Council archive · source document
DEPH Referral agency response - OPW13/0451
Department of Environment and Heritage Protection _
l l ~I I ~ ~ I~ ,lil~ lr &Notice
Concurrence agency response
This notice is issued by the chie
Planning Act 2009.
Sunshine Coast Regional Council Rabtuvi Pty Ltd
Locked Bag 72 C/- The Jetty Specialist Pty Ltd
Sunshine Coast Mail Centre QLD 4560 2 Industrial Avenue
AUn: Mark Lewis CALOUNDRA QLD 4551.
AUn: Steve Belt
Our reference: SE961AP 1137 SOR/120284
)
(X’)
Bex: ..\~\.O..R:
.,
.........:9....". .- .
Re: Concurrence agency response .,- ..
oPvJ l~/04S1
1. Application details
Applicant: Rabtuvi Pty Ltd
Assessment manager ref: OPW13/0451
Date application referred to the concurrence agency: 21st June 2013.
Development approval applied for: Development permit
Aspect(s) of development:
Referral agency
Assessable development
reference
Operational work Tidal works. or
-
Sustainable Planning EHP ref. no. -
533139
development in a coastal management Regulation 2009- EHP Permit No.
district Schedule 7. table 2. SPCC05668513
item 13
Development description(s): Operational Works (Prescribed Tidal Works- Pontoon).
Property/Location description(s): 69 Wyuna Drive. Noosaville Lot 34 on N 10575
2. Concurrence jurisdiction
The concurrence agency response for the aspect of development involved with the application the
subject of this Notice is to tell the assessment manager as follows:
Conditions must attach to any development approval. and those conditions are attached to this
notice as:
i) EHP Permit SPCC05668513
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
\~
.
Notice
Concurrence agency response
Approved plans and specifications
Document no. Document name Date
JSP-SJ-25770 Rabtuvi P/L Lot 34 (69)Wyuna Drive Noosaville 14/03/2013
Site Plan, Layout & Water Allocation
3. General advice to assessment manager
Pursuant to section 334 and section 363 of the Sustainable Planning Act 2009, a copy of a decision
notice or negotiated decision notice issued by the assessment manager must be forwarded to the
referral agency for the relevant application. Please send a copy of the relevant notice to Ben Grant
12 First Avenue Maroochydore 4558 and an electronic copy to [email protected] state’s Native Title Work Procedures provide that responsibility for assessment of native title
issues for an I DAS application rests with the assessment manager.
~
Signature
II \~lllit:S Date
Delegate Enquiries:
Ben Sale Ben Grant
Department of Environment and Heritage Protection Department of Environment and Heritage Protection
Delegate of the administering authority Floor 6 Mike Ahern Centre
Coastal Protection and Management Act 1995 12 First Avenue
MAROOCHYDORE QLD 4558
Phone: 0754596133
Fax: 0754 596190
Email: [email protected]
Attachment(s)
Attachment 1 -EHP Permit Number- SPCC05668513
,;
Page 2 of 2 130408 EM700 Version 3a
. . . Department of Environment and Heritage Protection
Page 3
’J
Department of Environment and Heritage Protection _
Sustainable Planning Act 2009
1
EHP Permit number: SPCC05668513
Assessment manager reference (if OPW13/0451
any):
Date application received: 21st June 2013
Permit type: Concurrence agency response,
Decision: For a concurrence agency response
conditions that must attach to any development approval
Relevant laws and policies: Coastal Protection and Management Act 1995 and any related
statutory instruments and subordinate legislation
Jurisdiction(s): Operational work -
Tidal works, or development in a coastal
management district- Sustainable Planning Regulation 2009 -
Schedule 7, table 2, item 13
Development Description(s)
Property/Location Development
69 Wyuna Drive, Noosaville
I Lot 34 N 10575 Operational Works (Prescribed Tidal Works- Pontoon)
AIpproved PIan/s
Document no. Document name Date
JSP-SJ-25770 Rabtuvi P/L Lot 34 (69)Wyuna Drive Noosaville 14/03/2012
Site Plan, Layout & Water Allocation
Reason(s) for inclusion of conditions
In accordance with section 289 of the Sustainable Planning Act 2009, the reason(s) for inclusion of conditions
stated in this permit required by the concurrence agency response for the application are as follows.
The conditions are included pursuant to section 106 of the Coastal Protection and Management Act 1995.
The chief executive may impose on the development approval the conditions the chief executive considers
appropriate for coastal management
1
Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalenUsimilar as required by legislation
administered by the Department of Environment and Heritage Protection.
Page 4
\.
EHP Permit number: SPCC05668513
~
Signature
II \lpl frjISDate
Delegate Enquiries:
Ben Sale Ben Grant
Department of Environment and Heritage Protection Department of Environment and Heritage Protection
Delegate of the administering authority 12 First Avenue Maroochydore
Coastal Protection and Management Act 1995. Phone: 0754596133
Fax: 0754596190
Email: [email protected]
Version 2 ABN 46 640 294 485
Page 2 of 3 130331
. .
Page 5
’
.
EHP Permit number: SPCC05668513
CONDITIONS
1. All works are to be constructed in accordance with the approved drawings and specifications listed
in the approved plans section of this permit.
2. All reasonable and practicable measures must be taken to avoid or minimise the risk of the release
of contaminants to waters.
3. Measures must be taken to limit turbidity in tidal waters as a result of the works.
4. Disturbance to the bed and banks of the waterway must be kept to a minimum.
5. Any material or debris that falls or is deposited on tidal lands during the works must be removed
at the applicant’s cost and expense prior to the practical completion of the works.
6. A report from a registered professional engineer must be submitted to EHP on request, certifying that -
(a)the works (including any other associated works) have been constructed in accordance with the
approved drawings; and
(b)the works are structurally adequate for anticipated usage; and
(c)the bed and banks of the waterway for a distance of 15 m around the site of the works are clear of all
debris.
7. The chief executive administering the Coastal Protection and Management Act 1995 may order
the works be removed or modified within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
(i) create a navigation hazard or other danger to the public; or
(ii) cause erosion or land degradation; or
(iii) are unstable; or
(iv) have not been constructed according to the approved plans.
END OF CONDITIONS
~
Page 3 of 3.130331 Version 2
. ABN 46 640 294 485
Page 6
FENDER RUBBER
TO ALL SIDES
280’57’ 4514 7520 I
5900
r --’----, I
I
I
I
I
r ALU/V1INIUM FRAMED AND
DEC~ED PONTOON
I \ o
o
I/’)
I
I
I
I
:.
I
I
I
I
I
I
\
1-"
I~
I N
L
LAQDER
____.J
I
o
.NII/’) t.I\~
f"")1’t- 01-.
"""{]I
-.t’N
~:g LOT 34 ~:~ 315 83kNm
~! CP N 1 0575
10.
I LIGHT &
R.C INSITU PILES
\
I \ POWER
w
z
~
i TAP & :J
! l HOSE HOLDER
I 10900
L.-1o ;-gr-----96’S3r-:---’
10.900 \
I ~
::>
o
WYUNA DRIVE ""--EXISTING PONTOON AND g
CATWALK TO BE REMOVED ~
I
I I
I
I
I
SITE PLAN & STANDARD PIANO HINGE BRACKET !
WATER ALLOCATION I CONNECTED TO RETAINING WALL
FIT HINGE BRACKET TO FINISH
I
I
I
I
\
FLUSH WITH TOP OF WALL
:
SCALE 1:500 I
I
I R
I
II
I
7750 10637
1\ I
I
I .,.---.----,.---. ! o
I .
\ \
1200 WIDE X 6’00THICK
I
I
~
CONCRETE SLAB ’"
BERTHING: I
Moxil"’lul"’I wet vessel length -
8,01"’1 I POURED BETWEEN
’
,
I
!i
’-’
WAll~
I iX
4,01"’1 G445A MESH C....c;:.
I
Moxil"’lul"’I wet vessel beol"’l -
I
I
~
I
FINISH SLAB 50mm I 8
I
I
I
:
THAN TOP OF WALLS
"-----. ------. --
LOWE,R I
\
I
~
I
LAYOUT PLAN I
,
\ =>
f SCALE 1:100
!
Vl
Vl
o
%
NOTE:
Existing structures shown in
approximate position only,
~ "
~
o
!.!l
:J:
....
/ CUENT: RABTUVI P/L 1lTlE: SITE PLAN, LAYOUT
THE MARINA SPECIALIST f,.......,C.rdn
ASN: 57 051074992
LOT 34 (691WYUNA DVE & WATER ALLOCATION
TRADING AS ACN 010633119 2 INDUSTRIAL AVE ~./ Ullman Nolan
CALOUNDRA Ph (07) J100 2199 NOOSAVILLE
THE Level 11, North Tower 515 SI Pauls Tee. SCALE: DATE: DRAWING NO:
aLD. AUSTRA1JA 4551
Fortitude Valley, Old 4006 Fox ,(07)J36~ .9722
1:1 00 1:500 14/3/12 JSP-SJ-25770
locked Boa ~OO6, rortitude Vallev Old 400&, Emoll: cordnoOcord’no.cam,OI PROJECT: PROPOSED PONTOON & CATWALK
PHONE (07)5492 5925 lSSUE
DRAWN OIIrIENSIONS
FAX (07) 5492 6699 CHECKEu:~/ ~
\. ~~ 1/667
.
IR,P,E,Q,
[DAlE:
/6-4-IJ M.A I ~KED
.’
MILLIMETERS 4 I A3./
DAlE AMENDMENT
Page 7
Registered Post Postage
Queensland Prepaid Label 4~ ? ST
Government Paid
AP Article 10:
Department of Environment & Heritage Protection
PO Box 362
499165101019 Australia
MAROOCHYDORE QLD 4558
~J.l~~
c-)
-
<:::;)
’.l
-\
>
~
~
m
II1IIIII1I1I
499165101019
Q
IJ
I C"-J (
I
c
.-..J
t! ::::>
~ ~
\ -,
.......
Sunshine Coast Regional Council
Attention: Mark Lewis
locked Bag 72
SUNSHINE COAST MAIL CENTRE
NAMBOUR OLD 4560
Page 8
--
-~~-i
I
I
Queensland
Government
Department of Environment & Heritage Protection
PO Box 362
MAROOCHYDORE QLD 4558
Used in these records
DEPH Referral agency response - OPW13/0451Related documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.