Our reference: 2010-19429 SER
1 December 2020
Body Corporate for the Commodore
PO Box 202
LABRADOR QLD 4215
[email protected]
Dear Sir/Madam
Early referral response—with conditions
(Given under section 57 of the Planning Act 2016)
The State Assessment and Referral Agency (SARA) received your request for an early referral response
on 26 October 2020 for the proposed development application described below.
Applicant details
Applicant name: Body Corporate for the Commodore
Applicant contact details: PO Box 202
LABRADOR QLD 4215
[email protected]
Location details
Street address: 80 Noosa Parade, Noosa Heads
Real property description: 0BUP3661
Local government area: Noosa Shire Council
Application details
Development permit Operational work for a pontoon for private use
Referral triggers
This early referral response is given for the following provisions of the Planning Regulation 2017:
10.17.3.1.1 Tidal works or work in a coastal management district
10.17.3.2.1 Tidal works or work in a coastal management district
Conditions
Under section 56(1)(b)(i) of the Planning Act 2016 (the Act), the conditions set out in Attachment 1 must
be attached to any development approval.
Fitzroy/Central regional office
Level 2, 209 Bolsover Street,
Rockhampton
Page 1 of 5 PO Box 113, Rockhampton QLD 4700
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
2010-19429 SER
Reasons for decision to impose conditions
The SARA must provide reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.
Approved plans and specifications
The SARA requires that the plans and specifications set out below and enclosed must be attached to any
development approval.
Drawing/report title Prepared by Date Reference no. Version/issue
18 August 17494-D01
Site plan Superior Revision: A
2020
Pontoon plan Superior 18 August 20 17494-D02 -
This response should be submitted in its entirety when making the application to the assessment
manager. Pursuant to section 54(4) of the Act, you will not be required to refer your application to the
SARA for the referral triggers identified above if the following conditions are satisfied:
Any changes to the proposal before the application is made to the assessment manager do not
result in a substantially different development to that which was presented to the SARA with the
request for an early referral response
The development application must be made to the assessment manager within 12 months of the
date of this early referral response.
For further information please contact Jonas Griffin Fodaro, Planning Officer, on 4924 2915 or via email
[email protected] who will be pleased to assist.
Yours sincerely
Anthony Walsh
Manager Planning
enc Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved plans and specifications
State Assessment and Referral Agency Page 2 of 5
Page 3
2010-19429 SER
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Operational works – Tidal works in a coastal management district
Tidal works or work in a coastal management district—The chief executive administering the Planning
Act 2016 nominates the Director-General of the Department of Transport and Main Roads to be the
enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
1.
The development must be carried out generally in accordance with At all times
the following plan:
Site plan prepared by Superior dated 18 August 2020,
reference 17494-D01, Revision A
Pontoon plan prepared by Superior dated 18 August 2020,
reference 17494-D02.
2.
The structure must be lit/marked in accordance with the following At all times
specifications, such that it does not cause a risk to the safe
navigation of other ships:
section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting.
3.
The construction, operation or maintenance of the structure, and any At all times
ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the
While works are
work must be removed from the waterway and suitably disposed of
occurring
at the applicant’s expense.
5. All piles and/or structures to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
Tidal works or work in a coastal management district—The chief executive administering the Planning
Act 2016 nominates the Director-General of the Department of Environment and Science Coastal
Assessment to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following condition(s):
6.
The construction of the pontoon must be undertaken generally in For the duration of
accordance with the following plan: works and to be
maintained
Site plan prepared by Superior dated 18 August 2020,
reference 17494-D01, Revision A
Pontoon plan prepared by Superior dated 18 August 2020,
reference 17494-D02.
State Assessment and Referral Agency Page 3 of 5
Page 4
2010-19429 SER
7. The works to which this approval relates are to be for a private At all times
purpose only.
8. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of these referral agency conditions;
(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval;
(c) maintain such measures, plant and equipment in a proper
and efficient condition; and
(d) operate such measures, plant and equipment in a proper
and efficient manner.
9. For the operational works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
10.
Should the pontoon collapse, fail or otherwise suffer structural As soon as reasonably
consequences which impact their integrity or ability to function as practicable subsequent
intended, the works must be: to the damage
(a) reinstated in accordance with this development approval; or
(b) removed and disposed of at an appropriately licensed facility.
11.
Submit “As Constructed drawings” to [email protected] or mail Within two (2) weeks of
to: the completion of the
works
Department of Environment and Science
Permit and License Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
State Assessment and Referral Agency Page 4 of 5
Page 5
2010-19429 SER
Attachment 2—Reasons for decision to impose conditions
Reasons for the SARA’s decision
The reasons for the decision are:
The development is a private use pontoon.
The development meets fasttrack5 requirements and has provided owners consent.
The works are to be carried out in accordance with the approved plan.
The proposed pontoon does not impede navigation.
Material used in the assessment of the early referral response:
Development application material
SDAP, version 2.6
Planning Act 2016
Planning Regulation 2017
State Assessment and Referral Agency Page 5 of 5
Page 6
GE78-N
State Assessment and Referral Agency (SARA)
Statement of reasons for application 2010-19429 SER
(Given under section 56 of the Planning Act 2016)
SARA role: Referral agency
Applicant details
Applicant name: Body Corporate for the Commodore
Applicant contact details: PO Box 202
Labrador QLD 4215
[email protected]
Location details
Street address: 80 Noosa Parade, Noosa Heads
Real property description: 0BUP3661
Local government area: Noosa Shire Council
Development details
Development permit Operational work for a pontoon for private use
Assessment matters
Aspect of development State Development Assessment Provisions (SDAP)
requiring code assessment applicable codes
1. Operational work State Code 8: Coastal development and tidal works
2. Operational work State Code 7: Maritime safety
Reasons for the department’s decision
The reasons for the decision are:
The development is a private use pontoon in the coastal management district.
The development meets fasttrack5 requirements and has provided owners consent.
The works are to be carried out in accordance with the approved plan.
The proposed pontoon does not impede navigation.
Material used in the assessment of the early referral response:
Development application material
SDAP, version 2.6
Planning Act 2016
Planning Regulation 2017
Fitzroy/Central regional office
Level 2, 209 Bolsover Street,
Rockhampton
Page 1 of 1 PO Box 113, Rockhampton QLD 4700
Page 7
LOT 0 LOT 0 LOT 270
ON BUP 3661
SITE PLAN SCALE 1 : 300
IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT ANY
VESSEL BERTHED DOES NOT EXCEED THESE MAXIMUMS
DO NOT SCALE DRAWINGS. ELEVATION SCALE 1 : 100
Page 8
PONTOON PLAN SCALE 1 : 30
SECTION A - A SCALE 1 : 25
[OCR of page images]
( 5000 )
t+— 500 2000 2000 500 —+|
CAST ALUMINIUM
CORNER BRACKETS 1000 MAX
(ROUNDED CORNERS) FRAME TIE BOLYS AT STANDARD MOORING
‘ A 1000 CRS. TYP. [J.N.O CLEATS, (5 No.)
Vv} {
(/ V QY NOTE: FRAME TIE BOLTS TO BE M16
— x 300 LONG, TIE FABRIC TO BOLTS
COUNTERWEIGHT
TLAYER OF
SL82 FABRIC
3000
rmeresarsarancs / Ne Rata
PLANS AND DOCUMENTS , \ ,
referred to in the REFERRAL
AGENCY RESPONSE som
SARA ref: 2010-19429 SER
PONTOON PLAN ss scAate 1:30
3000 |
. 40 MPa CONCRETE DECK
Date: 1 December 2020 0, ALUMINIUM M16 TIE BOLTS x 300 LONG TO FULL |
PONTOON PERIMETER OF FRAME AT 1000 CRS SL82 FABRIC,
FRAME U.N.O. TIE FABRIC TO BOLTS 50 TOP COVER
|
t (a F r wl
= = 4
4700
575
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
le
I>
la
|2
Ih
IS
i ae
Zot
SL CLASS POLYSTYRENE WRAPPED IN
1.6mm POLYETHYLENE EXTERNAL SKIN
SECTION A - A SCALE 1:25 WITH CONTINUOUSLY WELDED JOINTS
No: DATE REVISION DRAWN BY’ ATLAS MARINE INTERNATIONAL DATE (PROJECT PROPOSED PONTOON AND GANGWAY CERTIFIED
TRADING AS ¢ SUPERIOR? 18/08/2020 orc. rire PONTOON CONSTRUCTION DETAILS MARK WICHLINSKI
SUPERIOR JETTIES CLIENT CONSULTING ENGINEERS PTY LTD
DRAWING No. BODY CORPORATE OF THE COMMODORE Sah >
ADDRESS Vii - )
AIUAS HARA ATERWATONAL PTY, LTO Mall Aderess:.0. Box 202 Labrador 4215 | | 17494 —-D02 80 NOOSA PARADE Wel u ul
iO PART OF THIS DOCUMENT MAY BE COPIED,
REPRODUCED, STORED IN A RETRIEVABLE SYSTEM REVISION NO: NOOSAVILLE 7 Van ewe
IN ANY FORM, OR TRANSMITTED BY ANY MEANS Phi (07) 5594 8200
WITHOUT PRIOR WRITTEN PERMISSION OF Fax: (07) 5594 8222 DRAWN BY DESIGNED CHECKED BY PAPER SIZE STALE NPER No 832296
ATLAS MARINE INTERNATIONAL PTY, LTD. Email: info@superior jetties.com MED. Mw. A3B AS NOTED RPEQ: 1643, RPB: EC36234 1
Page 9
Development Assessment Rules—Representations about a
referral agency response
The following provisions are those set out in sections 28 and 30 of the Development Assessment Rules1
regarding representations about a referral agency response
Part 6: Changes to the application and referral agency
responses
28 Concurrence agency changes its response or gives a late response
28.1. Despite part 2, a concurrence agency may, after its referral agency assessment period and any
further period agreed ends, change its referral agency response or give a late referral agency
response before the application is decided, subject to section 28.2 and 28.3.
28.2. A concurrence agency may change its referral agency response at any time before the application
is decided if—
(a) the change is in response to a change which the assessment manager is satisfied is a change
under section 26.1; or
(b) the Minister has given the concurrence agency a direction under section 99 of the Act; or
(c) the applicant has given written agreement to the change to the referral agency response.2
28.3. A concurrence agency may give a late referral agency response before the application is decided,
if the applicant has given written agreement to the late referral agency response.
28.4. If a concurrence agency proposes to change its referral agency response under section 28.2(a),
the concurrence agency must—
(a) give notice of its intention to change its referral agency response to the assessment manager
and a copy to the applicant within 5 days of receiving notice of the change under section 25.1;
and
(b) the concurrence agency has 10 days from the day of giving notice under paragraph (a), or a
further period agreed between the applicant and the concurrence agency, to give an amended
referral agency response to the assessment manager and a copy to the applicant.
1 Pursuant to Section 68 of the Planning Act 2016
2 In the instance an applicant has made representations to the concurrence agency under section 30,
and the concurrence agency agrees to make the change included in the representations, section
28.2(c) is taken to have been satisfied.
Page 1 of 2
Page 10
Part 7: Miscellaneous
30 Representations about a referral agency response
30.1. An applicant may make representations to a concurrence agency at any time before the application
is decided, about changing a matter in the referral agency response.3
3 An applicant may elect, under section 32, to stop the assessment manager’s decision period in which
to take this action. If a concurrence agency wishes to amend their response in relation to
representations made under this section, they must do so in accordance with section 28.
Page 2 of 2