Galleries
Ellen Vailiauskas d-sipher

Other internal consultation
Cr Tony Wellington
Gallery Director
Community Development Officer, Arts and Culture

* Note: The Director, Community Services has advised the CEO pursuant to Council’s Code of Conduct
that while his partner is a ceramic artist, she has had no involvement in the development of the Centre for
Ceramic Excellence proposal.

Departments/Sections Consulted:

X   Community Services                                 Planning & Infrastructure
    Disaster Management & Public Order                 Building & Plumbing Services
    Waste & Environmental Health                       DA Planning
    Community Facilities                               Strategic Land Use Planning
X   Cultural Facilities                                Asset Design & Investigations
                                                       Asset Planning
                                                       Civil Operations
                                                       Environment

    Executive Office                                   Corporate Services
    Community Engagement                               Finance
    Customer Service                                   ICT
    Executive Support                                  Procurement & Fleet
    Governance                                         Property & Facilities
    Human Resources                                    Revenue Services




                                                                                           Page 35 of 80

Section 36

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015


                                                     ATTACHMENT 1




                                                      Page 36 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA    3 MARCH 2015
                                                      ATTACHMENT 1

        Review of the Cooroy
        Butter Factory Arts Centre
        Report
        Prepared for Noosa Council
        by d-sipher
        27 January 2015

                                     Ti       \
                       ss =       . ~                 “~
                  Os ee                2
          BalCsMiae

             sioner

                                                        Page 36 of 80

Section 37

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 37 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                3 MARCH 2015

                                                                  Report prepared by:
                                                                  Ellen Vasiliauskas
                                                                  Director, d-sipher
                                                                  email: [email protected]
                                                                  ph:    07 5471 1330
                                                                  postal: PO Box 168 Noosa Heads
                                                                         Queensland 4567
                    d'sioher                                      vee
                              D                                   Member of:
                              the energy within                   - Australian Market and Social Research Society
                                                                  and
                                                                  - Australasian Evaluation Society.

                                                                                                    Page 37 of 80

Section 38

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 38 of 80

=
                                                                                                                        7
                                                                                                                        Bs)
                                                                                                    =|                  bs
                                            S  §                         m          9           > 6D        ee          =
                                           3 (8                          D                      5  ow                   U
                                           Ba      PO               ye   p          a           2 OF         g          2
                                               &   @ §                   5   OR O =>    DH BD                =
                                      Pra      &   23S4VRFYNE RB       AG    s@se       2@®§ ®o    oO                  9°
                                      72S      SC  SBPoOZ 0023%72            S288            s =    7                   a
                                      moo      9   58228298 8 3 2            3533       2328        0                  cS
                                       S556:   8   @8        +    2    =o    — ® E 3            <   6
                                      S2Zi     a2s2Fassezage >               3336       22e8        2                   m
                                      ori      ¥   PeezrSSeSavEF FRFRB                  R2QeE F                         0
                                      rPi      §   SRERSFeosee® gaat FoR:                           B                  wn
                                       >i   i  3  88S FO         <oue 2 SB2aw           2B ZF:      Sj                 mm
                                      Pit      32  3@BhR Sm® 2565      ® §   2       es fo § }      a                   m
                                      di:      @®  § & a     92? 58 &>-      @89On8     : oh:                           2
                                      O :   :  ;   ££ e   35 5 m Ag © GQ          56    ? $i:   :                       5
                                      Si    i  ft  @eeer nea es an          peak        ET FE:                         fA
                                      Sii      ft  @o @aReVasa           8   3 §& =o    ? i  3  }                       m
                                      Sppop        @ae:      &§2Se23 $24"%38 FEE:
                                      Si    i  i:  :0ufi     @RAKR BD B      o2<02      : ff    }                       O
                                      Ai:      :   ? g8iiprpeatg ees         oo      8S : :  f  }                       O
                                      ne       :   Poi    i  S@e RSPR        BOER       Fi:
                                      s  $s $s €   §    > '  6 = oO 4:         = @ ©    : :  : 3:                       =
                                      PoP   PoP    fb &@ i Pb ®e  SRSi:r     zgea w     FEE:                            =
                                      fof   Fld   UE   EE    le      PR it   SOmpv      : ft ti                         =
                                      iio b    fb  POE    Pi   222:       bE as 8:      £ EE
                                      ii ob oP     be:biid:P® er ii          Fa AE      EE:     i                       5
                                      if    bo oP  PS:       i @ et    it    @:   Fi   EF EE    i            .         =|
                                      jt    te¢¢eii          f    ©:   i: fi mi   mi    : :  ii              i          m
                                      2  $  to of  : Bibi      Bridi:i       &@ boi     :ii:i                a
                                      $$: $    ¢        ; $  $ Big  fF § $   oF   Be    F  fF F SE           3
                                      Pid ob       bP BRidi    Biidid:       i    gi    Pi: &                           =
                                      i  foi o£    £ ME   EE   oi   d  $$    Bi   Bi    EE   Et              g          =
                                      i of  fb ob  Goi  i EP i Qi   i  $ bo mi    S i o£  Ed    i            :          m
                                      i  fob oP oP   bo bE   EP S bo bobo io @ ba:      fb EE:               $          m
                                      iti:        ¢€ £  ft dtdta@t:itt       g@twoet   ¢€ ¢: tt              a          4
                                      tf    £ ef  ¢€ $  £ ¢  € 8  $s FO st itsStiaet    «i ¢: tif            9          >
                                      i obo    od oP bobo:   iPod: bi  bib  2:    ei    : i bi               2         rs
                                      i  bob oP    Po PoP Pop  bP bP:  bE    pri 2: ob    ib                3
                                      i  bof ob od   bo fb Eb EP EP boi bP io ob iE Pi ob i  bi              S          >
                                      ii:      ¢:  ¢ 6: td id: éi::dst tt i¢éi:ddt i¢@ ¢:tit                 2          @
                                      i obo Go ob  Go bob bob  EP ob i bod ob  dp bE ob   Ed:                a
                                      Peet     £   Pi   b bib  babi      db  £biabd     baba                 a          m
                                      i obo ob oP ob ob EP EP EP EP PEE bE ob  Eb ob Eb ob boi               q          S
                                      i obo bod ob oP   EP PE  PE   EP Eb E ob iE boi ob  boi                6
                                      i  fob oP od obo bob   EP   bo dP dob o£ E dP io ob Ei                 3
                                      i  fob ob od ob   bE   Eb   bod: bo Eb o£ EP  bo o£ EE                 3
                                      Pre      fF  Eid    db   badd    db oP   bad ad   ET   Ed              f
                                      Pry      fF  Tid    db   badd    bb oP   baad     Eb  ad              §           oo
                                      PRE      §   ERLELELELEE               PEEP       EEE                  8          S
                                      MMR      th         Bo           it           '                       a
S                                     PER      DBRPSRKRKREEE ©wD             DWYNMDD    Vues                 =          >
°                                                                                                                       Oo
‘                                                                                                                       =
ioe]
e                                                                                                                       8
s                                                                                                                       o
©                                                                                                                       —_
So

Section 39

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 39 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               3 MARCH 2015

        4 | Review of the Cooroy Butter Factory Arts Centre Report                            signer

        Review overview

        Introduction
        The Cooroy Butter Factory Arts Centre (CBFAC) is a well-loved historical and iconic site in the
        district. With the recent redevelopment of the nearby sites by Council of a major library
        resource as well as the Lower Mill site, Council considered it timely to address options for the
        Cooroy Butter Factory Arts Centre.
        Noosa Council commissioned independent        market research and evaluation      consultants
        d-sipher, to undertake a review of the CBFAC in conjunction with Council.
        The review included identifying, scoping and assessing options for the CBFAC and took into
        consideration and evaluated the Butter Factory history, identification and analysis of potential
        operating models and assessed the financial viability and sustainability of the options
        proposed by the community. The options were developed in consultation with residents, local
        artists, businesses and community organisations. This report has been prepared by d-sipher.

        Background of the Butter Factory
        The Butter Factory at Cooroy is a local heritage building purchased by Noosa Council in the
        early 1990s for community use.
        Since then, the Butter Factory has fulfilled a variety of functions in the community such as a
        creative hub, an art gallery, a workshop space, an education provider, a performing arts venue
        and an office space for council’s creative and heritage staff.
        Groups and organisations that have used the Butter Factory include TAFE, Permaculture
        Noosa, the Butter Factory Arts Inc., the Queensland Museum Regional Development Officer
        and Creative Noosa.
        A ceramics studio was built on the site when TAFE was based at the Butter Factory site and
        since 2004 when TAFE left the site, the studio has been utilised by local ceramic artists as a
        workshop space and pottery studio.
        Under the Sunshine Coast Council the Butter Factory operated as a council-run gallery space
        for local and visiting artists with an exhibition program, associated public programs and
        workshops as well as being an occasional venue for performing arts and professional
        development workshops for teachers in the region.
        In 2010 the Cooroy Library, a state of the art facility, was built close to the Butter Factory on
        the Lower Mill site further expanding the community facilities on the precinct.
        The Butter Factory attracts on average 11,000 visitors annually, made up of local supporters,
        schools, elderly groups, practicing artists and interstate visitors.
        There is strong community ownership of the Centre. There are existing groups using the
        Centre as well as good support from local volunteers.

        Review objectives
            e  In consultation with the community, to identify, explore and develop options for the
               Cooroy Butter Factory Arts Centre.
            e  To identify a future for the Butter Factory that has contemporary relevance, is viable
               and is supported by communities of interest to the Butter Factory.

                                                                                                   Page 39 of 80

Section 40

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 40 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                            3 MARCH 2015

       Asoher                                     Review of the Cooroy Butter Factory Arts Centre Report | 5

      Summary of approach
      The overall approach to the review included a research, community consultation and
      evaluation. The review adopted an iterative approach, comprising five main phases:
          e  Stage 1: Community Consultation and Identification of Options (August — December
             2014)
          e  Stage 2: Desk research into what other communities in similar arts-related situations
             were doing successfully and how this was being achieved (August — October 2014)
          e  Stage 3: Selection and analysis of community proposals (October — November 2014)
          e  Stage 4: Assessment of proposals, preparation of report and development of paper and
              recommendations to council (December 2014 — January 2015) — Community Services
              project team in discussion with d-sipher.

      Review method
      Council  specified that the   review consider   and  evaluate the   Butter Factory history,
      identification and analysis of potential operating models and consult with residents, local
      artists, businesses, and community organisations.
      Overall, over 150 community members and stakeholders contributed to the consultations. The
      method included:
          1.  Design of a community consultation and engagement method supported by a
             communication strategy and a risk assessment of potential sensitivities (council with
              d-sipher input). Communications included media coverage in local newspapers and the
              direct email distribution of invitations and information to community members on
             council’s mailing lists.
          2.  Desk research —of community arts centres and other models used in similar venues
             and communities and research into additional ideas for the future of the CBFAC (d-
             sipher and council).
          3. Community consultation and identification of initial options (council with d-sipher
              input). Consultation and information included:
                 a.  27th August - a ‘launch presentation and ‘World Café’ workshop that included
                     information on the objectives of the review, and opportunity for questions and
                     contribution of ideas to specific questions
                 b.  September to November - Your Say Noosa, an online discussion open to all
                     community members on Council’s website guided by information and questions
                 c.  meetings with the Mill Board and local Cooroy community members
                 d.  September to December meetings and workshops and with U3A, Noosa
                     Museum, the Cooroy Lower Mill Board (CLM Board) and the Centre for Ceramic
                     Excellence (CCE) proposers to further develop up these options proposed by
                     the community
                 e.  25 November - a public meeting and presentation by council of the process so
                     far, an overview of ideas received, the lead concepts being considered, the
                     review assessment model.

          4. Analysis of all community input and desk research (council with d-sipher input)
          5. Development of a model for assessing CBFAC options - based on a synthesis of the
              literature, evaluation models and community feedback (d-sipher)
          6. Refining options to a small number to develop and investigate in further detail
          7. Development of options — meetings and workshops were held with some of the
              proponents (d-sipher and Council officers)
          8. Reporting to Council.

                                                                                                Page 40 of 80

Section 41

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 41 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               3 MARCH 2015

        6 | Review of the Cooroy Butter Factory Arts Centre Report                            sinner

        Overall community feedback and values

        The following section summarises the key themes of community feedback identified as a result
        of the consultations undertaken by council in the community workshop, meetings and the
        online discussion forum and written proposals from the community. Further detailed verbatim
        community comments are available from council.
        The community responded with a keen interest to participate in the consultations (more than
        200 individuals and groups participated in the consultations) and the opportunity to propose
        options for Council’s consideration. Most importantly, the community acknowledged and
        responded positively to Council’s initiative to review the CBFAC governance, activities, and
        programs and to provide an opportunity to contribute to possible opportunities.
        As a result of the CBFAC consultation process, a reliable list of values priorities and drivers for
        the Butter Factory was developed, as well as an outline of the basic principles the community
        would like to see adopted by Council and the CBFAC with regard to the CBFAC’s:
               Role and function, preferred governance and support, range of users, usage and
               accessibility, and opportunities that may need to be addressed in future planning and
               development.

        Community and Council's Values for the Butter Factory
        Synthesising community and Council input, the core draft values for the CBFAC can be
        summarised as:
           ¢   acommunity run and driven facility
           e   part of Cooroy’s history, heritage and community
           e   alignment with and connected to Cooroy and Noosa community
           e   having a significant arts and cultural focus and orientation
           e   contemporary relevance (identified by Council)
           e   viable (identified by Council)
           ¢   supported by communities of interest to the Butter Factory (identified by Council).

        Additional aspirational values for the CBFAC included:
           e   Creative Hub strongly aimed at sustainable/viable employment
           e   Contemporary Arts - emerging, cutting edge.

                                                                                                   Page 41 of 80

Section 42

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 42 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               3 MARCH 2015

    Aspher                                      Review of the Cooroy Butter Factory Arts Centre Report | 7

    Key themes and community opinions
    Key principles - Role and function:
        *  Animportant community asset - part of Cooroy’s history, heritage and community
        *  Key role in building social capital
        *  Strong support for maintaining a visual arts focus
        *  Support for maintaining a cultural role and supporting emerging artists
        *  Needs to be sustainable on many levels — e.g. sound financial base, wide community
           support, strong management model.

    Key principles - Activities and programs
        *  Recognition of the importance of the existing pottery facilities and users
        ¢  Activities should complement, enhance and integrate with existing services and
           businesses, not compete
        *  Needs to be dynamic and have more energy
        *  Support for extending functions from visual arts to other community and cultural
           needs and activities, such as learning, music performances, lunches, and recreational
           activities.

    Key principles - Governance and support:
        *  Should be community run and driven
        *  Governance needs to be sustainable, and for some proposers, financial support from
           Council and/or other sources is a requirement
        *  Council needs to continue to maintain the building.

    Key principles — Users, usage and accessibility
        *  Open to the broader community, not just a select few
        ¢  Needs to be better used, with access and opening hours extended to include evenings
           and weekends.

    Opportunities identified that may need to be addressed in future planning and development
        *  Some building limitations need to be dealt with in order to facilitate more effective
           and efficient use of discrete and overall areas within the CBFAC. For example: poor
           acoustics for some activities when there are concurrent users and access to bathrooms
           and kitchen from other areas
        *  There is an opportunity to incorporate old and new ideas relevant to Cooroy and
           broader Noosa e.g. ceramics, heritage, biosphere, broader creative industries (such as
           creative community-working spaces)
        *  As appropriate, the building should be used to meet the needs identified in the local
           area e.g. helping young people, a place for life-long learning.

                                                                                                   Page 42 of 80

Section 43

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 43 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                             3 MARCH 2015

      8 | Review of the Cooroy Butter Factory Arts Centre Report                          sioner

      Community concepts proposed for the Butter Factory
      As part of the community consultation process, community members and groups were invited
      to submit written proposals for council’s consideration. Council particularly encouraged
      submissions from community groups that may be interested in managing the CBFAC. Council’s
      preference was to hand-over management of the CBFAC to the community.
      Overall, 17 proposals were received from individuals and community groups, ranging from
      notional ideas through to full proposals. Support was provided to a couple of proponents to
      develop their concept in more detail.
      The proposals can be grouped into six broad themes, many of which overlap or have common
      threads of arts and exhibitions, culture, and community use. Further detail on the proposals is
      shown in Appendix A and Appendix B.
      ARTS, CREATIVE SPACE, EXHIBITIONS:
          1.  Noosa Community Raft
          2. Creative Hub
          3. Art Space
          4. Artist in Residence Visual Arts and Music Program
          5. Centre of Arts Excellence
          6. Centre for Ceramic Excellence
          7. Grandpa’s Shed
      ARTS AND CULTURE:
          8. Community Managed Space
          9. Cultural Centre
      CULTURAL, INTERPRETIVE AND HISTORICAL:
          10. Interpretation Centre
          11. Entrepreneurial Centre
          12. Aboriginal Cultural Centre
          13. Butter Factory Events and Visitor Space
          14. Family Research Centre
      LEARNING and RECREATION:
          15. U3A Cooroy Sub-branch
      OTHER IDEAS:
          1. Creative Co-working Space
          2. Social Enterprise Facility
      From these 17 proposals, council and d-sipher identified five lead concepts that merited
      further exploration and development. These concepts were selected on the basis of the level
      of community support from the proposer, the proposed governance arrangements and that
      there was at least some alignment with the CBFAC and the values identified in community
      consultations. These five lead concepts are:
          1.  Managed by one Tenant - U3A Noosa
          2. Community Managed Model — Cooroy Lower Mill Board
          3.  Interpretation Centre
          4. Centre for Ceramic Excellence
          5. Council Managed Model.

                                                                                                 Page 43 of 80

Section 44

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 44 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                       3 MARCH 2015

         sicher                                        Review of the Cooroy Butter Factory Arts Centre Report | 9

       Assessment of the five lead concepts

       To assist with evaluating the five proposed lead concepts for the CBFAC, d-sipher developed a
       review assessment model based on a synthesis of existing models, the literature, evaluation
       logic models and community feedback. The assessment model was refined with Council and
       comprises six main areas of review, as shown in the diagram on the following page:
               1. The concept
               2. Organisation and governance
               3. Resources required
               4. Council policy priorities
               5. Outcomes
               6. Comparative assessment.
       Figure1: Cooroy Butter Factory Review Assessment Model
               1. The Concept             3. Resources required
         Description of concept, vision or Resource Stream — e.g. volunteers | (To be developed later)
         outcome and the proposer/s,   \     5                        Short term    Mid term    Long term
         SWOT analysis                  Income streamn— ee: Brent,    Group/s are set u         Group/s
                    :                  workshop revenue, rental income.  Pi        Pp
                                                                      to manage the BF          manage the BF
                =e                     Existing BF facility — e.g. how well supported by        with minimal
        2. Organisation & Governance   Bienen facility meet the proposal’s Council.             support from
                                       requirements?                                            Council.
                    Orne               Council Budget & Staff Resources — Venue and Venue and   Programs /
                     ay                e.g. funds for building maintenance, programs are: programs are activities are
                                       support from staff.             *contemporary viable.    financially
           Stee               Lo                                       relevant                     i
              im             hi                              =                                  sustainable.
                      t  .   ‘!        Council Capital Works Budget e.g. «supported by              Hl
                                       funds for building modifications to    a
                \          f                t long term financial viability com Dieles cr
                     :                 SUPPLE                   i      interest.
                   Sol       co
                                        4. Council policy priorities         6. Comparative assessment
                                        How does this concept align   How does this concept compare with other
                                        with Council priorities?      concepts proposed?

       The review assessment model

       1. The Concept
       A description of the proposal, who is driving it, the vision or intended overall outcome and
       Who is this for and who will benefit? What is the interest and demand for this concept? How
       will the community benefit? How sustainable and financially feasible is this?

       2. Organisation and Governance
       This section looks at the strengths and weaknesses of the community group or the proposers
       using the ‘7S Framework’ developed by McKinsey Consultants.               The 7S applies a simple
       checklist framework to assess structure, strategy, systems, skills, style, people/staff and
       shared values. It provides a focus for thinking across all elements that need to be considered
       now or in the future in regard to a group that may be involved with the CBFAC. The basic
       assumption is that each area is dependent on the other and each area is important and all

                                                                                                           Page 44 of 80

Section 45

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 45 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               3 MARCH 2015

     10 | Review of the Cooroy Butter Factory Arts Centre Report                          sioner

     need to work together. In the case of the CBFAC, the 7S are applied with consideration of the
     sustainability of the group proposing the option:
            Shared Values — these are central to the development of all other elements in the
            framework. Overall, what are the overriding goals important to this group, the
            community and to those participating in the CBFAC? What are the factors that will
            unite everyone in achieving long term successful outcomes for the CBFAC? These
            values or goals generally do not change over time.
            Skills — community group and staff skills. What skills do the community group have?
            What skills are missing? Are specialist skills needed to support the achievement of the
            overall outcomes for the CBFAC?
            Systems — the systems needed to be in place to ensure success of the proposal. What
            IT, HR or risk management processes (including insurances) need to be in place? Who
            and how will these be managed? How will work be monitored and managed — e.g.
            customer /community/participant management systems.
            Structure and Governance — What are the governance arrangements for this group?
            Are they sound? Who is involved? Are there champions? How will the relationship
            work between the community group/organisation and Council and other organisations
            involved? Who makes the decision and in what situation? Who is responsible and
            accountable? How will Council cultural policy be implemented? Does this structure
            allow application to grant or funding bodies?
            People and Staff — Who are the people involved, their talents, interests and qualities?
            What happens if a key individual or volunteer leaves? Is there diversity to give
            strength? What capacity building or support might be needed?
            Strategy — What is the concept or the activity trying to do and how? What does the
            concept add to the area? Is there competition or duplication? How does the CBFAC
            need to evolve and develop over time?
            Style — Culture and the way things are undertaken in the group. These are the informal
            rules of conduct. They tend to reflect the individuals and the leadership or champions
            involved. These can also be the characteristics that cause the group or the CBFAC to
            reject outsiders. What blind spots do we need to be aware of?

     3. Resources required
     Inputs identify what needs to be in place to make this CBFAC option work. This may include
     identifying:
         e  the Resource stream - e.g. volunteers available to support the proposal
         e  the Revenue stream - e.g. grants, workshop revenue, rental income from an ongoing
            tenant
         e  the adequacy of the existing CBFAC facility — e.g. how well does the facility meet the
            proposal’s requirements? What modifications may be required?
         ¢  Council budget and staff resources — e.g. Council funds for building maintenance,
            support from Council staff.
         e  Council capital works budget — e.g. funds for building modifications to support long
            term financial viability.

                                                                                                   Page 45 of 80

Section 46

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 46 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               3 MARCH 2015

       Osher                                      Review of the Cooroy Butter Factory Arts Centre Report | 11

      4. Council policy priorities
      Where relevant, how does this proposal align with Council policy and, where relevant, to
      government policy priorities?

      5. Outcomes
      In general, the overall outcomes expected to be achieved by this concept would be developed
      at a later stage. Intended short, medium and long term outcomes, including financial
      sustainability may be flagged.

      6. Comparative assessment
      Finally, what is the comparative assessment of this proposal? How does this option compare
      with the other proposed options? What are the pros and cons?

      Summary of proposals and assessment
      The following section summarises the key points in each of the five lead concepts submitted in
      written proposals to Council. These are included in Appendix B as attachments to this report,
      with the exception of the Council Managed Model, which should be generally viewed as
      maintaining the status quo. Each proposal provides significant additional detail that should be
      reviewed in assessing the merits of each proposal.

       1. Managed by One Tenant - U3A Noosa

      *   Concept: U3A, leases the Butter Factory predominantly using it for its own activities.
          When not using it for its own purposes other groups are allowed to use the space.
      *   U3A is part of a “self-help; self- managed, lifelong learning co-operatives for over fifties
          who are no longer in full-time work. They provide opportunities for members to share
          learning experiences in a wide range of interest groups and to pursue learning not for
          qualifications, but for fun.”’ Weekday classes and weekend social activities are offered.
      ¢   Driver:  U3A   Noosa                            -  is an  established   organisation  with
          approximately 500 members in Noosa. It proposes to use the CBFAC to establish a Cooroy
          sub-branch to run U3A programs. It would facilitate existing activities at the CBFAC and
          allow other group’s to use the building outside of its own class times. See also U3A
          proposal for more detail.
      ¢   This proposal would require Council to maintain the building, and some start-up funding,
          but no ongoing Council support.

      2. Community Managed Model - Lower Mill Board

      *   Concept: A community organisation leases and manages the Butter Factory and programs
          activities in partnership with other groups. This would enable the visual arts and pottery
          aspects to continue, as well as expand activities to incorporate a number of the ideas
          which have come through community consultation.

      * See www.u3anoosa.org.au

                                                                                                   Page 46 of 80

Section 47

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 47 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               3 MARCH 2015

     12 | Review of the Cooroy Butter Factory Arts Centre Report                          @sipner

     ¢   Driver: The Lower Mill Board — is an incorporated community based organisation, with a
         long history of involvement in the site and in the area.
     ¢   This proposal would require Council to maintain the building and would require some
         ongoing Council support.

     3. Centre for Ceramic Excellence

     *   Concept: A Centre for Ceramic Excellence (CCE) would be established using the pottery
         and parts of the Butter Factory. Current pottery activities would be expanded to form a
         cultural hub focussed on ceramics. Activities would include industry support, exhibitions,
         festivals, master classes and accredited training in ceramics.
     ¢   Driver: Centre for Ceramic Excellence Association and professional practicing local artists,
         Rowley Drysdale, Vit Martinek and Sue Coburn. This would require financial support for its
         establishment and to be fully realised, potentially partnerships with Registered Training
         Organisation/s.

     4. Interpretation Centre

     *   Concept: The Butter Factory and the broader precinct would become an interpretative
         centre for the Biosphere. It would extend the existing arts components by adding new
         segments of nature, indigenous and heritage tourism through technology and collection
         based exhibits.
     *   Driver: Noosa Museum- put forward by Committee members. This concept requires the
         agreement of the new Biosphere organisation and additional financial support to drive it.

     5. Council Managed Model

     *   Concept: The Butter Factory would be operated by Council and would continue as a
         cultural exhibition and activity space.
     *   Driver: Council would continue to manage and program the Butter Factory, ideally with
         greater community involvement.

                                                                                                   Page 47 of 80

Section 48

Page 48 of 80

@sprer                                                                                                     Review of the Cooroy Butter Factory Arts Centre Report | 13

                                                                                                                                               COUNCIL
                                              - Cooroy Lower Mill Board
                                                                                                                                               MODEL

 Council Budget   Funding and supportlikely — Full-time staff equivalent funds    Part-time staff in establishment  Requesting $25,000 for     Retain full-
                  to be required to           allocated to CLM Board to engage _ phase in role of project manager,  preparation of a business __ time staff.
                  communicate new             contractors / consultant to        program coordinator, retail        plan.
                  management model, U3A       undertake establishment and        manager, grant writer,
                  as tenant, new              ongoing day to day management      community liaison, conference
                  programming format and      of area supported by Board and     organisation assistance.           Additional funds: Not
                  ongoing information for     volunteers as well as website                                         specified at this stage.
                  CBFAC users and             development, and related
                  community members.          computer support.

 Estimated        $20,000                     $80,000                             Included in the Community         $25,000 (first year)       Net cost to
 budget                                                                           Managed Model                                                Council
 required:                                                                                                                                     $144,299
 Council Capital © Minor works to reduce      Minor works to reduce noise         Minor works to reduce noise       Not presently identified.  Potentially
 Works Budget     noise transference          transference between areas to      transference between areas to                                 none if status
                  between areas toimprove | improve multiple use of areas.       improve multiple use of areas.                                quo
                  multiple use of areas.                                                                                                       maintained.
 Resource /       Minimal income from ad      Some income from ad hoc and        Grants, crowd funding of artist    Minimal income from        Minimal
 Income           hoc activities andrental of scheduled program, activities and  spaces, small income retail sales, admission fee and rental   income from
 Streams          space to others.            rental of space to others, arts    conference fees.                   of space to others.        existing
                                              grants.                                                                                          programs.

                                                                                                                                                        Page 48 of 80

Section 49

Page 49 of 80

14 | Review of the Cooroy Butter Factory Arts Centre Report                                                                                          @sipter

                                                                                                                                                  COUNCIL
                                               - Cooroy Lower Mill Board
                                                                                                                                                  MODEL

 SHARED            = Average alignment with     = Strong alignment across all       = Strong alignment across all      = Average alignment with   General
 VALUES              the identified values for   identified values for the CBFAC.    identified values for the CBFAC.   the identified values for alignment
                     the CBFAC.                 * Well networked and have                                               the CBFAC. Willingness _ with identified
                   * Extension of activities to  established relationships with                                         to accommodate area       __values for the
                     include learning,           local community across groups                                          for ceramics and          CBFAC.
                     recreational and social     and businesses.                                                        woodwork.                 However,
                    activities.                                                                                                                   does not
                                                                                                                                                  address
                                                                                                                                                  aspirational
                                                                                                                                                  values and
                                                                                                                                                  community
                                                                                                                                                  interest in
                                                                                                                                                  expansion of
                                                                                                                                                  opening
                                                                                                                                                  hours,
                                                                                                                                                  increased use
                                                                                                                                                  and extension
                                                                                                                                                  to other types
                                                                                                                                                  of use.
 SKILLS            = Demonstrable skills in     = Proven experience in              ® Significant intellectual pool of * Business professionals
                     existing program delivery   successfully running a not for      professional practicing ceramic    and local residents
                     and governance.            profit.                              artists locally.                   groups. Arts community
                                                " Proven experience in                                                   members need to be
                                                 successfully running local events                                      engaged.
                                                 e.g. underwritten and managed
                                                 Cooroy Fusion Festival.

                                                                                                                                                               Page 49 of 80

Section 50

Page 50 of 80

i) aE                                                                                          Review of the Cooroy Sutter Factory Arts Centre Report || 13

                                                                                                                                OOUNCIL
                                          COMMUNITY MANAGED MODEL                       -                         -
                    TENANT -                                            Centre            Excellence = interpretation Centre    MANAGED
                ONE           USA        - Cooroy Lower Mill Board             for Ceramic                                     MODEL
SYSTEMS         Funds retained inseparate © Some systems in place, but will Systems to be developed.    Systems to be developed. | Systems
                account.                 require systems to be developed                                                       already in
                                         ho manage programs, establish                                                          place.
                                         website etc.
STRUCTURE        = Well established       = Well established organisation = Committee formed and        « No formal group in    No formal
 AND              organisation with        with constitution and           aasociation status recently   place.                 community
GOVERNANCE        constitution and         governance arrangements in     achieved.                     * Driven by interested  involvernent.
                  —overnance =             place.                        =o proven projects or            individuals.
                 arrangements in place.   * Additional committees/interest achievements as a group.     «= No proven projects or
                  vuccesstully hance 3     groups tobe establishedtobe =» Group in its forming phase.    achievements as a
                   secs ly  tune           mnvoived in Programming,      * Additional community          group.
                            .                                              members need tobeengaged.   § = Requires agreement of
                 = New executive to be    * Role would be to contribute to                                Biosphere organisation
                  ae een COOEN-           the development of policy,                                    which has been
                      ne                   Program and operating                                          identified as a key
                  elect the new executive. ac    il representative able to                              7 Committe. Structure
                 * Council representative  attend meetings at any time                                   proposed of indivicluals
                  able to attend meetings | and/or review records.                                       and local residents and
                  at any time and/or                                                                     ratepayers groups that
                  review records.                                                                        have expressed an
                                                                                                          interest.

                                                                                                                                   Page 50 of 80

Section 51

Page 51 of 80

16 | Review of the Cooroy Butter Factory Arts Centre Report                                                                                           @sipner

                                                                                                                                                   COUNCIL
                   ONE TENANT - U3A                           eee                   Centre for Ceramic Excellence       Interpretation Centre       MANAGED
                                                - Cooroy Lower Mill Board
                                                                                                                                                    MODEL
 STAFF AND         * Overall, well established  = Well established, experienced      = Passionate and experienced       * People with a passion     Permanent
 PEOPLE              and experienced group.       and diverse board members with      professional artists.              for heritage, museums     and contract
                     Skills in programming        business skills. Would benefit     ® Requires staff with specific skills and culture.             staff involved.
                     arts and cultural areas      from additional representation      to assist with development.       * Support for establishing
                     unknown/limited.             of artists on board.                Skills required include             a committee involving
                   * Able to provide            * Limited time available for a        conference organisation,            local residents groups,
                     volunteer reception staff    hands on role.                      community group                     indigenous individuals
                     and training.              * Able to organise volunteers.        management, grant writing,          and others.
                                                * Require staff with specific skills  arts Programming and     ..
                                                  to assist in establishment and      organisation, marketing, liaison.
                                                  ongoing management.
                                                * Funding required for:
                                                  - development of a business plan
                                                  - a building assessment to
                                                  determine possibilities for CBFAC
                                                  (unless this is able to be
                                                  determined with Council’s
                                                  assistance)
                                                  - legal advice — to deal with
                                                  issues as required and to ensure
                                                  any engagement of staff or
                                                  contractors is undertaken
                                                  appropriately
                                                  - ongoing programming and
                                                  management of regular CBFAC
                                                  programs, activities and event.

                                                                                                                                                                                10

Section 52

Page 52 of 80

@sipher                                                                                                      Review of the Cooroy Butter Factory Arts Centre Report | 17

                                                                                                                                                 COUNCIL
                  ONE TENANT - U3A             Combai Meee MODEL                   Centre for Ceramic Excellence      Interpretation Centre      MANAGED
                                               - Cooroy Lower Mill Board
                                                                                                                                                 MODEL
 STRATEGY          " Leverage off existing                             .    .      * Vision: To establish a local,    " Business plan to be
                                   .           Concept has a broad and inclusive        .        .       .
                    U3A membership base.       focus                                 national and internationally       developed.
                    New members pay                 ,                                acclaimed Centre for Ceramic     « Strategy relies on:
                    annual membership fee      CLM Board would:                      Excellence based on successful     - government funding
                    ($50).                     1. oversee policy formulation and     models in locations nationally     - significant tourism
                   * Direct e-                 direction, staff oversight, broad     and internationally. Centre is in  visitor numbers, which
                    communications,            venue management, promotion           community of Cooroy, with          are not demonstrable
                    bulletins and website to   —_and financial security of the facility cultural relevance to region,   for the area
                    members.                   2. verify financial models available  state and nationally as a          - paid admission fees by
                   « U3A would build on        from study of similar venues and      cultural destination.              visitors.
                    existing program of        implement aspects that can be       = Aimed at emerging and
                    classes and activities and | adapted to CBFAC structure and      practicing artists who are mid-
                    focus on needs of          broad based community demand.         career, TAFE graduates, degree
                    Cooroy over 50's.          This modelling must encompass         and masters level local, national
                    ie Beesdes                 affordability for users and           and international participants.
                    saikeholdersandnesds       reasonable return on asset value.   " Main objectives: a cultural hub
                    of other groups /          3. with input from the BFAC           focused on all ceramic forms,
                    audiences would be         Committee, prepare media              through offering activities and
                    ateacted and weluded (     (website, social media, print, radio  programs and learning and
                    oneieam                    and TV) to be used to expand          education.
                        i        i             sWaiPRiessie? BEAC abu It           " Uses established ceramics
                   ® Unlikely to drive and     programs                                         iat     s
                    facilitate non-U3A         4. Besureopening hoursare             community in Sunshine Coast.
                    activities.                conducive to public interest and      Focused Gn Bernice.
                                               arendance                           = Potential relevance to state and
                                               5. ensure presentation of facility to nation.
                                               take maximum advantage of           = Requires partnership with
                                               exhibits, classes etc.                government and in part with an
                                                                                     educational institution.

                                                                                                                                                               Page 52 of 80

Section 53

Page 53 of 80

18 | Review of the Cooroy Butter Factory Arts Centre Report                                                                                        @sipher

                                                                                                                                                COUNCIL
                  ONE TENANT - U3A             eae                                Centre for Ceramic Excellence      Interpretation Centre      MANAGED
                                               - Cooroy Lower Mill Board                                                                        MODEL
 STYLE             " Hierarchical style.       = Collective decision making style  = Group recently formed.
                   " May have a more fixed,      within group.                     * Participants are strongly
                    conservative culture.      = Culture established and            networked with local
                                                 maintained through managed         community, artists and TAFE. As
                                                 cyclical turnover of board         experienced professionals seek
                                                 members.                           to work cooperatively with all
                                               = Generally cautious and             other groups.
                                                 reflective.
                                               = Focused on financial income and
                                                 viability, that may be unrealistic
                                                 in the arts and cultural sector.
                                               .

 Short term (12    " Facility being used by    Develop business plan, review      Establish CCE facilities and        ® Business plan           Status quo
 months)            U3A members, pottery       previous program of events and     stakeholder and community            developed.               maintained
                    users and other ad hoc     exhibitions, formalise working     relationships; apply for grants and = Likely to require Council
                    users.                     relationship with Council, existing crowdfunding, initial workshops     to continue conducting
                   « Systems established.      and new groups, apply for relevant funded by RADF and / or artist in    existing programs.
                                               grants, establish stakeholder and  residence grant.
                                               community relationships, prepare
                                               an initial program, gain community
                                               interest and support, extend use
                                               of CBFAC to other groups, prepare
                                               marketing and communications
                                               plan (including website and social
                                               media).

                                                                                                                                                                            BO

Section 54

Page 54 of 80

@sorer                                                                                                      Review of the Cooroy Butter Factory Arts Centre Report | 19

                                                                                                                                                 COUNCIL
                                               COMMUNITY MANAGED MODEL                              .                            .
                  ONE TENANT - U3A                                                Centre for Ceramic Excellence      Interpretation Centre       MANAGED
                                               - Cooroy Lower Mill Board
                                                                                                                                                 MODEL

Mid-term          Facility being used by U3A_—_— Review and evaluation of          " 2017 Australian Woodfire          wee:         .            Status quo
 (three years)                                              .               .                       .                Initial interpretive           oe
       y          members and expanded to      outcomes, adjustment as required.    Conference as milestone event.   elements established        maintained
                  include other users.         Indicators of success include       = TAFE courses conducted,                              ,
                                               increased community use of /         visiting artists, workshops and
                                               CBFAC and extension of opening       expansion of use of studio by
                                               hours to include weekends.           interested potters.
                                               Economic and social benefits to          .              .
                                                                         :         = Review and evaluation of
                                               Cooroy and Noosa community.                       .
                                                                                    outcomes, adjustment as
                                                                                    required. Indications of success
                                                                                    as a cultural tourism
                                                                                    destination.
                                                                                   " Economic and social benefits to
                                                                                    Cooroy and Noosa community.
 Long term (five  —Ajternative trust structure | Agreed percentage of economic     Proportion of activities achieve  Unknown.                    Status quo
 years)           established to take over     sustainability with support from   economic sustainability.                                       maintained
                  management of CBFAC for      Council.
                  the community.

                                                                                                                                                                Page 54 of 80

Section 55

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 55 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                            3 MARCH 2015

 20 | Review of the Cooroy Butter Factory Arts Centre Report                        @sipter

 Comparative assessment of proposed concepts
 The following section is a comparative assessment of each of the five lead concepts.

 One Tenant - U3A
 U3A offers the easiest, most convenient solution for Council: one ongoing tenant that
 proposes to use the space regularly and will administer the CBFAC for use by other users ona
 user pays based system. The U3A is well established and has a proven ability to deliver its
 programs. There would likely be a small cost or some support needed in assisting the group to
 promote the CBFAC and run some of the online systems.
 Of all the proposed concepts, this is the least strategic and most administrative based program
 delivery model. The model of management is not a best fit, as the U3A are focused on their
 priorities and their members, which are aged over fifty and no longer working full-time.
 Although offering the facility to schedule the space for other users, users will need to actively
 pursue and investigate using the space.

 Community Managed Model - Cooroy Lower Mill Board (recommended)
 The community managed model is the recommended model. It has particular merits over the
 other proposals in its over-arching, inclusive, community-driven approach that is actively
 inclusive and encompassing of other groups, arts, cultural, and other potential activities. The
 CLM Board is an established community group presence in the Cooroy community and has a
 proven record for delivering on projects.
 As indicated in the CLM Board’s proposal, funding would be required for the development of a
 business plan, the establishment of online systems, communication and programming
 infrastructure and ongoing program delivery and minor building modifications to enable
 multiple concurrent users. The CLM Board’s grounded and pragmatic approach, focused on
 generating income (e.g. through a membership fee structure), a user pays system, on cost
 recovery and on financial sustainability is complemented by a strategy to significantly extend
 community use and involvement in the CBFAC through extended opening hours, cultural
 programs, events and other activities. Some of this may need to be balanced within Council’s
 policy guidelines and be tempered with the limitations of income generation in arts and
 cultural programming and exhibitions.
 This model could accommodate three of the other community proposed concepts, including
 the U3A, the Centre for Ceramic Excellence and possibly the Interpretation Centre (if this
 were feasible in a downsized, volunteer-driven model). The CLM Board, U3A and the CCE
 have indicated in principle agreement to be included in this approach.
 Council has identified risks associated with multiple independent community group users. In
 order to manage these risks, it is recommended that Council clearly establish roles and
 responsibilities, governance, partnership or Memorandum of Understandings between each
 group and with Council. Expectations and boundaries would need to be clearly and sensitively
 established and a mode of communication between groups developed and agreed across
 parties and routinely monitored.

                                                                                                Page 55 of 80

Section 56

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 56 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                            3 MARCH 2015

    sicher                                        Review of the Cooroy Butter Factory Arts Centre Report | 21

 Centre for Ceramic Excellence
 The CCE proposal is probably the most visionary of all of the community proposals. However,
 as a stand-alone proposal, its focus is singular on ceramics and on its vision for the Centre.
 The proposers have quickly established their not for profit status as an association as a result
 of the CBFAC review process.
 Nonetheless, it maximises use of the existing pottery facilities, aligns well with state
 government policy and potential partnerships with educational institutions and would merit
 some financial investment to establish its viability.
 The CCE proposal could be accommodated in funding for the Community Managed Model to
 obtain grants to establish an initial artist in residency, subsequent arts programs and
 resources to establish partnerships with educational institutions.

 Interpretation Centre
 This proposal has gained support from some community members and the proposers have to
 their credit, quickly formed a working group. However, support of the Biosphere organisation,
 has not yet been established, which is a key factor in progressing the Centre.
 The costs involved with an interpretation centre are likely to be significant. The experience of
 other councils with similar interpretation centres has shown that there are significant ongoing
 costs associated with managing and maintaining these centres.
 Compared with other proposals, this option is less well aligned with local community values
 and with community preferences for an arts focus for the CBFAC. Other proposals, such as the
 community managed model and the one tenant U3A model are more strongly positioned for
 immediate implementation and demonstration of on the ground programming outcomes.

 Council Managed Model
 Existing costs of staffing would need to continue. Assuming the limitations of the current
 financial climate for Council, no additional initiatives would be introduced to the CBFAC and
 programming would reflect the status quo.
 The Council managed model has significant limitations in meeting community needs for
 extended hours and activities due to the staffing costs involved.
 Additional investment of staff resources is likely to be required if greater community
 involvement in the CBFAC is a priority.
 Other options better meet community aspirations and expectations and are likely to be more
 sustainable.

                                                                                                Page 56 of 80

Section 57

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page
                                                       Page57
                                                            57ofof80
                                                                   80

22 | Review of the Cooroy Butter Factory Arts Centre Report                                                                                                             @sipher

 Preliminary Program Model
           .     =

The following table shows a                             program delivery model of drafted                                     based on the many suggestions
 made         by     the       community               and       the       proposals            received.            Activities,           events,          area        used       and
 potential           income           sources           are       identified            based         on      community                feedback             or     past       CBFAC
 programs.
                                                                    COOROY BUTTER FACTORY AREA

                                                                                                                          2.00pm            volunteers
 Various programmes, including:
 arts, crafts, languages, cards, USA                                                                                      -F, various times Willing to offer programmes to a
                             http://www.u3anoosa.                                ¥                 v                 v                      broader range of community
  james, yoga, music and arts org.au/site/                                                                                - see website     members
 appreciation, coach trips etc. e.

 Games /Mah Jong / Cards /

                                                                                                                          M-F 9.00am -                                     Cover kiln firing

           ae                 Centre for Ceramic

       ,                 .    Centre for Ceramic

 Artist studio space for hire, Several different                                                            v             7 days             ae senee ements may conflict  an      ea
                                                                                                                                                 requi                       ul
 cottage industry model      Proposals                                                                                                      with exhibition areas.         funded

                              Cooroy Potters Group
 Pottery classes and workshops & other individual                                                                    Y=   Weekly            In operation                   Small income
                              potters
 Pottery workshops and        Centre for Ceramic

     classes and workshops -                                                                                              w      /  school
 painting, jewellery making,                                                                                v             vee! School       To be developed                Small income
 acrylics, glass etc                                                                                                         lay:
 Children's and holiday arts  Individual artists,                                                                         Weekly / school

                                                                                                                                                                           Small income from

      a       .               Centre for Ceramic                                                                                                                           Small income from

 Of locally owned collections         ,

                                                                                                                                                                           Small income from

                                                                                                                                            Cooroy used to be known for the
 Furniture exhibitions                                                                                      v             Annual / Bi-annual fine furniture exhibition which Small income from
                                                                                                                              “        .    moved as a result of management sales commission
                                                                                                                                            turmoil
                                                                                                                                            Could be a combined event held
      t                                                                                                                                     periodically or held separately Small income from
 ca      f Laurel                                                                                           v             Annual / Brannual from Woodies with a different  sales commission
                                                                                                                                            emphasis on wood working
                                                                                                                                            Extra space compared with
                                                                                                                                                                           sales commission
                                                                                                                                            interesting
Horacutre therapy    06% Ce Cathanued—_¥                                                                                 Te                 Sarwar
                                                                                                                                              ll         -com/|         -

 Business networking drinks                           v       v        v                                    v             Quarterly                                        Yes
                                                                                                                                            Including use of parking lot.
 Cooroy Long Lunch                                            v                                                          TBA                Catered by local eateries with —_Yes
                                                                                                                                            their own serveries.

                                                                                                                                                                           sales commission

   istralian Woodfire and

                                                                                                                                            Suggested by Margaret from

                                                                                                                                                                     Page 57 of 80

Section 58

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 58 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                            3 MARCH 2015

     @sipner                                        Review of the Cooroy Butter Factory Arts Centre Report | 23

     Conclusion and Summary

     In conclusion, the community consultation and CBFAC review process has successfully engaged
     the interest of the local community in the future of the CBFAC. The community responded
     enthusiastically to the opportunity offered by Council and expressed interest in seeing
     increased community use made of the CBFAC in terms of access, programs, activities and
     events that aligned with arts and cultural related areas.
     Overall, 17 proposals were received from the community, most of which were arts and cultural
     related. The review identified five lead proposals as meriting further investigation and
     assessment using a customised review assessment model developed by d-sipher with Council.

     RECOMMENDATION
     As a result of this review, a hybrid of the community managed model proposed by the
     Cooroy Lower Mill Board is recommended as the optimal model that has contemporary
     relevance, is viable and is supported by communities of interest to the Butter Factory. This
     model will meet community expectations as identified in the consultations, will significantly
     enhance the current level of programming and use of the CBFAC.

     The hybrid community managed model comprises:
        e   the CLM Board responsible for managing the direction, overview and broader ongoing
            arts, community and cultural programs and activities at the Butter Factory and
            supporting the establishment of the Centre for Ceramic Excellence
        e   two key anchor tenants: U3A and the Centre for Ceramic Excellence.

     While this model will require Council to continue to maintain the building and provide an
     ongoing operational subsidy for a minimum of three years, these costs will be less than if
     Council were to continue to manage the building and programs itself. Furthermore, there is
     the potential to reduce these costs over time.

     RECOMMENDATION
     It is recommended that Council:
     1. Continue negotiations with the Cooroy Lower Mill Board, U3A and the Centre for Ceramic
     Excellence to develop a Memorandum of Understanding with all three parties with regard to
     the management and future use of the Butter Factory with the aim of having these
     arrangements in place by July 1 2015.
     2. Communicate the outcomes of this decision and the next steps as a result of this review to
     the broader community and to those community members and groups who generously
     contributed their time and effort to this review.

                                                                                                Page 58 of 80

Section 59

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 59 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                             3 MARCH 2015

     24 | Review of the Cooroy Butter Factory Arts Centre Report                           iver

     Appendices

            APPENDIX A
            Future of the Cooroy Butter Factory List of Submissions

            APPENDIX B - ATTACHMENTS

                1. U3A Proposal

                2. Cooroy Lower Mill Board Cooroy Butter Factory Proposal

                3. Centre for Ceramic Excellence Proposal

                4. Interpretation Centre Proposal

                                                                                                 Page 59 of 80

Section 60

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 60 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                                      3 MARCH 2015

          sioner                                                   Review of the Cooroy Butter Factory Arts Centre Report | 25

                        Future of the Cooroy Butter Factory List of Submissions

      ARTS, CREATIVE SPACE, EXHIBITION THEMED PROPOSALS
       Noosa Community         Beany Palmer       Using a cottage industry model, the Butter Factory becomes a hub for working
     Raft                                         artisans which has a commercial side to sell merchandise, an educational side
                                                  to inform and educate artists and other community members and provides an
                                                  industry base for artists and associated businesses to connect with each
                                                  other.
                                                  Similar example: Jam Factory in Adelaide[http://www.jamfactory.com.au/|
      Creative Hub             Anne Yang          Offer individual artists/crafters studio spaces from which each can
                                                  work/demonstrate/display and sell work and a public gallery space. It could
                                                  function as a commercial artist-run collective gallery run, staffed by the
                                                  artists.
                                                  Similar example: Makers’ Workshop in Burnie, Tasmania

      Art Space                Annie Wallis       Continue to be an exhibition space with commissions used to assist in
                                                  managing the centre and a place for artists to work and connect with each
                                                  other.
      Artist in Residence      Wendy McGrath,     An artist-in-residence visual arts and music program, to operate in
      Visual Arts and Music    Kathleen Hunt,     collaboration with existing organisations. Professional artists in a variety of
       Program                 Louise King        disciplines would be offered a place to live and work and engage with the
                                                  community on a short-term basis, The Butter Factory would also be used as a
                                                  base for some arts organisations.
      Centre of Arts           Gerhard Herbst     Evolve from its current use into a Centre of Arts Excellence. Similar example:
       Excellence                                 Sturt: Centre for Australian contemporary craft and design in Mittagong, NSW
                                                 (Bean stare nsw.eduaul]
      Centre for Ceramic       Rowley             Establish a local, national and internationally acclaimed Cooroy Butter Factory
       Excellence              Drysdale, Vit      Centre for Ceramic Excellence which would incorporate exhibitions, retail
                              Martinek            sales, workshops and accredited training. Similar examples: Jam Factory and
                                                  Sturt as per above.
      Grandpa’s Shed           Tony Slattery      Extend the exhibition aspect of the Butter Factory to include diverse
                                                  collections held by private owners, often older people in the community.
                                                  Incorporate programming and learning aspects to the exhibitions such as
                                                  passing on skills and expertise to younger people eg Grandpa’s teaching
                                                  Grandkids.

      ARTS AND CULTURAL THEMED PROPOSALS
      Community Managed        The Cooroy         Develop the CBFAC as a vibrant community hub where the Cooroy, Noosa and
      Space                    Lower Mill Board   Sunshine Coast community come together to celebrate, learn, develop
                                                  networks, collaborate and practice arts, cultural and other activities through
                                                  events, activities, workshops and gatherings.
      Cultural Centre          Karen Gosling      Extend the exhibition aspect to include diverse range of events including live
                                                  music, forums, workshops, dancing, classes, cooking demonstrations/lessons
                                                  partnering with the Noosa Jazz festival, the Noosa Food and Wine festival as
                                                  well as the Noosa Long Weekend or potentially a boutique brewery venue
                                                  showcasing local food and entertainment.

                                                                                                                          Page 60 of 80

Section 61

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                      Page 61 of 80

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                                     3 MARCH 2015

      26 | Review of the Cooroy Butter Factory Arts Centre Report                                                sioner

      Concept Title           Submitted By       Summary

      CULTURAL, INTERPRETIVE AND HISTORICAL THEMED PROPOSALS
      Interpretation Centre   Bruce Cresswell,   An Interpretation Centre using the historic Cooroy Butter Factory sitting at the
                              Jeanette           geographical centre of the Noosa Community Biosphere. It would extend the
                             Alfredson           existing arts components by adding new segments of nature, indigenous and
                                                 heritage tourism through technology and collection based exhibits.
      Entrepreneurial         David McCready     Anentrepreneurial centre for young people to support them in start-up
      Centre                                     ventures.
      Aboriginal Cultural     David McCready     An Aboriginal cultural centre showcasing and celebrating the local Aboriginal
      Centre                                     people.
      Butter Factory Events   Ray Kelly          Extend the exhibition aspect of the Butter Factory to incorporate other
      & Visitor Space                            cultural aspects and capitalise on the Pottery. Develop a retail and visitor
                                                 information space to increase revenue.
      Family Research         Cooroy-Noosa       The Butter Factory would become the new home for the Cooroy-Noosa
      Centre                  Genealogical &     Genealogical & Historical Research Group, housing their collections, providing
                             Historical          research facilities and creating public exhibitions and displays.
                              Research Group
      LEARNING and RECREATION THEMED PROPOSALS

      U3A Cooroy Sub-         U3A Noosa          Establish a sub-branch of U3A Noosa within the Butter Factory, offering
      branch                                     classes and activities. It could incorporate existing Butter Factory activities.

      OTHER PROPOSALS
      Creative Co-working     Tim Nixon          A creative co-work space for the Hinterland region where you can rent a space :
      Space                                      (often just a desk) for a flexible amount of time, from hours to months... It’s
                                                 all about the ‘co-working’, about facilitating communication, interaction and
                                                 collaboration.
      Social Enterprise       Andrew South
      Facility

                                                                                                                         Page 61 of 80

Section 62

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                          3 MARCH 2015


Community Facilities
4                        NOOSA AQUATIC CENTRE (NAC) - HALF YEARLY REPORT TO 31 DECEMBER 2014
DOCUMENT INFORM AT ION




Author                             Noosa Aquatic Centre Coordinator, Stephen James
                                   Community Services

Index                              ECM/ Subject/ 51.04 Sporting Facilities

Attachments                        Nil.


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Noosa Aquatic Centre Coordinator to the Infrastructure &
Services Committee Meeting dated 3 March 2015 providing an update on the activities of the
Noosa Aquatic Centre (NAC) to 31 December 2014.

REPORT
The purpose of this report is to advise Councillors of the Noosa Aquatic Centre’s (NAC) activities
for the half year ending 31 December 2014.

The NAC comprises a 50m Olympic Pool, 25m Pool, Warm Down Pool/ Learn to Swim Pool,
Toddlers Wading Pool, Fitness Studio, Change Rooms and Amenities operation. The
maintenance of the Sunshine Beach Skate Park is also overseen by the NAC.

The NAC provides a broad range of aquatic and leisure programs e.g. recreational swimming,
learn to swim (LTS) programs, elite squad training, aqua aerobics, and water polo.

1.                       Finance

The objective of all services within the Community Facilities Branch is to balance the demands of
access, equity and community service obligations with sound financial management, and
improving revenue through innovative and entrepreneurial approaches, whilst minimising
operational costs.

                                                    NAC Half Year 2014/15
                                                                                Variance    Budget Full
                                                    Actual YTD    Budget YTD     (YTD)        Year
       Total Revenue                                  $791,507       $782,589      $8,918    $1,546,236
       Total Expenditure                              $807,302       $857,916     $50,614    $1,723,819
       Net Operating Surplus/Deficit                   -$15,795      -$75,327     $59,532     -$177,583
       Depreciation                                     $81,551       $81,551          $0      $163,101
       Internal Charges                               $165,133       $165,133          $0      $330,266
       Total Surplus/Deficit                         -$262,479      -$322,011     $59,532     -$670,950




                                                                                             Page 62 of 80

Section 63

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015



                           NAC Half Year 2014/15
 $1,000,000

  $800,000

  $600,000

                                                                              Actual YTD
  $400,000
                                                                              Budget YTD

  $200,000

        $0
                Total Revenue      Total Expenditure     Net Operating
  -$200,000                                              Surplus/Deficit


The NAC’s half yearly performance sees sound results across the board. Assisting the half yearly
result were favourable weather conditions during this quarter. Revenue is $8,918 in front of a
challenging budget target with expenses $50,614 under predictions. The NAC’s net operating
result is $59,532 in front of year to date expectations.

The variance in expenditure is mainly attributed to the building and facility maintenance budget
being underspent by approximately $30,000, however this is expected to align more closely to
the budget at the completion of the financial year. The reason for this is that, where possible,
major maintenance is conducted during Quarters 1 and 4 which are outside of the peak customer
usage periods.

Improvements in profiling maintenance expenditure are part of the development process for the
2015/16 budget and will ensure greater accuracy for future reporting.

The General Operations area (general swimming admissions, pool hire, etc.) is $11,464 behind
the revenue budget. The half yearly result has improved for this area, however it continues to be
impacted by the quieter than expected start to the financial year (as highlighted in the Quarter 1
report).

Program Operations have returned revenue exceeding budget by $21,371. Numbers in the
NAC’s Swim Squads have expanded by nearly 20% and numbers in the Learn to Swim program
have increased to 1,049.

The Gym has a current membership of 198 which is the highest number at the completion of the
calendar year since we began operating in 2008. This increase has seen revenue exceed budget
by $13,340 however the need to update ageing equipment remains. A review of the operation of
the Gym remains ongoing and will be the subject of a separate report.

Group Fitness remains steady with revenue on track year to date. Attendance numbers for the
half year are 5,597 which are on par with the previous period.




                                                                                   Page 63 of 80

Section 64

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                 3 MARCH 2015


Retail Operations continue to perform very well with the net result $11,707 in front of predictions.
The biggest improvement has been seen in purchasing, with actual Cost of Goods Sold (COGS)
year to date approximately $10,000 under the budgeted amount of $48,014. The introduction of a
popular new product line of Speedo has been well received and provides lower COGS
percentage. Staff have also focused on having less stock on hand which equates to much
improved expense levels.

2.                 Customers

The NAC has seen 121,706 attendances for the half year. Quarter 2 attendance equate to
79,019 compared to 74,344 in the same period 2013/14. This increase of 4,675 visits is
predominately an increase in program operations most notably the Swim Squad, Gym and Learn
to Swim areas.


                               Half Yearly Attendance Comparison
                   80000
                   70000
                   60000
     Attendances




                   50000
                   40000
                   30000
                   20000
                   10000
                       0
                                          Q1                              Q2
                   2013/14               43984                           74344
                   2014/15               42687                           79019


The NAC has limited capacity during most weekday afternoons. While lanes are open to the
public, these are generally limited to one or two during the peak times of 3.30pm – 6pm.

3.                 Staffing

Staff numbers will remain at current levels until the completion of School Term 1 when they will
drop substantially as patrons move onto winter pastimes and maintenance of the 25 metre pool is
undertaken.

As part of the development of the 2015/16 budget, management will assess the current mix of
casual and permanent staff within the existing NAC structure, particularly where there are long
term casuals. Consideration will be given to the feasibility of converting a small number of key
positions from casual to permanent, where a business need can be identified.

4.                 Systems & Processes

The automatic payment system for the Learn to Swim program is now in its fourth month.
Unfortunately, systems errors resulted in a number of incorrect amounts being debited during the
December payment run. All affected customers were notified and the system error has been
rectified through the software vendor.

Night swim squads have been introduced on a Tuesday and Thursday in an effort to alleviate
some pressure on the availability of water space during the daytime.


                                                                                     Page 64 of 80

Section 65

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                3 MARCH 2015


5.       Future Direction

The review of the NAC gym operation is ongoing and will be the subject of a separate report to
Council.

Capital Works – A Brick N Pave product trial was completed in the Sunshine Beach Skate Park.
Whilst this has been a marked improvement on the trial patch laid over the existing surface, it is
doubtful that this will be an economical long term remedy for the aging concrete.

A section of wall tiles of the 25 metre pool have separated from the concrete shell. This will
require emptying of the 25 metre pool and retiling of the section of the wall. The extent of the
damage will not be known until the pool is emptied and inspected. This project was proposed for
the 2015/16 Capital Works Program and may need to be brought forward.

Previous Council Consideration

Nil.

Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Management Accountant, Corporate Services


Departments/Sections Consulted:

X      Community Services                         Planning & Infrastructure
       Disaster Management & Public Order         Building & Plumbing Services
       Waste & Environmental Health               DA Planning
X      Community Facilities                       Strategic Land Use Planning
       Cultural Facilities                        Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

       Executive Office                       X   Corporate Services
       Community Engagement                   X   Finance
       Customer Service                           ICT
       Executive Support                          Procurement & Fleet
       Governance                                 Property & Facilities
       Human Resources                            Revenue Services




                                                                                   Page 65 of 80

Section 66

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                3 MARCH 2015


5    NOOSA LEISURE CENTRE (NLC) - HALF YEARLY REPORT TO 31 DECEMBER 2014
Author            Noosa Leisure Centre Coordinator, Cathy Simon
                  Community Services

Index             ECM/ Subject/ 51.04 Sporting Facilities

Attachments       NIL


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Noosa Leisure Centre Coordinator to the Infrastructure &
Services Committee Meeting dated 3 March 2015 providing an update on the activities of the
Noosa Leisure Centre (NLC) to 31 December 2014.


REPORT
The purpose of this report is to advise Councillors of the Noosa Leisure Centre’s (NLC) activities
for the half year ending 31 December 2014.

The NLC caters for Badminton, Futsal (Indoor Soccer), Netball, Basketball, Volleyball, Jump
Bunch (children’s gymnastics), Group Fitness classes, Indoor Rock Climbing, corporate training
inclusive of Council programs and school sessions, special events and venue hire. Meeting and
conference rooms are available for meetings/training, TAFE classes, etc. The indoor rock
climbing and yoga classes are managed by separate entities.

1.   Finance

The objective of all services within the Community Facilities Branch is to balance the demands of
access, equity and community service obligations with sound financial management, and
improving revenue through innovative and entrepreneurial approaches, whilst minimising
operational costs.

                                   NLC Half Year 2014/15
                                                                     Variance        Budget
                                     Actual YTD  Budget YTD           (YTD)         Full Year
 Total Revenue                          $213,494    $230,917           -$17,423      $474,013
 Total Expenditure                      $337,015    $376,401            $39,386      $747,404
 Net Operating Surplus/Deficit         -$123,521   -$145,484            $21,963     -$273,391
 Depreciation                            $72,643     $72,643                 $0      $145,286
 Internal Charges                        $73,079     $72,638              -$441      $145,276
 Total Surplus/Deficit                 -$269,243   -$290,765            $21,522     -$563,953




                                                                                   Page 66 of 80

Section 67

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015



                                    NLC Half Year 2014/15
     $500,000

     $400,000

     $300,000

     $200,000                                                                         Actual YTD

     $100,000                                                                         Budget YTD

          $0
                    Total Revenue       Total Expenditure      Net Operating
 ($100,000)                                                    Surplus/Deficit

 ($200,000)


Half yearly performance sees the NLC net operating position $21,963 in front of year to date
projections. Actual revenue is $17,423 behind budget projections however expenditure is also
$38,945 behind projections.

Revenue:

The NLC has four revenue streams:

    program operations;
    group fitness program;
    café/retail operations; and
    general operations.

Revenue shortfalls are predominately seen in the group fitness and jump bunch program
($37,000), however this is offset by an increase in venue hire bookings (general operations) and
the centre run volleyball and netball programs ($20,000).

A marketing strategy for jump bunch was implemented in the second quarter, which is expected
to increase revenue in the third quarter.

Group fitness revenue continues to be monitored as a result of the change in the business model
for the delivery of Yoga classes. As part of the change, NLC contributes an amount per person
each time pre-existing NLC membership holders attend yoga classes. The impact of this will
continue to decrease as customer memberships and visit passes expire. A true reflection of the
full group fitness program will be clearer throughout the next half of the financial year.

Expenditure:

Total expenditure is $38,945 behind the year to date budget for the half year. This is
predominantly due to underspend in building and facility maintenance which could not occur in
Quarter 2 as a result of venue hire bookings and availability of contractors. Several areas of
maintenance expenditure have been committed for the next six months, including:

 Annual stadium floor resurfacing (which would normally occur late December);
 The centre’s tiered seating units, which were serviced in this quarter require further work to
   ensure health and safety compliance. Work on the units will be completed in February 2015;


                                                                                  Page 67 of 80

Section 68

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015


 Basketball structures in and outside of the centre also require assessing and servicing –
   which have been scheduled for early 2015;
 Professional cleaning of the tiled floor areas (after in-house cleaning/gurney has proved non-
   effective); and
 Sandblasting stadium louvres/framing to remove potentially dangerous surfacing.

2.                  Customers

There have been approximately 18,930 recorded visits to the Centre for this quarter,
approximately 37,199 for the half year. Increased attendance has been noted in group fitness
classes, netball and volleyball while there’s been a slight decrease in badminton. The second
quarter is usually a quieter period for NLC attendances due to the Christmas holiday period and
term programs and school bookings winding down in late November - early December.

Unavailability of The J (due to other events) and
Bicentennial Community Centre (due to Noosa
Gymnastics Club move) resulted in a major
booking for NLC in December while the centre
was closed for normal business operations.
Hillsong Church utilised a number of spaces
within the centre for their Christmas services.
Approximately 1,400 people attended and the
versatility of the centre was demonstrated in
preparation for upcoming major events in 2015.




                                              Facility Usage
                    4000
                    3500
                    3000
     Hours Booked




                    2500
                    2000                                                                    2013
                    1500                                                                    2014
                    1000
                     500
                       0
                                1st Quarter                    2nd Quarter


Facility occupancy steadily increased again in the second quarter, is up by 6% compared to the
last quarter, and considerably higher than the same period last year. This is due to an increase
in bookings by various groups including Noosa District Basketball, local schools, first aid course
providers and Noosa Yoga who have a long term hire agreement of two rooms in the centre.




                                                                                   Page 68 of 80

Section 69

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                 3 MARCH 2015


3.     Staffing

Staff training for essential CPR and First Aid qualifications was completed this quarter for the
majority of staff.

Recruiting for an extra casual café assistant will be undertaken in January, due to three café staff
members taking long service leave in the next six months and extra bookings secured on
Sundays from 2015.

4.     Systems & Processes

The NLC Coordinator is working with the Health & Safety Advisor to update the centre’s
emergency evacuation plans.

Various equipment from the Bicentennial Community Centre has been re-located to the NLC,
including Noosa Table Tennis tables and equipment in preparation for the group to begin their
regular bookings at the NLC in January 2015.

5.     Future Direction

Jump Bunch program – casual play sessions to begin in January 2015 school holidays.

Major bookings have been secured for 2015 with preparation of works for the events to begin in
January 2015. Scheduled events as follows:

 Australian Badminton Championships;
 Noosa Long Weekend Festival’s production by Opera Australia;
 Noosa Long Weekend Festival’s Noosa and Brisbane Symphony Orchestra’s anniversary
   performance; and
 Sunshine Coast Area Rollers – 6 x roller derby league events throughout 2015.



Previous Council Consideration

Nil.


Finance & Risk

Refer Section 1 of this report – Finance.


Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Management Accountant, Corporate Services




                                                                                     Page 69 of 80

Section 70

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           3 MARCH 2015


Departments/Sections Consulted:

X   Community Services                       Planning & Infrastructure
    Disaster Management & Public Order       Building & Plumbing Services
    Waste & Environmental Health             DA Planning
X   Community Facilities                     Strategic Land Use Planning
    Cultural Facilities                      Asset Design & Investigations
                                             Asset Planning
                                             Civil Operations
                                             Environment

    Executive Office                     X   Corporate Services
    Community Engagement                 X   Finance
    Customer Service                         ICT
    Executive Support                        Procurement & Fleet
    Governance                               Property & Facilities
    Human Resources                          Revenue Services




                                                                              Page 70 of 80

Section 71

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                 3 MARCH 2015


6                        THE J AND BICENTENNIAL COMMUNITY CENTRE (BCC) - HALF YEARLY REPORT
                         TO 31 DECEMBER 2014
DOCUMENT INFORM AT ION




Author                             The J Coordinator, Scott Braby
                                   Community Services

Index                              ECM/ Subject/ 72.01 The J

Attachments                        Nil

EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the The J Coordinator to the Infrastructure & Services Committee
Meeting dated 3 March 2015 providing an update on the activities of The J and Bicentenntial
Community Centre to 31 December 2014.



REPORT
The purpose of this report is to advise Councillors of The J and Bicentennial Community Centre’s
(BCC) activities for the half year ending 31 December 2014.

The J is a versatile community space. It hosts a wide range of programming, school holiday
activities and regular live entertainment. It is also home to current tenants University of the
Sunshine Coast (and TAFE) and Noosa Community Radio. Within The J there is a 330 seat
theatre and a combination of flexible meeting spaces, conference rooms and facilities for hire,
complemented by covered outdoor areas and stylish open foyers.

The Bicentennial Community Centre (the BCC) includes a Main Hall, Annexe and Demountable
building. The BCC is used for a variety of community, sporting and cultural activities by individual
community members and organisations for activities such as classes, meetings, rehearsals and
workshops.


1.                       Finance

The objective of all services within the Community Facilities Branch is to balance the demands of
access, equity and community service obligations with sound financial management, and
improving revenue through innovative and entrepreneurial approaches, whilst minimising
operational costs.




                                                                                     Page 71 of 80

Section 72

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                3 MARCH 2015


The J

                                   The J Half Year 2014/15
                                                                                 Budget Full
                                  Actual YTD    Budget YTD     Variance (YTD)      Year
Total Revenue                       $225,872        $245,736         -$19,864      $438,572
Total Expenditure                   $308,006        $370,535          $62,529      $755,202
Net Operating Surplus/Deficit        -$82,134      -$124,799          $42,665      -$316,630
Depreciation                        $147,702        $147,702                $0     $295,405
Internal Charges                    $100,133         $99,692             -$441     $199,385
Total Surplus/Deficit               -$329,969      -$372,193          $42,224      -$811,420



                                 The J Half Year 2014/15
  $400,000

  $300,000

  $200,000
                                                                                      Actual YTD
  $100,000
                                                                                      Budget YTD
        $0
                 Total Revenue         Total Expenditure       Net Operating
 ($100,000)                                                    Surplus/Deficit

 ($200,000)


The half year summary performance sees the The J net operating position $42,655 better than
year to date projections.

Revenue is behind budget projections, mainly in the area of venue hire ($21,169), a trend which
has continued from Quarter 1. The venue hire budget was recognised as being challenging
when it was developed, however, December also saw a reduction in revenue as a result of
groups moving from the BCC to The J, and the requirement for Hillsong Church’s major
Christmas booking to be held at the Noosa Leisure Centre.

Expenditure is down in three main areas; maintenance ($29,990), electricity ($10,097) and
water/sewerage charges ($6,328). Contractor commitments prior to Christmas delayed some
maintenance which is now scheduled for early 2015. Electricity and water and sewerage
charges also appear to have been overestimated during the budget development and a BR3
adjustment has been submitted to reflect this and the decrease in revenue.




                                                                                    Page 72 of 80

Section 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                           3 MARCH 2015


BCC

                                      BCC Half Year 2014/15
                                                                                            Budget Full
                                    Actual YTD     Budget YTD       Variance (YTD)            Year
 Total Revenue                         $23,641           $23,846                  -$205           $72,000
 Total Expenditure                     $42,807           $57,520                $14,713         $115,040
 Net Operating Surplus/Deficit        -$19,166           -$33,674               $14,508          -$43,040
 Depreciation                          $26,037           $26,037                    $0            $52,075
 Internal Charges                        $8,839           $8,839                    $0            $17,678
 Total Surplus/Deficit                -$54,042           -$68,550               $14,508         -$112,793




                                 BCC Half Year 2014/15
     $80,000

     $60,000

     $40,000
                                                                                          Actual YTD
     $20,000
                                                                                          Budget YTD
         $0
                 Total Revenue       Total Expenditure        Net Operating
 ($20,000)                                                    Surplus/Deficit
 ($40,000)


BCC revenue is on track for the half year while expenditure is down due mostly to overestimated
electricity, sewerage and water charges, reduced contract cleaning expenditure (new contractor)
and maintenance not being able to be scheduled until the new year as a result of changes at the
site.

2.      Customers

The J

In addition to normal activity and regular hirers this quarter, 26 events and performances
occurred at The J, including:

October
 Greenzone Disco
 Noosa Chorale
 Blue Light Disco
 Network Ten event - ad shoot

November
 Molly’s Song
 Hat Fitz & Cara
 Fitness Rocks School Aerobics
 Noosa Heads Jazz Club
 Dave Hughes Comedy

                                                                                               Page 73 of 80

Section 74

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  3 MARCH 2015


 Blue Light Disco
 Performing Arts Factory
 CQU Badging ceremony

December
 Greenzone Disco
 Sunshine Coast Youth Theatre
 Santa’s Classy Helpers
 Noosa Christian College Awards
 Noosa Professional Dance Academy
 Noosa Chorale

The overall attendance figure at The J for the quarter is 14,858, totalling 33,693 for the half year.
This figure includes people attending the site for venue hire bookings, performances,
Xbox/Lounge use, SCU, TAFE, radio station attendance and general public use. Statistic are
down for this quarter (compared to Quarter 1) mainly due to Sunshine Coast University holidays
and The J being closed over the Christmas new year break.

BCC

The main focus for management during the second quarter of 2014 was preparing the BCC Main
Hall for the Noosa Gymnastics Club, who took up a long term lease over the Hall in January
2015, whilst at the same time transferring user groups such as the Chorale, the Jazz Club and
Noosa Table Tennis to more appropriate venues such as The J and Noosa Leisure Centre.

Having a major new anchor tenant will help reposition the BCC and significantly improve its
revenue stream effectively giving it a new lease of life.

3.     Staffing

Staff training has been identified for Links booking and point of sale software.

4.     Systems & Processes

The ECM pilot at The J is continuing to test the ECM system to determine how it best works for
Community Facilities branch.

Some minor technical issues have occurred with the booking software system since a recent
upgrade. Staff are working with the vendor to assist in solutions to ensure ongoing operational
efficiency.

5.     Future Direction

 Completion of The J Service Review and implementation of recommended actions.
 Finalising negotiations and agreements with all major user groups for 2015 at both The J and
   BCC.


Previous Council Consideration

Nil.

Finance & Risk

Refer Section 1- Finance.

                                                                                      Page 74 of 80

Section 75

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              3 MARCH 2015


Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Management Accountant Corporate Services


Departments/Sections Consulted:

X      Community Services                       Planning & Infrastructure
       Disaster Management & Public Order       Building & Plumbing Services
       Waste & Environmental Health             DA Planning
X      Community Facilities                     Strategic Land Use Planning
       Cultural Facilities                      Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

       Executive Office                     X   Corporate Services
       Community Engagement                 X   Finance
       Customer Service                         ICT
       Executive Support                        Procurement & Fleet
       Governance                               Property & Facilities
       Human Resources                          Revenue Services




                                                                                 Page 75 of 80

Section 76

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 MARCH 2015


     7                   NOOSA COMMUNITY CARE (NCC) - HALF YEARLY REPORT TO 31 DECEMBER 2014
DOCUMENT INFORM AT ION




Author                           Noosa Community Care Coordinator, Greg Tucker
                                 Community Services

Index                            ECM/ Subject/ 1.05 Community Care Management

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Noosa Community Care Coordinator to the Infrastructure &
Services Committee Meeting dated 3 March 2015 providing an update on the activities of Noosa
Community Care (NCC) to 31 December 2014.



REPORT
The purpose of this report is to advise Councillors of the Noosa Community Care activities for the
half year ending 31 December 2014.

The services provided under the HACC (Federal & State) funding are:
 Domestic Assistance
 Social support
 Allied Health Care
 Personal Care
 Centre Based Day Care
 In Home Respite Care
 Case Management
 Client Care Coordination
 Counselling /Support, Information & Advocacy
 Transport
 Home Maintenance
 Home Modifications

The services provided under the HAS (State) funding are:
 Information and Referrals regarding home safety and security
 Home Maintenance
 Home Modifications




                                                                                   Page 76 of 80

Section 77

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                   3 MARCH 2015


1.      Finance

The objective of all services within the Community Facilities Branch is to balance the demands of
access, equity and community service obligations with sound financial management, and
improving revenue through innovative and entrepreneurial approaches, whilst minimising
operational costs.

Noosa Community Care operates under funding agreements with both the State and Federal
Governments.

                            Noosa Community Care Half Year 2014/15
                                                                                       Budget Full
                                     Actual YTD Budget YTD         Variance (YTD)         Year
 Total Revenue                       $1,345,505 $1,373,288                -$27,783      $2,695,913
 Total Expenditure                   $1,086,809 $1,090,395                  $3,586      $2,215,459
 Net Operating Surplus/Deficit         $258,696   $282,893                -$24,197        $480,454
 Depreciation                           $16,348    $16,348                      $0         $32,695
 Internal Charges                      $225,771   $225,771                      $0        $451,542
 Total Surplus/Deficit                  $16,577    $40,774                -$24,197         -$3,783




                        Noosa Community Care 2014/15
 $1,600,000
 $1,400,000
 $1,200,000
 $1,000,000
     $800,000                                                                           Actual YTD
     $600,000
                                                                                        Budget YTD
     $400,000
     $200,000
          $0
                  Total Revenue         Total Expenditure        Net Operating
                                                                 Surplus/Deficit


The budget position sees NCC operating within the funding grants for the half year, although
$24,197 behind the projected budget surplus.

Reduced client numbers due to sickness, higher service needs and natural attrition have resulted
in lower revenue than budgeted.

There is also a slight overspend in the Home Assist budget for the first half of the year due to
extended sick leave of one Field Officer, requiring the use of contractors to backfill the workload.




                                                                                      Page 77 of 80

The text continues on section 78.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.