Skip to the record
Every meeting, every word.

Council archive · source document

07/0694 - Lot reconfiguration [As Published] · 152007.694

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Part F, Version 2.0, 4 October 2004

Form 1 Development Application

Reconfiguring a lot

 

 

 

Completion of all applicable questions on Part F is mandatory for all applications involving the reconfiguring of a lot (including freehold subdivision, community

title subdivision, subdivision by lease, efc.).

 

- Nature of the application

A development permit authorises. development
to occur, while a preliminary approval is a step
in the approval process and does not
authorise development fo occur.

1.

This application is for: (tick one (1) or both if applicable)

KX] Development permit - provide details below eg. stage 1: freehold subdivision of 25 lots, realignment of a
boundary, creation of an access easement)

| Realignment of a boundary.
AND/ OR

(1 Preliminary approval -provide details below eg. stages 2, 3 and 4: freehold subdivision of 75 lots,
realignment of a boundary, creation of an access easement)

 

 

The subject land

The information requested in Q2 & 3 is
necessary for statistical and planning
purposes. :

 

Number of existing lots: 2 |

 

Total area of land in application: (if staged, total area of the land in this stage)
[ 1207sq.m.

 

How the subject land is identified in the planning scheme: (name the zone, precinct etc.)
| Semi-Attached Housing Zone |

 

Current use of the land: (if vacant, atso identify the previous use)
| Vacant

 

 

Are there buildings or structures existing on the land?
] No
(1 YES - complete Q7
Indicate which one of the following circumstances applies:
[All existing buildings and structures on the land will be demolished as part of the
development / redevelopment of the site; or

LD Some existing buildings and structures on the land are proposed to be retained as part of

the development / redevelopment of the site - indicate on the plans prepared in response to Question
6 above, those buildings or structures proposed to be retained

Existing services on the land:(eg. water & sewerage) - atfach plan identifying location if appropriate)
[ Water, sewerage, power & telephone. |

 

. Are there any existing easements over the land?

XINo

[YES - attach plan identifying easement location & purpose

 

The proposal!

The information requested in Q10-13 is
necessary for statistical and planning
purposes.

 

10. Total area of land in the development permit minus any balance area

1
1

| 1207sq.m. |

 

 

14. Number of proposed lots: 2 |

 

2. Number of additional residential lots proposed in development permit: (if applicable)

a a

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0694 - Lot reconfiguration [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.