Skip to the record
Accept no substitutions.

Council archive · source document

07/0694 - Lot reconfiguration [As Published] · 152007.694

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Development within the limits ofa =| 12. Does the application involve development below high water mark'8 and within the limits of a.port._._--
PORE me tre em ~ undér thie Transport infrastructure Act 1994?
For more information refer to Guide 18. For & NO -
information about prescribed tidal work refer to a
Guide 24. (C1 YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work
Ifyou answered “YES" to Q12, the application’
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is ~
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.
1 In all other situation the Port Authority is an
advice agency.

 

 

 

Marinas . ‘113. Does the application involve operational work that is tidal work for a marina’9 with more than 6
i For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
* tidal work refer to Guide 24. The local &INo
* govemmentis the assessment manager for ait
prescribed tidal work.

Hf you answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescue

 

 

LD YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Service as an advice agency, _ poe pte in ~
"Tidal works in strategic port land tidal/ 14. Does the application involve tidal works within a strategic port land tidal area20?
sareas XI NO

For more information refer to Guide 18,
* Unless you answered *NO” to Q14, the relevant
Port Authority is the. assessment manager for the
” application and the Environmental Protection .

Agency (EPA) and Queenstand Transport (Q (aq)
. 8f@ Concurrence agencies for the application, °

[YES - complete Part M of Form 1

 

Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?

“Ifyou answered “YES" to Q15, the application & NO

, tigers referral to the Queensland Heritage
Couneil as concurrence agency for the (71 YES - complete Part C of Form 1
application.

: as . 15(b)The application involves: (tick applicable boxes}
ISDA te applecton rvohes tetera ioe [1() — amateriat change of use assessable against the planning scheme and the lot shares a
: Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the application Heritage Act 1992;

CO (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
Bd (i) none of the above.

Declared catchment areas 16, The application is in an area declared to be a catchment area under the Water Act 2000 and

 

For more information, including a list of the involves: (tick the applicable box/es)
declared catchment areas within Queenstand, r ee ., . ee
"fefer to Guide 13. LJ (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
, Unless you answered “none of the above" to LI (ii) development assessable against the planning scheme involving the establishment or
"016, the application requires assessment by the expansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources and Water . an . .
(NRW). out an environmentally relevant activity under the Environmental Protection Act 1994;
If an agency other than NRW is the assessment (iii) none of the above

+ manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page §

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0694 - Lot reconfiguration [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.