Original source · versioned page text
23110 Op Works Issue 20-12-2023
WA
ADJACENT PROPERTY
EX POWER POLE
PROPERTY BOUNDARY
PE1
DC
EX SEWER MANHOLE SSD IC SSD
DRYING
COURT
16
.0
TU1
G OVER
PL1
PLUNGE
POOL BUILDIN
SSD
TERRACE
PE1 POOL PL1
600MM WIDE
BUILDIN
DISH DRAIN
G OVER
BUILDIN
LANAI
G OVER
SSD
RE
BIKE STO
16.0
T1
PA2 PA2 TU1
PA2
SSD
SSD
17.0
ED1
EX
EL
17.
0
EC
PL1
BUILDING
TR
IC
GARAGE
AL
W
TU1
IR
OVER
E
BU
OV
IL
D
ER
IN
G
TR1
O
VE
R
SSD
EX ELECTRICAL WIRE OVER
RAINWATER
TANK UNDER
PROPER
TY BOUN
PLUNGE
DRIVEWAY
DAVID LOW WAY
POOL
17.0
DARY
BUILDIN
SSD
GARAGE PA1
BUILDING
PA1
G OVER
PA1
EX ELECTRICAL WIRE OVER
RAINWATER PL1
OVER
TANK UNDER
LANAI PA1
ADJACENT
PROPERTY
PE1 POOL
600MM WIDE
DISH DRAIN TU1
POOL
TERRACE
RE
PL1 BIKE STO
PROPERTY BOUNDARY
SSD
ED1
18
0.
T2
G OVER
BUILDIN
EX WATER METER
18.0
DRYING PL1
EX FIRE COURT PA1
HYDRANT PA2 PA2
PA2 PL1
SSD SSD
ED1
EX COMM PIT
PROPERTY BOUNDARY
EX WATER METER
EX PEG
[email protected] David Low Way Duplex EXTERNAL WORKS PLAN Project No. Drawing Issue Scale NOT FOR CONSTRUCTION
23110 LA1-001 D 1 : 100 @A3
9 Fort Lane
Milton Qld 4064
206 David Low Way, Peregian Beach GROUND Issue Date Purpose Drawn Approved
PO Box 287 A 11-10-2023 DRAFT ISSUE GG AG
Paddington Qld 4064 B 12-10-2023 OP WORKS ISSUE GG AG
©2022 Wild Studio Australia Pty Ltd. These C 13-12-2023 OP WORKS ISSUE GG AG
urban landscape architecture drawings are protected by copyright and may not
wildstudio.com.au Client: Adam Offermann and Madeleine Swete Kelly be amended or reproduced without authorisation. 0 0.5 1 2 3 5m D 20-12-2023 OP WORKS ISSUE GG AG
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original