                                                                EHP Permit           number: SPCC05668513




    CONDITIONS


    1.      All works are to be constructed in accordance with the approved drawings and specifications listed
            in the approved plans section of this permit.

    2.      All reasonable and practicable measures must be taken to avoid or minimise the risk of the release
            of contaminants to waters.

    3.      Measures must be taken to limit turbidity in tidal waters as a result of the works.

    4.      Disturbance to the bed and banks of the waterway must be kept to a minimum.

    5.      Any material or debris that falls or is deposited on tidal lands during the works must be removed
            at the applicant’s cost and expense prior to the practical completion of the works.


    6.      A report from a registered professional engineer must be submitted to EHP on request, certifying that   -




            (a)the works (including any other associated works) have been constructed in accordance with the
            approved drawings; and

            (b)the works are structurally adequate for anticipated usage; and

            (c)the bed and banks of the waterway for a distance of 15 m around the site of the works are clear of all
            debris.

    7.      The chief executive administering the Coastal Protection and Management Act 1995 may order
            the works be removed or modified within a reasonable time, if the works have or are likely to have a

            significant effect on coastal management because the works:

            (i)       create a navigation hazard or other danger to the public; or


            (ii)      cause erosion or land   degradation; or

            (iii)     are unstable; or


            (iv)      have not been constructed according to the approved plans.




                                         END OF CONDITIONS




                                                                                                  ~
    Page 3 of 3.130331   Version 2
                         .                                                                         ABN 46 640 294 485

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DEPH Referral agency response - OPW13_0451.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.