Original source · versioned page text
6. Appendix C - Noosa Assessment Benchmark Assessment
Performance Outcomes Response to DEO
DEO
ix. recognising some residents obtain their Not Applicable
energy needs from renewable energy
The proposal is not for residential development.
sources rather than relying on mains
power; and
x. ensuring water and energy are used Complies
efficiently in an attempt to reduce
The proposal provides sufficient servicing
greenhouse gas emissions and pressures
infrastructure and facilities for the development
on the supply of resources.
without having to compromise the surrounding and
adjoining existing buildings and its operations.
This is further demonstrated in the Engineering
Services Report in Appendix H.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original