Council archive · source document
Attachment D - Stormwater Man Plan · MCU18/0013
Attached to the e-mail Response to info request part 2 - MCU18/0013.
Plans and drawings: the text below has words only, no drawings.
CATCHMENT SUMMARY
LEGEND
SECTION
STORMWATER MANAGEMENT PLAN
PRELIMINARY
BRISBANE SURVEYOR No. DATE REVISIONS SHEET NUMBER
Level 3 Limestore, 33 Longland St, Newstead SHEET APPROVED DESIGNED
T 07 3852 4333 F 07 3852 4777
E [email protected]
GOLD COAST PROJECT DRAWN
PARTNERS
Level 3, 17 Welch St, Southport
T 07 5571 1599 F 07 5571 1330 REVISION
USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE PROJECT
E [email protected]
ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE DRAWINGS LOCATION DATE DRAWN
NORTHERN NSW (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN PROJECT NUMBER
2/22 Moss St, Kingscliff WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED!
IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH DUE CARE AND
www.westerapartners.com.au ABN 52 097 417 975
T 02 6674 8047 F 02 6674 8049
E [email protected] DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT For and on behalf of
WESTERA PARTNERS PTY. LTD.
FILE NAME
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Man Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 281 KB (small file)
- File type
No other editions are linked here.