23110 Op Works Issue 20-12-2023
been treated for eradication of leaf hopper by systemic injection of an approved
insecticide to the Local Authority requirements and that the stock is not carrying
leaf hopper - Prior to installation
− Planting Maintenance Program for Superintendent’s approval and Logbook
recording when and what maintenance work has been done and what materials,
including toxic materials, have been used.
− Plant suppliers must be approved by the Superintendent prior to placing orders.
Submit to Superintendent details of proposed supplier(s) including industry
accreditation and third-party assessed QA system. Submit data on sources and
manufacturers of other components for Superintendent’s approval - Prior to
ordering.
Irrigation
− Scaled Design Drawings as specified for coordination and comment - Prior to
installation
− Letter of Certification confirming that design and details comply with this
specification and its Design Intent - Prior to installation
− All necessary local authority permits and approvals prior to installation. This
includes the supply and placement of backflow prevention devices, if required. -
Prior to installation
− Supply product literature, trouble-shooting and industry warrantees on the system
components. This operation manual shall take the form of a hard cover ring binder
- Prior to Practical Completion
− Supply written copy of typical Summer and Winter Irrigation programs - Prior to
Practical Completion
− Carry out a Training Program to ensure that maintenance staff can operate the
system - Prior end of Establishment/ Maintenance period.
6.2 "As Constructed" Drawings
1 x digital copy of each plan to be provided of the following drawings:
Irrigation Works
“As Constructed” Drawings of the irrigation works shall be submitted to the
Superintendent prior to Practical Completion.
“As Constructed” drawings shall include:
− All valve locations
− All pipe locations, sizes and depths
− All wiring and wiring joints
− Spray head locations
− Automatic controllers, rain switches
− All other valving
− Typical valve box assembly
− Irrigation pumps
Electrical services
− “As Constructed” Drawings of the electrical works shall be submitted to the
Superintendent prior to Practical Completion.
Path Network
Including constructed levels for walkways, paths, ramps and stairs
[email protected] David Low Way Duplex LANDSCAPE SPECIFICATION Project No. Drawing Issue NOT FOR CONSTRUCTION
23110 LA6-004 C
9 Fort Lane Issue Date Purpose Drawn Approved
Milton Qld 4064
206 David Low Way, Peregian Beach
A 11-10-2023 DRAFT ISSUE GG AG
PO Box 287
B 12-10-2023 OP WORKS ISSUE GG AG
Paddington Qld 4064
©2023 Wild Studio Australia Pty Ltd. These C 13-12-2023 OP WORKS ISSUE GG AG
urban landscape architecture drawings are protected by copyright and may not
wildstudio.com.au Client: Adam Offermann and Madeleine Swete Kelly be amended or reproduced without authorisation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original