Original source · versioned page text
Development Assessment Report
PROJECT URBAN – 16216 February 2021 SERVICING Bin enclosures are provided on the northern boundary of the site. As agreed as part of the previous development approval, the refuse bins will be collected and emptied from the Council land to the rear of the site. INFRASTRUCTURE A Site based stormwater management plan has been prepared by Alta Engineers and this is included in the supporting documents. The Plan provides details of the proposed strategy for collecting, treating and discharging stormwater from the site. The report has been prepared in accordance with Council policy and current best practice. The reports recommends a bio-retention basin which will be located in the south western corner of the site. It should be noted that the proposed Site Plan confirms that the finished floor level of the basement will be RL 5.70, which will allow the basement to gravity drain to a pit located to the south east of the site in Doonella Street (RL 3.0). The site is already connected all the necessary urban services including water, sewer, electricity and telecommunications. Development Assessment Report Page 14 of 28 Material Change of Use & Operational Works 30 & 32 Doonella Street, Tewantin, Qld 4565 Lot 32 On RP893427 and Lot 903 On T1631
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Development Assessment Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.