6. Appendix C - Noosa Assessment Benchmark Assessment
Specific Outcomes Probable Solutions Response
Services and utilities S7.1 S7.1 – S7.6 Complies
O7 Plant species used in landscaping The proposal complies with the
adjacent to substations, or adjacent specific outcomes because:
All landscaping works maintain to or on electricity transmission line
1. NOTES on Sheet 1
adequate safe distance from easements, are less than 4m high at
references the requirement
maturity and do not encroach within
services and utilities including for root barriers for tree
3m of a substation boundary; planting near stormwater
substations, overhead
OR pipes or underground
powerlines, power poles and
treatment device.
transformers, street lamps, S7.2
For trees higher than 4m, trees are
planted at a distance from any part of
an electricity transmission line at least
equal to the expected height of the
tree at maturity (see Figure 14-17);
AND
S7.3
For power lines that connect to a
premises, the height of plant species
at maturity provides for a 2m
clearance below the power line; (see
Figure 14-18)
AND
S7.4 Trees and large scrubs are
located a minimum of—
a) 5m from electricity poles and
pillars;
stormwater catchment pits, and
b) 4m from street lamps;
underground services and
c) 2m from stormwater
utilities
catchment pits; and
d) 2m from underground
services and utilities;
AND
S7.5
Plants are located to enable
tradespersons to access, view and
inspect service meters, such as water
and electricity meters;
AND
S7.6
Root barriers are installed around
trees that are located within 3m of
any infrastructures or that have
potentially invasive roots.