Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

07/0694 - Lot reconfiguration [As Published] · 152007.694

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

"a. ‘

Po

=——-—{A _\Max.Watterson.& Associates ==

Consulting Surveyors & Development Consultants

 

 

ABN 59 847 644 252 {formerty Clement, Reld & Watterson)

10 Maple Street,

(RO. Box 639) COOROY 4563

Ph: (07) 5442 6121 oO
Fax: (07) 5442 5125 ‘p
Email: [email protected]

PRINCIPAL ;
MAXWELL L . WATTERSON Cadastral Surveyor (Qtd)
B. Surv (UNSW), M.I.S.Ause, :

  

‘48 APR 2007 fs

NOOSA ~
SHIRE COUNCIL

 
   
   

Ax th .
. 13” April, 2007
U7 Ref: 06/2373

The Chief Executive Officer
Noosa Council

P.O. Box 141

TEWANTIN Q 4565

Dear Sir/Madam,

Re: Development Application for Reconfiquration of Lots
Lots 22 & 23 on RP126837 - 80 & 82 Tingara Crescent, Sunrise Beach

 

Applicant: J.G. & S.P. Reid. i
Please find herewith an application for a Development Permit to reconfigure the “a,
boundaries of the above properties including:
“4. IDAS Development Application Forms: Parts A & F and IDAS Assessment
‘ Checklist.

2. A cheque for $1,880.00; made payable to Noosa Council: being the ~
application fees.

3. Six copies of a Planning Report including the Plan of Development (Ref:
07/2373A).

Yours fajthfully
Ail.

Max Watterson
Full text of the other 32 pages

Page 2

& *e
INTEGRATED PLANNING ACT 1997

oe ee ge

Fem 1 OackpmetAppiction —

Part A, Version 2.4, 29 May 2006

idas)

 

 

Common details

_
a
2.

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (+) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

- Description of land

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1. Street address: fncludinghouse number, street name, suburtVlocality name & postcode) (if applicable)
Altland the subject of the application, must be omy -,
idenifed. However, a description ofthe tnd isnot | 80 & 82 Tingira Crescent, Sunrise Beach _ |.
 Eentaiy Nelson Aetear eeay 2. Name of water body or watercourse, within. which the development is proposed: (if appticable)
mpleting Q2 - C2 applies if
development is proposed within a water body or
watecourse. 3. Lot on plan description (eg. Lot 123 on RP-4567)/ GPS coordinates: :
Advice for completing Q3 - Most and can be r 7
Cereb alton dn eon Tes clas [ Lots 22 & 23 on RP126837 |:
focal government. seamens orien 14 The above description is for: (tick applicable box)
; However, if the ‘and on which the development is EX (i) the land on which the development is proposed; or
ed di have a lot on plan description (i.e. m an fas .
Fo dovabpmesttt paced iene naten (Gi) the land adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
i) the lot on plan description for so.
® moningodocentant oe LD iiii) the water body or watercourse.
ii) GPS coordinates where there i
" adiviingladacent van (ep in Moreton Bayp. 5. Shop / tenancy number: 6. Storey / level: 7. Total area of fand: (m? or ha):
Advice for completing Q7 - Q7 does not apply if the
development is within a water body or watercourse. | | 1207sq.m.
Advice for completing 08 - 08 applies if in whi is si . if anni
development is ii na ‘onal qovenment wea. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc} (if applicable)
Note: Areas. below high water mark ere not within a | Noosa Shire Council |
focal government's area unless provided for under the 7
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advi mptetin: Q9 applies if g
developments on strategic por land ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area. For more details refer to Guide 11 |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
If there is insufficient room available, details may be
provided in an attachment to the application. Vacant
11, Proposed use of the land: (eg. 6 unit apartment building, 30 Iot residential subdivision, ERA for aquaculture in
ponds with a tofal area of 7 ha for which wastes are released info waters etc).
i Realignment of a boundary |
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc}
Part A must always be accompanied by other i
compléted parks of Form 1. For information about Part F and IDAS Assessment Checklist |
when a part of Form 4 may apply refer to Guide 1, . .
Applicant details 13. Applicant's name: 15. Contact person:
Crearly identify who is making the application. The .
applicant need net be the owner of he land. | JG. & S.P. Reid | [ Max Watterson |
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
+ The applicant is responsibte for ensuring the 5442 6121 5442 5125 -
information provided is correct. The assessment
manager, any referral agency & the Chief Executive [email protected]
(where applicable) will rely on this information when
assessing and deciding the application, 17. Postal address:
ff the appficant is a company - a contact person F
ithe spplicantis acompany [ PO Box 639, COOROY Q 4563
18. Signature: 19. Date:

 

 

[e=3=307)

 

 

 

 

"

Page 3

om

Be
INTEGRATED PLANNING ACT 1997

Land owner’s consent (ifeppiicable) =| 20.

Section 3.2. 1(3} of the iPA prescribes that an
application must contain, or be supported by, the
written consent of the land owners, if the application
involves:

(i) amaterial change of use;

(ii) reconfiguration of a tot;

Gil), work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995;or

{iv) work on rail corridor land defined under the
Transport fnirastructure Act 1994,

Section 3.8.1(2)(a) of the [PA provides that

Jandowner's consent is not required for a mobile or

temporary ERA.

For more information refer to Guide 1.

 

_Land owner's consent to the making of this application: _

Part A, Version 2.4, 29 May 2006

 

Name Signature Date

 

(i) John Graham Reid

(ii) Susan Patricia Reid

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21.

Section 3.2. 1(5) of the IPA requires evidence of
resource entitlement be given for applications that
involve a prescribed State resource.

Section 3,2.1(10)(a)(ii) of the IPA prescribes that an

application cannot be taken to be. property made 22.

 

without evidence of the resource entitlement.

Advice for completing Q21 & 22

Refer to schedule 10 of the (ntegrated Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in support of the lodging of this.
development apptication,

Advice for completing Q23 23,

The information in (i) ~ (v) is mandatory if evidence is
required under Q22 (ii) or (lil) above,

The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.

Section 3,2.1(5A) allows the resource manager to limit
the time the evidence may be used. 023 (vi) must be
completed if the evidence is time limited.

Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

NO - go fo Q24 (YES - goto a22

This application is accompanied by evidence: (tick applicable box)
C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to @23(vi)

(1 (ii) the chief executive of the department administering the resource is satisfied the

development is consistent with an allocation of, or entitlement to, the resource - go
to. 023

iii) the chief executive of the department administering the resource is Satisfied the

development application may proceed in the absence of an alloéation of, or
entitlement to, the resource - go to 023

Evidence of the resource entitlement:

{i) Resource entitlement / oe details
(i) Name of — officer
(ili) Position of ae Officer

(iv) Signature of delegated officer

(vii) Official stamp of the department

administering the resource (if
applicable)

 

 

 

 

 

(v) Date ,

(vi) pe date of evidence (if applicable)

 

 

 

 

Assessment triggers 24.

This checklist does not apply if the application requires
the completion of Parts A and B of the Form only. It
Trust be completed for alt other applications.

ls the IDAS Assessment Checklist completed and attached to this application?

YES (CI NO - the assessment manager may refuse to accept this application on the

grounds that the application has not been properly made

 

Plans / drawings / reports 25.

An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing ©
the application during public scrutiny or pubtic
notification to understand the scope of the proposal
and any potential impact.

 

Plans/drawings/reports accompanying this application:

 

 

 

Pian / Drawing / Report Number Title Date
Plan of Proposed
(i) 07/2373A Reconfiguration of Lots 22 & 23 | 19/02/07
| on RP126837 L
(ii)
(iii)
(iv)

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY {applicable to assessment manager's)

DATE

| Fee | RECEIVED

| RECEIVING OFFICER'S | REFERENCE
NAMES NUMBERIS

Lo7/694 |

Page 4

wes

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
_ Notification of Engagement of Private Certifier (Optional format).

To. : Council. | have been engaged as the private cerfifier for the building work referred toin nihis application

 

 

 

Date ofengagement| / / Accreditation Number. __ Name: ‘Signature:

 

 

Page 5

INTEGRATED PLANNING ACT 1997

Part F, Version 2.0, 4 October 2004

Form 1 Development Application

Reconfiguring a lot

 

 

 

Completion of all applicable questions on Part F is mandatory for all applications involving the reconfiguring of a lot (including freehold subdivision, community

title subdivision, subdivision by lease, efc.).

 

- Nature of the application

A development permit authorises. development
to occur, while a preliminary approval is a step
in the approval process and does not
authorise development fo occur.

1.

This application is for: (tick one (1) or both if applicable)

KX] Development permit - provide details below eg. stage 1: freehold subdivision of 25 lots, realignment of a
boundary, creation of an access easement)

| Realignment of a boundary.
AND/ OR

(1 Preliminary approval -provide details below eg. stages 2, 3 and 4: freehold subdivision of 75 lots,
realignment of a boundary, creation of an access easement)

 

 

The subject land

The information requested in Q2 & 3 is
necessary for statistical and planning
purposes. :

 

Number of existing lots: 2 |

 

Total area of land in application: (if staged, total area of the land in this stage)
[ 1207sq.m.

 

How the subject land is identified in the planning scheme: (name the zone, precinct etc.)
| Semi-Attached Housing Zone |

 

Current use of the land: (if vacant, atso identify the previous use)
| Vacant

 

 

Are there buildings or structures existing on the land?
] No
(1 YES - complete Q7
Indicate which one of the following circumstances applies:
[All existing buildings and structures on the land will be demolished as part of the
development / redevelopment of the site; or

LD Some existing buildings and structures on the land are proposed to be retained as part of

the development / redevelopment of the site - indicate on the plans prepared in response to Question
6 above, those buildings or structures proposed to be retained

Existing services on the land:(eg. water & sewerage) - atfach plan identifying location if appropriate)
[ Water, sewerage, power & telephone. |

 

. Are there any existing easements over the land?

XINo

[YES - attach plan identifying easement location & purpose

 

The proposal!

The information requested in Q10-13 is
necessary for statistical and planning
purposes.

 

10. Total area of land in the development permit minus any balance area

1
1

| 1207sq.m. |

 

 

14. Number of proposed lots: 2 |

 

2. Number of additional residential lots proposed in development permit: (if applicable)

a a

 

Page 6

é
ny

INTEGRATED PLANNING ACT 1997 . . Part F, Version 2.0, 4 October 2004
13. Estate name & stage number: (applicable if the application is for a stage or stages of an overall subdivision
ce cece ee ce proposa) Ce ee ee nS MOF

14, Area of land to be contributed for community purposes: (if applicable)
[ nil

 

15. Length of new road to be constructed: (if applicable)

| nil |

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

OFFICE USE ONLY (applicable to assessment manager)

 

 

REFERENCE

DATE RECEIVED NUMBERIS

 

 

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997

oe

Rom 1 DavclyanatAvytection

 

eS

IDAS Assessment Checklist, Version 20, 2 April 2007

idas

 

IDAS Assessment

Checklist

(Formerly the “Referrals Checklist’)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 Juty 2005 to more accurately describe its function.

2, Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

oN OOP

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005,

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application,

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any applicable referral agencies for the application in the Acknowledgement Notice, The assessment manager will-also rely on this information when identifying if the

application triggers referral coordination?

9. — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au, Guide 25 explains the rote of the IDAS

Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from

www. lpa.gid.qov.au.

11, Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006. :

* Environmentally retevant activity
For more information refer to Gulde 4.

+ Unless you answered “none of the above” to 01,
the application requires assessment by the
administering authority®.

If an entity, other than the administering
authority, is the assessment manager for the
application, the administering authority isa
concurrence agency for the apptication in relation
to this matter.

4 Note: An appication involving ERA 19 and/or 20
* will also require completion of Part Kr of Form 1
for approval where an allocation under the Water}

 

Act 2000 is required.

PLEASE NOTE:

1.

The application involves: (tick applicable box/es)

(1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance

has not been made - complete Part G of Form 1

Ci (ii) a mobile or temporary ERA for which a code of environmental compliance has not been

made - complete Part G of Form 1
{iii) none of the above

OFFICE FUSE O ONLY (applicable to assessment manager}

Continued overeat

*

The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Chechlist (If applicable).

 

[ DATERECEIVED |

REFERENCE NUMBER/S

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the retevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and

Fisheries (for a delegated ERA).

Page 1

e

Page 8

INTEGRATED PLANNING ACT 1997

State-controlled road matters
~ For more information refer to Guide-3.

Unless you answered *none of the above" to Q2,
the application triggers referral to the Department:
of Main Roads (DMR) as a referral agency.

In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the IP Requlation will assist you to
determine where DMR is an advice or
concurrence agency for the application,

 

2.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick applicable bowes) oo. _
~ {J(i) development on land contiguous’ to a State controlled road and for -
CJ (a) material change of use assessable against the planning scheme;
(1 (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
(J (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)-
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
1 (ii) development on land not contiguous to a State-controlled road and -
(1 {a) material change of use -
« assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
[1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 () operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the |P Regulation and exceeding the thresholds set by
that schedule.
EX] (ili) none of the above

 

Clearing vegetation
For more information refer to Guide 12,

Unless you answered "none of the above" to Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
Ifan agency other than NRW is the assessment

; manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.
if you ticked Q3(i) ar (ii), your application requires;
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.

The application involves: (tick applicable box/es)
CI (i) material change of use -
(a) assessable against the planning scheme;
(b) on alot containing -
 acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and .
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

(iv) none of the above.

Ci)

(b)

CJ iii)

 

Strategic port land

For more information refer to Guide 14.

If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

It you ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

 

The application involves:

(] (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

LD (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

Ex] (iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-

controlled road.

Page 2

Page 9

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

Acid sulfate soils 5. The application involves development on land situated in an identified’ local government.area_ ___.
—~--—— ~ For: more information refer-to Guide 10:—~»--|- -and whiére thie surface of the land is: (tick applicable box)

Unless you answer "nore reer to 05, C1 (i) below 20m AHD8 and the development will involve the excavation of 1000m3or more of

Department of Natural Resources and Water soil or sediment at or below 5m AHD, or

(NRW). D (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more

Hf an agency other than NRW is the assessment of material

manager for the application, NRW is an advice .

agency for the application in relation to this w Ww) none of the above .

matter. . . . . wn .

Major hazard facilities or possible 6. Does the application involve a material change 0 of u use for a major hazard facility or possible

major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

For more information refer to Guide 17.” ® NO

Ifyou answered "YES to Q6, the application .

requires assessment by the Department of (2. YES - complete Part L of Form 1

Emergency Services (DES).

If an agency other than DES Is the assessment
manager for the application, DES is a
concurrence agency for the application in
_felation to this matter. :

Water related development under the 7. The application involves:

 

Water Act 2000 [1 operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a) - (f), refer (lick applicable box/es)

to Guide 15. For more information about item 5 .

(Q), refer to Guide 14 Does my application 0 (a) in a watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
| involve assessment of a referable dam? dam) - complete Part Ke, Ks, Ke, Ke, or Ko of Form 1 whichever is applicable;

Unless you answered "none of the above" to Q7, (1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by the .

Department of Natural Resources and Water Ks of Form 1,

“(NRW). C1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
lf an agency other than NRW is the assessment

anager forthe application, NRW by a water resource plan, for use for purposes other than stock and/or domestic
mi jer for the application, sa .
| concurrence agency for the apptication in USE - complete Part Ks of Form 1;

relation to this matter. (1 (d) fora subartesian bore, in certain declared subartesian areas, for use for stock

: . and/or domestic purposes - complete Part K; of Form 1;
C1 (e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ks of Form 1;

(1 (A) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1

(1 (9) for constructing a referable dam? or works that will increase the storage capacity .
of a referable dam by more than 10% - complete Part Ks of Form 1; or

EX] (ii) none of the above.

Removal of quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse?

watercourse fequiring an allocation notice under the Water Act 2000?
For more Information refer to Guide 16. ® NO

ff you answered “YES" to Q8, the application

fequires assessment by the Department of [DYES - complete Parts Kr and G of Form 1

, Natural Resources and Water (NRW).

+ tfan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

5. The identified focal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Catoundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroach, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,

Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiara, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

The dectared ground water areas are listed in Guide 13 Development in 2 declared catchment area.

Referable dam is defined under the Water Act 2000.

9 Watercourse is defined in sch 10 of the IPA.

oe

- Page3

Page 10

INTEGRATED PLANNING ACT 1997
Operational work that ts tidal work or

- work in.coastal management district -

For more information refer to Guide 18. For
more information about prescribed tidal work in
local govemment tidal areas refer to Guide 24.

Unless you answered "none of the above” to Q9,

the application requires assessment by the
Environmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

Local goverment is the assessment manager
for all prescribed tidal work.

IDAS Assessment Checklist, Version 20, 2 April 2007
9. The application involves 3 operational work that is: (tick the applicable boxes)

‘Cy tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

D (ii) tidal work that is prescribed tidal work"' other than in a canal'2 -complete Part P of Form 1; oF

C1 (iii) carried out within a coastal management district under the Coastal Act and for ~ complete
Part M of Form 1 if any boxes (a) to (i) below are ticked.

(1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

(J (b) constructing a canal’? intended to be connected to tidal waters;

(C(c) constructing an artificial waterway;

(1 @) reclaiming land under tidal water;

(1 (e) disposing of dredge spoil or other solid waste material in tidal water;

(1 (f) _ interfering with quarry material on State coastal land above high-water mark;

(1 @) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

[J (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

[J (i) constructing a bank or bund wail to establish a ponded pasture on {and, other
than State coastal land, above high-water mark; or

KX iv) none of the above.

 

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidal work in
locat goverment tidal areas refer to Guide 24.
Unless you answered "none of the above" to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.

Local govemment is the assessment manager
for all prescribed tidal work.

 

 

10. The application involves operational work that is: (tick the applicable box/es)

(1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

J (ti) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; OF
C1 (iti) carried out within a coastal management district's under the Coastal Act and for -

(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Mof Form 1,

(2 (b) reclaiming land under tidal water - complete Part M of Form 1; or

[J (c) constructing a canal’2, if the canal is associated with reconfiguring a lot ~ complete
Part M of Form 1;

EX] (iv) none of the above.

 

Coastal management
For more information refer to Gulde 18.

, Unless you answered “none of the above” to
Q11, the appiication requires assessment by the
Environmental Protection Agency (EPA).
fan agency other than EPA is the assessment
manager for the application, EPA is a
Cancurrence agency for the application in
relation to this matter.

10 Tidal work is defined in sch 10 of the IPA.

 

11. The application involves: (tick the applicable box/es)

Li (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district’

Li (ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2

Ci (ili) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

Li (iv) reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canai'2 - complete Part M of Form 1

DXi (v) none of the above

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parlly within a local government tidal area.
12 Canal means canal as defined under tha Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and inctudes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is assoclated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Development within the limits ofa =| 12. Does the application involve development below high water mark'8 and within the limits of a.port._._--
PORE me tre em ~ undér thie Transport infrastructure Act 1994?
For more information refer to Guide 18. For & NO -
information about prescribed tidal work refer to a
Guide 24. (C1 YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work
Ifyou answered “YES" to Q12, the application’
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is ~
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.
1 In all other situation the Port Authority is an
advice agency.

 

 

 

Marinas . ‘113. Does the application involve operational work that is tidal work for a marina’9 with more than 6
i For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
* tidal work refer to Guide 24. The local &INo
* govemmentis the assessment manager for ait
prescribed tidal work.

Hf you answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescue

 

 

LD YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Service as an advice agency, _ poe pte in ~
"Tidal works in strategic port land tidal/ 14. Does the application involve tidal works within a strategic port land tidal area20?
sareas XI NO

For more information refer to Guide 18,
* Unless you answered *NO” to Q14, the relevant
Port Authority is the. assessment manager for the
” application and the Environmental Protection .

Agency (EPA) and Queenstand Transport (Q (aq)
. 8f@ Concurrence agencies for the application, °

[YES - complete Part M of Form 1

 

Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?

“Ifyou answered “YES" to Q15, the application & NO

, tigers referral to the Queensland Heritage
Couneil as concurrence agency for the (71 YES - complete Part C of Form 1
application.

: as . 15(b)The application involves: (tick applicable boxes}
ISDA te applecton rvohes tetera ioe [1() — amateriat change of use assessable against the planning scheme and the lot shares a
: Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the application Heritage Act 1992;

CO (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
Bd (i) none of the above.

Declared catchment areas 16, The application is in an area declared to be a catchment area under the Water Act 2000 and

 

For more information, including a list of the involves: (tick the applicable box/es)
declared catchment areas within Queenstand, r ee ., . ee
"fefer to Guide 13. LJ (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
, Unless you answered “none of the above" to LI (ii) development assessable against the planning scheme involving the establishment or
"016, the application requires assessment by the expansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources and Water . an . .
(NRW). out an environmentally relevant activity under the Environmental Protection Act 1994;
If an agency other than NRW is the assessment (iii) none of the above

+ manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page §

Page 12

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

Contaminated land 17. The application im involves: (tick the applicable bowes) _ nn
— Applications involving material change of use|" ~~ [1 (i) reconfiguring a fot for which all of part of the premises are -—
cd! ing a lot may trigger this
ane of reconfiguring catia chile (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
‘For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered ‘none of the above” to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). If an an
agency other than EPA is the assessment activity, or . . .
manager for the application, EPA will be a {b) in an area for which an area management advice has been given for unexploded
concurrence agency for the appfication in ordnance - complete Part N of Form 1
relation to this matter. . . . .
C (i) a material change of use —
‘ (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
‘ for which an area management advice has been given for unexploded ordnance -
: complete Part N of Form 1
(iii) none of the above / . ;
Electricity infrastructure 1118. The application involves: (tick the applicable box/es)

* For more information refer to schedule 26f the IP
Requlation. .
Unless you answered “none of the above” to
Q18, the application triggers referral to the

* agency to which the easement is granted in
favour of as advice agency.

(CO (i) reconfiguring a lot where any part of the lot is -

subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 40m of a substation site;
(v) none of the above. _

Di)

Ci

Ow)

 

: Land designated for community

‘Infrastructure
Applications involving development on land

| designated for community infrastructure may
tigger this referral. .

"For more information refer to schedule 2 of the
JP Requtation,

lf you answered “YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
NO
(Yes

Page 6

Page 13

 

o ty

INTEGRATED PLANNING ACT 1997 _IDAS Assessment Checklist, Version 20, 2 April 2007

 

SEQ Regional Plan 20. The application involves (tick applicable bowes)- ee
— for more information refer to'sctiedule 2ofthe |" ~~ [_] (i) @ material change of use of premises —

equi in. . . . .
Refer to Chapler 2, part 5A and schedule 10 of {a) ina Major Development Area in the Urban Footprint for -
the Integrated Planning Act 1997, and schedule OO ()  anurban activity- -
Zofthe R Provisions for relevant + . . .
sae ons me OD in an area included in a structure plan where the IPA, section 3.1.6
Uniess you answered “none of the above" to applies;
2s, whe aplication requires aseessment by the (2 inanarea not included in a structure plan where -

ict aq . . . . . .

2 « the IPA, section 3.1.6 applies to the application for the material change
of use; or

« the premises exceeds 10,000m2; or

the gross floor area (GFA) on the premises will exceed 10,000m2; or

¢ impact assessment is required under the relevant planning scheme
C1 (ii) intensive animal husbandry, or

OO (ii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -

O (i) an urban activity and not specified in section 2.10(2);
(1 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
1 (ii) intensive animal husbandry
LD (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
{b) not specified in section 3.1(2).
: LX (ii)none ofthe above
{Fisheries matters 21. The application involves: (tick the applicable box/es)

« For more information refer to schedule 2of the IP CI (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;
Regul lation. - 5 . . sae 5
Unless you a none of the above’ to Di iii) assessable operational work that is the construction or raising of a waterway barrier -
Q21, the application requires assessment by the complete Part Os of Form 1;
Deppeirent ol Pans ates ate stata Dili) assessable operational work completely or partly within a declared fish habitat area-
\fan agency other than DPI&F is the assessment complete Part Oz of Form 1,
manager for the application, DPI8F is a C1 (iv) assessable operational work that is the removal, destruction or damage of a marine

. Concurrence agency for the application in . .
felation to items (i) — (iv) and an advice agency plant - complete Part O2 of Form 1,

+ in relation to item (v). (J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
. declared fish habitat area;

XI (vi) none of the above. .

 

Page 7

Page 14

INTEGRATED PLANNING ACT 1997
Integration of land use and public
-transport -~ -.---- ---
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the |P Regulation.

Unless you answered “none of the above’, the
application triggers referral to QT as a

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—_

(1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

 

concurrence agency. O (ii) reconfiguring a lot—
C1 (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
(1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
LJ {ce} on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
LJ (¢) for aresidential purpose within the 25 ANEF contour for an airport;
Oi (e) for a residential purpose resulting in 100 or more allotments.
LD (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
Li (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(i (b) _ will result in work that encroaches into an airport's operational airspace.
1 (iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—

For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Regulation.
Unless you answered "none of the above’, the
application triggers referral to QT as a
concurrence agency.

(1 () a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

(1 (i) reconfiguring a fot—

(i {a) _ ontand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement; .

[1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,

[1 (©) __ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

[1 (@) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

Ce) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

(CO () for aresidential purpose resulting in 100 or more allotments.

C1 (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

Ci (a) _ is completely or partly within rail corridor land or commerciat corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

[1 (b) is completely or partly within future railway land, or a railway tunnel easement;

Ci (©) — abuts rail corridor land, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
LX] (iv) none of the above.

 

Moonie to Brisbane pipeline

For more information refer to schedute 2of the IP
Requiation.

* Unless you answered “none of the above’, the
appfication triggers referral to the holder of
pipeline licence No 1 issued under the Petrolsum
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

Q (ii) reconfiguring a tot

CO (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

DX] (iv) none of the above.

Page 8

Page 15

INTEGRATED PLANNING ACT 1997

Koala habitat area

___, For.more information, refer-to-Guide-26 and

schedule 2 of the IP Requiatian,

Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

Wild river area

For more information, refer to Guide 27

Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agéncy will assess your application against the
Wild Rivers Code, or if the proposed
development is ‘prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wit
fiver area because the application cannot be
accepted by the assessment manager.

IDAS Assessment Checklist, Version 20, 2 Apri! 2007
25. The application involves: : (lick the applicable box/es)\— oe

Oa material c change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

C1] (a) clearing of native vegetation over an area greater than 2500m?;

C1 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(1 (c)_ an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;

CJ (@) extracting gravel, rock or sand from an area greater than 5000m?;

Oe) excavating or filling an area greater than 5000m2,

(1 (f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.

() (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in —

C1 (a) anincreased number of lots;
[1 (b) clearing of native vegetation over an area greater than 2500m?.

D (ili) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

LL (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

C1 (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
C1 (c) excavating or filling an.area greater than 5000m?.

EX] (v) none of the above.

26. Does the application involve development in a wild river area declared ‘under the Wild Rivers Act
2005?

i NO
O YES

 

Preliminary Approval

if you answered YES to Q27, the application
triggers referral to the Department of Local

27. Does the application involve a development for which preliminary approval is 5 sought under
a 3.1.6 of the integrated Planning Act 1997?

 

Domestic activity means the construction or use
of a Single residence on a tot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.

Note: Wetland is defined in the eg
Planning Regulation 1998.

Unless you answered “none of the above” to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.

 

Goverment, Planning, Sport and Recreation as X] NO

_ an advice agency. . 5 YES

Wetlands 28. The application involves: (tick the applicable boxes) -

Ci (i) amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;

Oi (il) reconfiguring a fot -

{n or within 100m of a wetland that will result in
LC (a) more than 10 lots being created; or
LJ (b) lots less than 5 hectares;

(iii) none of the above

Page 9

Page 16

can

INTEGRATED PLANNING ACT 1997 7
‘Conservation Estate

Urban purposes is defined in the Integrated ~
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and. commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes”,

Unless you answered “none of the above” to
Q29, the application invotves referral to the
Envisonmental Protection Agency as an advice
agency for the application.

 

29. The application involves: (tick the e applicable box/es)—

“tT on ‘a material ‘change ge of use for urban 1 purposes thats is in or within 100m of any of the
following -

(J (@) a protected area, forest reserve, critical habitat or area of major interest under

the Nature Conservation Act 1992;;

oO

IDAS Assessment Checklist, Version 20, 2 April 2007

LJ (b) a State forest or timber reserve under the Forestry Act 1959;
(©) amarine park under the Marine Parks Act 2004;
[1 @) arecreation area under the Recreation Area Management Act 1988;
CL (e) aworld heritage area listed under the World Heritage Convention;
(1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
D (ii) reconfiguring a lot if -
Oi (a) any part of the lot is situated i in, or within 100m of, any of the following —
a protected area, forest reserve, critical habitat or area of major

interest under the Nature Conservation Act 1992; .

Oi)
Diii
OW
Ow

a State forest or timber reserve under the Forestry Act 1959;
a marine park under the Marine Parks Act 2004;
a recreation area under the Recreation Area Management Act 1988;
a world heritage area listed under the World Heritage Convention;

Brisbane forest park under the Brisbane Forest Park Act 1977; and

Page 10

(1 (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than 5ha;
BX (iil) none of the above.

Page 17

eee
INTEGRATED PLANNING ACT 1997

DAS Assessment Checklist, Version 20, 2 April 2007

 

 

_Wild River Area. :
it ‘the "responsi ity ‘of the applicant to
determine If the development is proposed in
a wild river area. :

Information about wild river areas including the
geographical location and position of
+ Management areas in relation to properties, can
4 be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.ald.gov.au or
, contacting the department by email on: ~
. wild. rivers@nrw,qid.gov.au
Note on Referrals

* Referrals for development in a wild river area
- (other than for agricultural activities and animal
* husbandry activities) are not changed from the
_ 6xisting referral arrangements,

‘Notes on development assessable .

_ against the Wild Rivers Code

For information regarding development in a wild:
fiver area, see the relevant wild river declaration
1 and Guide 27. The relevant wild-river

declaration will provide information regarding

which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development'are exempt

” from wild river requirements.

. The notes on development assessable against
the Wild Rivers Code in this section of the °
checklist provide some guidance however this,
_ May vary between wild river areas. The relevant
! declaration will pravide the information applying
to each wild river area.

+ Applications for some new developments will not
| be accepted if the proposed developmentis in a
high preservation area (HPA), Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
* Wild Rivers Code where indicated in a relevant
wild fiver declaration.

Environmentally relevant activities
. (ERAs) in a designated urban area

Ifyou answered YES, your application for an
4 ERA is exempt from any wild river requirements
+ and provided there are no other aspects of this
: development that require assessment against
, Wild rivers, you do not need to complete the
‘remaining questions in Section 2.

"Ifyou answered NO to Q2, ‘please complete the
| femaining questions in Section 2.

1.

2.

Which wild river area is the development proposed i in?

 

 

 

 

The proposed development is to be located in: (tick the applicable box/es)

(Ji) ahigh preservation area (HPA);
(7 ii) a preservation area (PA) :

(7 iti) a wild river floodplain management area (FMA);

(J iv) a wild river nominated waterway;
(C1 v) a designated urban area (DUA).

ot

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14; or

il) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
oO YES (ensure you have completed Part G of Form 1)

C1no

 

' Clearing native vegetation

“ IYES, there are a limited number of purposes
for which an application to clear native

* vegetation may be accepted in a HPA. See
Guide 27 for a {ist of relevant purposes for

, which an application may be made in a HPA.

Hf YES and you ticked Q4 box i) the application

| May be made and is assessable against the Wild
* Rivers Code. if YES and you ticked Q4 box ii)
the application will nat be accepted.

- Note: ff clearing native vegetation is in a PA,
there are no wild rivér requirements and
provided there are no other aspects of this
development where wild fiver requirements _
apply, do not complete the remaining Guestions
in Section 2.

 

3.

4.

Is the application operational work for clearing native vegetation in a HPA?
Oo YES (ensure you have completed Part J of Form 1)

CI no

If YES, is the clearing?

Oy Clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered

area of agriculture in a HPA (see Guide 27); or

C1 ii) in aHPA outside a registered area of agriculture?

Page 11

 

Page 18

a

va

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal

-—. -Mmanagement districts and-fish- habitat

areas

tf you answered YES to Q5, and ticked any

, boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

If you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Nate: If specified works are proposed in a local -
govemment area, itis prescribed tidal work — the
felevant locatgovernment will be the
assessment manager with the EPA as a
concurrence agency

Ifyou answered YES to Q5, and ticked box ii) or
a us Q6, your application requires referral to

ty you answered NO: to Q§ and ticked box j) in
* Q6, the application will not be accepted. .

If you answered NO to Q5, ticked box ii} in Q6
and the development is necessary to install.
authorised works or infrastructure where a
development permit is not required, or if a
fequired permit is held, the application must be
assessed against and. must comply with:the Wild
Rivers Code. Applications for purposes other
than specified works or as described: above will
not be accepted,

Hyou answered NO at Q5 and ticked box iii) in
Q6, the application may ba made if the works are
-in aPA. These applications must be assessed
against and must comply with the Wild-Rivers
‘Code. The application will not be accepted if the
development fs proposed to be located in a HPA.

For more information about ‘specified works refer
to Guide 27
Residential, commercial or industrial
development
(fyou answered YES to Q7, your application is

not subject to wild river requirements. Provided
there are no other aspects of this development

* that requite assessment against the relevant wild

. fiver deciaration or Wild Rivers Code, you do not
- need to complete the remaining questions in
Section 2.
lf you answered NO to'Q7 and ticked either box
- i) or ti) in Q8, the assessing agency is the
felevant local goverment. The application must
be assessed against and must campy with the
Wild Rivers Code,

Animal husbandry activities

 Ityou answered YES to Q9 your application

fequires assessment against and must comply

with-the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry

activities will not be accepted if proposed ina

HPA. For more details and a definition of animal

« husbandry activities see the Wild Rivers Act
20085 and refer to Guide 27.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

|5. Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide.27. __
~——~~Development ina wild tiver area)

Cino Clyes

6. The application is for one or more of the following:

{1 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); Or

(7 ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1), Or

Oo iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

7. _ |s the application for residential, commercial or industrial development in a designated urban

area?
CINo Lyes

8. If NO, does the application for residential, commercial or industrial development involve:

(Ji) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

9. Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

, CIJNO | YES (ensure you have completed Part R of Form 1)

 

: Agricultural activities

Hfyou answered YES to Q10, your application
:fequires assessment against a and must comply
. With the Wild Rivers Code,
The assessing agency is NRW.
Note: Applications for agricultural activities wilt
not be accepted if proposed in a HPA. For more
: details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
2.

The production of fodder in a PA, and pasture
improvement using tow impact soil disturbance
* techniques is not an agricultural activity as

- defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

L)no

{71 YES (ensure you have completed Part Q of Form 1)

‘11. If YES is the application for:

oO i) a material change of use; or
oO ii) operational works.

Page 12

Page 19

*

we
a rene

INTEGRATED PLANNING ACT 1997

“ Works that take overland flow water

vit arta an
—: The retevant wild river declaration will state” ~~"

warks that take overland flow water are either
self assessable or assessable, or are exempt
from wild fiver fequirements.
Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the-code.
Mfyou ticked Q13 ii) an apptication is not required
to be made however the works must comply with
the relevant setf-assessable section of the Wild
Rivers Code, otherwise the works become

$ assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code.
and must comply with the code.
tfyou ticked 013 iii) your application is not

7 Subject to wild river requirements. «

Applications for development that is ather than
, that stated to be assessable, self-assessable or
exempt will not be accepted.

. Works that interfere with overland
* flow water :

j The retevant wild river declaration will state

{ Works that interfere with overland flow water that

are either self assessable, assessable or exempt
from wild river requirements.

\fyou ticked Q15 i), your application must be -
> assessed by NRW against the Wild Rivers Code:
* and must comply with the code.
Ifyou ticked Q15 ii) an application is not required
4 to be made however the works must comply with
, the relevant self-assessable section of the Wild
_ Rivers Code, otherwise the works become
assessable development for which an application
“is required and.must be assessed by NRW
” against the relevant part of the Wild Rivers Code
+ and must compty with the code.
y lf you ticked Q15 fil) your application is not
Subject to wild river requirements.
Appiications for development that is other than
that stated to be assessable, self-assessable or
exernpt will not be accepted.

: Waterway barrler works

, Applications for building or raising waterway

* barrier works in a HPA will not be accepted.
Ifyou answered YES to Q16, your appfication

‘ must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve works that take overland flow water in a HPA or an FMA? __

S—ONo <o

13. If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works
(J ii) seif-assessable works
C1 iii) exempt works

 

im YES (ensure you have completed Part Ke of Form 1)

- 114. Does the application involve works that interfere with overland flow water in a FMA?

mie

15. IF YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
L ii seif-assessable works
(iil) exempt works

LJ YES (ensure you have completed Part Kio of Form 1)

16. Does the application involve building or raising waterway barrier works in a PA?
Oo NO oO YES (ensure you have completed Part Os of Form 1)

 

Aquaculture (non ERA)

; Applications for aquacutture in a HPA will not be
accepted,

Ifyou answered YES to Q17, your application
, Must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Works that interfere with water in a
watercourse

} Note: If the.development is proposed in a HPA,
applications for all works that interfere with water
* in a watercourse (including dams or weirs,
Stream realignment or stream diversion) will nat
«be accepted. .
tna PA, applications for instream dams'and
weirs may be accepted in nominated waterways.
If you ticked box ii} in Q19, your application will ,
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
fiver requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website

www. new.didl.gov.aut or contacting the
department by email on:

17. Does the application involve aquaculture in a PA?

(no

(C1 YES (ensure you have completed Part Os of Form 1)

18, Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

Ono

19. IFYES,
(.] i) The application is for an instream dam or weir; or

(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

O YES (ensure you have completed the relevant Part K of Form 1)

 

_ Wild. [email protected].

Page 20

i”

cm
ain

INTEGRATED PLANNING ACT 1897
Environmentally relevant activities

-— +Most applications for an ERA ina HPA will not"~~

* be accepted. Applications which may be made
tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)

Ifyou answered NO to Q20 you do not need to
complete Qs 21-24.

Ifyou answered YES to Q20 and the
, development is ina PA, your application must be
“ assessed by the administering authority?"
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river -
requirements (see Q2). You will be ableto ~
determine if an application will not be accepted

i for the development by answering Q21 - Q24:

Ifyou answered NO to Q21, you do hot need to
complete Q22. If you answered YES: to Q21 you
‘are required to complete 022.

iff you answered NO to 022, the application wil .

_ Not be accepted. If you answered YES to Q22,

“ the application must be assessed by NRW

” against the Wild Rivers Code and.must comply
with the code.

Ifyou answered NO to Q23 and the development!
is proposed in the HPA the application will not be
: accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
{f you answered YES to Q24 the application will
not be accepted. If you answered NO to 024,
: your application must be assessed by NRW °
: against the Wild Rivers Code and must comply
‘ with the code.
Exempt ERAs in a designated urban
area

- Ifthe development is proposed in a designated
urban area there-may be no wild river

} requirements. See Section 2 Q2.
Note: Ail apptications that can be accepted must
be assessed against and must comply with the
. Wild Rivers Code (other than exempt ERAs it ina
designated urban area).

«Documentation .
Hf you answered NO to 025, your application
May be subject to an information request and

} processing of the application may be delayed,

2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

 

20.

21.

22.

28.

Does the application involve 2 an ERA?

LINO

IDAS Assessment Checklist, Version 20, 2 April 2007

oO YES (ensure you have co completed P Part Gof Fort)

Is the application for an ERA 20 instream?

(no

LJ Yes

ls a quarry allocation notice held for the proposed ERA 20 instream?

CINo

Clyes

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in

the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)

ie)

|s the proposed development for ERA 20 (out of stream) and;

~ inaFMA; and

LJ Yes

— not low impact; and
— not for a residential complex i in. the area, or for specified works.

[Jno

Cl Yes

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

LINo

CO yes

Page 14

Page 21

a re

INTEGRATED PLANNING ACT 1997

 

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

SECTION 3 = BUILDING REFERRALS (completion tiot mandatory) ~~

 

 

 

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally
For more information go to schedule 2 table t and
schedule 2A of the IP Requlation.

Assessment period 15 days. No response is a
deemed refusal.

1.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the /ntegrated Planning Regulation 1998
(IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.

 

 

 

 

 

 

 

 

 

 

 

 

 

Fira safety for budget accommodation |2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work

hn noe information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation

Reaulation building,

Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

For mora information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting.

Regulation

Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a

For more information go to schedule 2 of the IP: tetail meat premises.

Requiation

Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application

For more information go to schedule 2 of the IP involves a private health facility.

Regulation

Workplace area less than 2.3m?" 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the

For more information go to schedule 2 of the [IP application involves a work place area less that 2.3m2,

Regulation .

Land contiguous to a State-controlled | 7, An application may trigger referral to the Department of Main Roads as a concurrence agency or advice

road agency if the application involves land contiguous to a State-controlled road.

For mora information go to schedute 2 of the |P

Regulation,

Pastoral workers accommodation 8. Anapplication may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

For mora information go to schedule 2 of the [P if the application involves pastoral workers accommodation.

Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the

For more information go to schedule 2 of the | application invalves a childcare centre.

Regulation

Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency

For more information go to schedule 2 of the |P if the application involves land completely or partly seaward of a coastal building line?2.

Regulation

Heritage 11, An application may trigger referral to the Heritage Council as a concurrence agency if the application

For more information go to schedulé 2 of the |P involves a heritage registered place.

Regulation .

Fisheries matters : 12, An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a

For more information go to schedule 2 of the {P concurrence agency if the application involves assessable building work in a declared fish habitat area; or

Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area,

Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application

transport involves existing or future public transport corridors, or airport operational airspace”,

For more information go to schedule 2 of the IP

Regulation

Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application

For more information go to schedute 2 of the |P
Regulation

 

Involves future railway land,

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.

 

 

Amenity and aesthetic impact of
particular building work for single
detached class 1 building or class 10
building or structure

For more information go to schedule 2 table 1 of the
IP Regutation,

Assessment period 15 days. No response is a
deemed approval.

 

15.

An application will trigger a referral to the local government if it is :
* fora single detached class 1 building or class 10 structure; and

« the local government has declared by resolution the following:

— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and

— the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995,
2 Operational airspace is as defined in State Planning Poficy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities”.

Page 15

Page 22

 

Aue o

INTEGRATED PLANNING ACT 1997

 

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

desigriated rainwater tank area

For more information go to schedute.2 table 1 of the
IP Regulation and the QOC part 25.

Assessmént period’ 15. days. No response is a
deemed refusal.

 

 

Whether particular buildings may be__| 16. _An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a_|

occupied for residential purposes Teferral to the local government as the concurrence agency.

For more information go to schedule 2 table 4 of thé

(P Regulation,

Assessment period 15 days. No response is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

iP Requtation. 18. An application may trigger referral to the local goverment as the concurrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 19. An application may trigger referral to the local goverment as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland

, Development Code, part 11 or 12.

Fire safety In particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2table 1 of the been completed.

IP Regulation,

Assessment period: 15 days.’ No response isa *

deemed refusal,

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services - building work

For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and

IP Regulation and the QDC part 15. the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days, No response isa

deemed refusall,

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

AP Regulation and the QDC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days. No response isa

deemed refusal,

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For more information go fo schedule 2 table 1 of the

Assessment period 5 days, No response is a

| deemed refusal.

Building work for rainwater tank in | 24. An application may trigger referral to the local goverment as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

« Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 16

 

Page 23

Max Watterson_& Associates_ = =

Consulting Surveyors & Development Consultants

 

 

ABN 59 847 644 252

PRINCIPAL
MAXWELL L . WATTERSON Cadastral Surveyor (Qld)
B. Surv (UNSW), M.1.S.Aust.-

(formerly Clement, Reid & Watterson)

10 Maple Street,

(RO. Box 639) COOROY 4563

Ph: (07) 5442 6121

Fax: (07) 5442 5125

Email: [email protected]

 

 

‘REPORT To ACCOMPANY. DEVELOPMENT APPLICATION FOR
‘ RECONFIGURATION OF LOTS . .

 

 

ADDRESS:

PROPERTIES:

APPLICANT:

PLAN OF DEVELOPMENT:

DATE:

80 & 82 TINGIRA CRESCENT, SUNRISE
BEACH

LOTS 22 & 23 ON RP126837

J.G. & S.P. REID

07/2373A |

13" APRIL, 2007

 

Page 24

 

1. SITE

1.1. PROPERTY DETAILS: —
Description: Lots 22 & 23 on RP126837
Noosa Plan Zone: Semi-Attached Housing

Locality: Eastern Beaches

Overlays: Natural Hazard — Landslide Hazard Area and Medium Bushfire
Hazard Area.

South East Queensland Regional Plan: Urban Footprint

1.2. SITE DESCRIPTION

The subject properties are located at the north-eastern intersection of Tingira
Crescent and Sobraon Street. The lands contain a total area of 1207m’.

The properties are vacant.

Water, sewerage, power and telephone services are connected to the properties.
Both Tingira Crescent and Sobraon Street are good quality bitumen roads with kerb
and channelling in place.

The properties are undulating and slope down to the north-east at approximately
22%. a

The property is generally covered by native vegetation with few significant trees.

2. PROPOSAL

It is intended to realign the common boundaries of the subject 2 lots as shown on the
Plan of Development.

The new boundary between the original Lots 22 and 23 has been relocated so that
the lots now have frontage to Sobraon Street and the long axis of the lots is east to
west.

The realignment of the lots improves the amenity of the Lots by:

Creating the frontage of the lots on Sobraon Street, which is a cul-de-sac.
Providing an easterly outlook.

improving the solar potential of the future houses.

Increasing the availability of prevailing breezes to the future houses on the
Lots. .

The realignment has no impact upon the amenity of the adjoining properties.

Page 25

3. SOUTH EAST QUEENSLAND REGIONAL PLAN

The application for the Reconfiguration of Lots that create the same number of tots is
permitted under the provisions of the Regional Plan.

4. NOOSA PLAN

4.1 Specific Outcomes and Solutions for the Reconfiguring a Lot Code

Lot Size and Dimensions

 

a) Lots have the appropriate area and

dimensions to provide for—

a) the intended use and, if not intended to be
used by the Council or State for community
infrastructure, conservation purposes or
public utilities including road widening are
not less than the minimum sizes specified
in Table 14-62 - Minimum Allotment Areas;
and

b) if for residential development—

i) a house site area of not less than
that specified in Table 14-63 and

ii) if not within a sewerage service
area, an effluent disposal area;

c) _ siting and construction of buildings to
minimise risk of soil erosion, landslide,
flooding and bushfire;

d) _ siting and construction of buildings to
minimise detrimental impacts of effluent
disposal and water quality impacts;

e) retention of natural environmental values,
including native vegetation;

f) retention of cultural features and protect
views to cultural features; :

g) minimisation of earthworks or retaining
walls associated with building construction
on steep slopes;

h) _ private and public open space and on-site
landscaped areas; and

i) convenient vehicle access and on-site
parking, loading and manoeuvring areas.

OR

O02 If for community title subdivision—lots have

the appropriate area and dimensions to provide

for the intended use and—

b) __ if for Detached housing, are not less than
the minimum sizes specified in Table 14-
33; or

c) _ if for other residential uses are not less
than 200m?

Table 14-62 of the Noosa Plan provides a
minimum lot area of 800? for land in the
Rural Zone.

The original lots do not have areas that
comply with the prescribed minimum,
therefore it is not possible to comply with
the 800m? minimum requirement.

The proposed Lots do on increase the
potential of soil erosion, landslide, flooding
or bushfire.

The proposed lots reduce the potential for
destruction of the significant trees on the
site by providing building areas remote for
the trees.

 

Noosa North Shore Locality

 

O3 No additional lots are created within the
Noosa North Shore Locality.

Not applicable.

 

‘Lake Macdonald Water Supply Catchment

Area: -

 

04 No additional lots are created within the
Lake Macdonald Water Supply Catchment

 

Not applicable.

 

 

 

Page 26

Seu Lim Ol cee titsy

 

 

  

SCE

 

   

‘Lot layout:

 

 

 

O5 Subdivision of land for residential
development provides for a neighbourhood with a
strong and positive identity through—

legible streets and open space networks;
integrating prominent site features,
including landmarks, native vegetation and
views into the design;

the location of community, retail and
commercial facilities at focal points either
within convenient walking distance for
residents where the development is urban
settlement or within reasonable vehicular -
proximity;

the location of lots intended for urban
settlement within proximity of retail and
commercial facilities;

shared use of public facilities by adjoining
communities;

enhancement of personal safety and
minimisation of potential for crime,
vandalism and fear by maximising
opportunities for casual surveillance of
public spaces; and

g) _ establishment of a sense of place.

qd)

The proposed new lots face Sobraon
Street, which is a cul-de-sac.

This increases the amenity of the lots by
providing availability of access to the road
system not directly onto a through road.

This also provides a safer environment for
the habitants.

 

O6 House site areas are—

a) located at least 50m from any land including
within a national park, conservation park, state
forest reserve, nature refuge, coordinated
conservation area or wilderness area; and

b) not located on steep slopes.

The proposed house site areas of new Lots
1 and 2 are in excess of 50m from any
Reserve,

 

07 Lots for residential development are
designed to ensure variety in residential
streetscapes.

Not applicable.

 

 

O8 The street network—

a) has design features, which convey the
primary function of each type of street and
encourage driver behaviour, speeds and
traffic volumes that are safe and
appropriate to that function;

provides a high level of internal
accessibility both within the site and to
external sites and appropriate external
connections for vehicles, pedestrian and
cycle movements;

deters through-traffic from residential areas
and creates safe conditions for local road
users, pedestrians and cyclists;
incorporates street junctions and access to
lots that are located and spaced to facilitate
safe and convenient vehicle movements;
provides for street widths and lengths that
optimise the cost effectiveness of the
network and the provision of public utilities;
provides for road reserve widths not less _
than the minimum identified Section 2.3 of
PSP5 Engineering Design Standards —

f)

 

No new roads are required.

 

 

Roads, Drainage and Earthworks;

Page 27

SOU

g) . minimises the extent of earthworks
required by being sympathetic to the
terrain;

h) has no significant adverse effects on
habitat corridors or areas of significant
native vegetation;

i) does not create noise attenuation
difficulties;

j) incorporates pedestrian and cyclist
crossings at intersections or where
required to access high activity nodes and
public transport;

k) has regard to the potential for conflict
between vehicles, pedestrians and cyclists;
and

\) incorporates on-road cycling facilities.

Solutions

 

O9 The development contains a pathway

system that encourages walking and cycling and

provides a safe environment for users, and is--

a) a stable, smooth surface, including across
driveways, sections and joins;

b) easily maintained;

c) of a width and longitudinal gradient to cater
for projected usage

d) inclusive of clear sight-lines for safe use;

e) be free of any obstructions such as
fences, signage and bollards.

Not applicable.

 

010 The subdivision layout is designed to
facilitate linkages with adjoining sites in the
immediate area.

Not applicable.

 

O11 Where the lots are to be used for Industrial
business or Commercial business uses, the
layout provides for appropriate buffer areas, to
mitigate possible impacts on nearby residences
or other noise sensitive uses.

Not applicable.

 

012 For lots in the Rural Settlement Zone—a
sealed access to the nearest urban settlement is
available.

Not applicable.

 

Water supply for fire fighting

 

013 An adequate and accessible water supply is is
provided for fire fighting purposes.

Each lot is connected to a reticulated

water supply

 

Energy efficiency

 

 

O14 The street and lot orientation facilitates the
construction of energy efficient buildings that
respond to the local climate conditions.

“AND

015 For residential development, the

subdivision design provides for the maximum

practicable number of lots with house site areas

that—

a) maximise solar access to the north in
winter;

b) minimise solar access to the east and west
in the summer;

c) maximise access to any prevailing summer
breezes; and

 

The new lot layout maximises the solar to
the north in winter and minimises the solar
access to the east and west in summer.

The new lot layout also increases
exposure to the prevailing breezes.

 

 

Page 28

 

Specific Outcomes
d) minimise exposure to prevailing winter
winds.

ST CUe

 

Infrastructure

 

016 Each lot is capable of being serviced by

appropriate levels of—

a) water supply;

b) reticulated sewerage;

c) stormwater drainage;

d) power supply; and

e) — telecommunications;

AND .

017 The design and provision of public services

and utilities, including sewerage, water,

electricity, street lighting and telecommunication
services—

a) meets the needs of users;

b) — ensures health, safety and convenience of.
the community;

c) protects the natural environmental values
of the site and surrounds, including visual
amenity and native vegetation;

d) are cost effective over their life cycle;

e) minimises adverse impacts to the
environment (including the amenity of the
local area) in the short and long term; and

f) ensures that the existing systems are
upgraded or relocated to be capable of
supporting the proposed development;

AND

078 Essential public utilities are available and
maintain their function during flood events up to a
41% AEP (1:100 year AR?) flood event.

Alllots have water, sewerage, power and
telephone services available.

The proposal will require the extension of

the sewerage reticulation of approximately
17m across the eastern boundary of Lot 1

to Lot 2.

 

Electricity supply infrastructure

019 Uses and works maintain a safe distance
from electrical infrastructure including
substations, overhead power lines, power poles
and transformers.

Not applicable.

 

Earthworks and stormwater management

 

020 Stormwater run-off is managed so as not to
cause any adverse impacts on the built or natural
environment including changes in quality,
quantity or location of stormwater discharges.

Not applicable.

 

0217 Filling or excavation only occurs where it

does not adversely impact on—

a) watercourses, drainage lines and wetlands;
or

b) vegetation on land identified on Biodiversity
Overlay Maps OM1.1-OM9.1; or

c) water levels on properties elsewhere.

Not applicable.

 

Landscaping and visual amenity.

 

 

O22 Land development responds to the
distinctive landscape character of the site by
utilising the natural features of the site, which
include—

a) watercourses and drainage lines,

 

The natural landform and landscape are
not modified to accommodate the
development.

 

 

Page 29

Specific Outcomes Solutions

b) significant trees;

c) understorey vegetation;
d) rock outcrops; and

e) views.

 

 

023 Native vegetation, including individual

mature trees are retained, protected, maintained

and supplemented, with particular consideration

given to—

a) roadsides;

b) the amenity of adjoining land uses; and

c) the protection of environmentally sensitive
areas.

Not applicable.

 

024 Buildings and other structures do not have
a significant adverse impact upon the visual
amenity of surrounding areas.

Not applicable.

 

Open space

 

025 Public open space is design and located
to~
a) provide for a range of recreational settings
and accommodate adequate and :
appropriate facilities to meet the needs of
the community;

b) provide a range of safe and easily
accessible recreational opportunities for the
community, except where dedicated for
conservation purposes;

c) contribute to the legibility, accessibility and
character of the /ocality,

d) create attractive environment settings and
focal points;

e) facilitate appropriate measures for
stormwater and flood management,

f) enable the retention and protection of
significant vegetation, wetlands,
watercourses, drainage lines and other
native habitat areas, their associated
buffers and linkages/corridors and natural
and cultural features; and

g) becost effective to maintain.

AND

026 The natural environmental and cultural
values of land in the Open Space Conservation
Zone is not adversely affected by subdivision,
and land in freehold tenure in this zone is not
subdivided.

Not applicable.

 

027 Adequate land is provided for active
recreation and is of a physical standard and
condition suitable for the intended uses and is
not subject to physical or other constraints
including contamination, biophysical constraints
or legislative protection that would encumber it
use.

The proposed new lots contain sufficient
area for recreation.

 

Availability and protection of resources

028 Development does not limit the potential for
the utilisation of extractive resources by creating
conflicts of interest.

 

 

Not applicable

 

 

Page 30

 

Specific Outcomes
‘Road and rail corridors

NUL

 

O29 Lots for residential development are not
subjected to high traffic noise levels from the
major road network or rail corridors.

Not applicable.

 

Access easements

 

030 Access easements are in appropriate
locations for safe access and egress, and supply
appropriate widths and levels of service for the
number of vehicles that will utilise them.

No additional access easements are
proposed.

 

Traffic

 

031 Traffic generated by the development is
within the acceptable capacity of external roads
and does not have an adverse impact upon the
functioning of the road network.

No additional traffic will be generated by
the development.

 

Noosa Trail Network

 

O32 A comprehensive network of trails is
established incorporating road reserves, State
forests, Council owned land and private lands
consistent with the lifestyle and outdoor
recreation needs of the Shire’s residents and
visitors.

Not applicable.

 

033 The proposal does not have an adverse
impact on the Noosa Trail Network.

Not applicable.

 

Cooroibah Locality

 

Protection of existing residential amenity,
road safety and access points

034 The existing residential amenity of the
estate is maintained without impacting on the
natural landform and landscape;

AND
O35 The number of access points providing

access to lots from McKinnon Drive is
maintained or reduced.

 

Not applicable

 

 

4.3 Specific Outcomes and Solutions for the Natural Hazards Overlay Code

Landslide Hazard Areas

    

NYSE LCOS UES

Effects of use ~~

 

General

Development is located to ensure it does
not compromise the safety of people, property or
hazardous materials manufactured or stored in
bulk by increasing risk of landslide;

 

AND

The realignment of boundaries does not
increase the number of dwellings in the
landslide hazard area.

 

 

 

 

Page 31

NLL OLU ee nLiSs

Development, including accessways is
designed and constructed to—

a) minimise impacts on the natural landform;

b) minimise risk to people and property from
landslide;

c) avoid any potential instability and associated
problems, including long term stability of the
site and long term stability of the
development.

 

NOs)

The development has no impact upon the
landform.

 

Protection of Infrastructure and Community

Uses

01 Community Uses and Infrastructure

Uses, including that identified below, are able to

function effectively during and immediately after

landslide events—

a) Emergency service facilities;

b) Hospitais;

c) Education Type 4 uses, including stores for
valuable records or items of historic or
cultural significance; and

d) Service and utility uses, including electricity
substations, major electrical depots and
water treatment plants.

Not applicable.

 

Bushfire Hazard Areas

 

| Reconfiguring a Lot

 

General

O01 The safety of people and property are
maintained by avoiding increases in the number
of people living, working or congregating in areas
of high or medium bushfire hazard.

The proposal does not increase the
number of people living in an area of
bushfire hazard.

 

Firebreaks and fire access tracks

02 Firebreaks or fire access tracks provide—

a) adequate access for fire fighting and other
emergency vehicles; and

b) adequate width to minimise the risk of fire
crossover.

Not applicable.

 

Road network

03 Roads provide for the safe and effective
evacuation of users of premises and access by
Emergency services.

The local street network provides safe
and effective evacuation routes.

 

 

Lot design

04 Lot design and building siting minimises
bushfire hazard to people and property having
regard to slope, aspect, existing vegetation and
adequate separation from hazardous vegetation.

 

The proposed house site areas are
located adjacent to the roads.

 

 

Page 32

.

5. CONCLUSION

The proposal is a rationalisation of the boundaries of the subject lands and does not
impact upon the amenity of the local area.

The realignment of boundaries improves the amenity of Lot 1 as its size is currently
restrictive.

— p=

Max L. Watterson

yo eta.

Page 33

Plo | : 149 MAX WATTERSON
RP 126837 : . RP 130983 & ASSOCIATES

Surveyors &
Planners

Ph (07) 5442 6121
Fax. (07) 5442 5125
Email, [email protected]

BUP6 164

PARISH: WEYBA

=
oO
<
a
a
o
~”

COUNTY: MARCH

LOCAL GOVT: NOOSA S.C.

LOCALITY: SUNRISE BEACH

 

Scale: 1: 200 Plan 1 of 1

Doture AHD Date: 19/02/07

origins PM 44272
nom Rt 33.815

Cont. Int: 1.0m

purposes only and moy be subject fo chonge.

Dimensions ond areas shown hereon ore

TINGIRA | : . CRESCENT somone my end St fo yi

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0694 - Lot reconfiguration [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.