10/0728 - Op Works - Land Use [As Published] · 142010.728
SU nshine Coast Checklist - Applications Involving Planning
Regional Council Assessment and Operational Works Assessment
RECEIPT OF IDAS APPLICATIONS AT TEWANTIN OFFICE
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter to determine if properly made. (This may not always be possible and can be further checked)
i: APPLICATION:FORMS _ : Z 4
1.1 Form 1 required for all application & Forms 2-32 .
1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include v
payment of appropriate fee. (Do not receipt at this stage)
1.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required. Y
4.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 — If the owner of the land is a company, either ACN No, Company name (clearly indicated by
signatory) or Company Seal required.
(2... IDAS"ASSESSMENT_CHECKLIST. " " re " ee oy
2.1. Ensure that relevant checklist/s have been completed with regard to referrals
{if applicable, not mandatory) LV
2.2 Ensure correct IDAS.Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works) L_
(3. ENVIRONMENTALLY. RELEVANT, ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required.
reo
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Healthly Places for fees)
4. _xFORM 2- REQUEST.TO CHANGE APPROVAL _...; il i ad newts a
4.1. Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners. consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
.a PLANS us ‘ a si — : : zy NE fel
5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete. !
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is V
unbound.
6, SUPPORTING INFORMATION ]
6.1. Ensure. that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration | [{
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. Y
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionaily an electronic version is preferred where possible for ease of electronic record keeping _
(7,___FEE J
7.1 Ensure that the application fee, as determined from the Council's adopted scale. of fees,
accompanies the application or has been paid. , Y|
« Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
« Operational Works Assessment Operational Work not including Jetties
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
T g:Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
IDASIREEERRALSAGENCIESITRIGGERS, (Most recuenucctorrcls) iBleaselrefertolDAS.Checkiistsiforcompletelist Department of Roads (Concurrence ‘or Advice) ® State Controlled Road Dept Environmental Resource & Management Advice e Acid sulphate soils e Wetlands e Conservation estate Concurrence « Clearing of native vegetation on freehold land ; e Environmentally Relevant Activity (for non-devolved Council as EPA) e Contaminated land * Environmental Management/Contaminated Land Register UXO Land recently used as a ‘notifiable activity’ Industrial land changed to sensitive uses (eg school) Coastal related development. Koala habitat Queensland Transport (Concurrence) e Railway . Public Passenger Transport Energex or other responsible entity (Advice) . Electricity Easements/Substations DIP (Concurrence) . SEQ Regional pian VARIOUS Department of Environmental Resource Management For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning. T gManduse\administrative processes\application checklist.doc
Page 3
Application details—IDAS form|1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomp lete forms or fofras ypitenortd Mhecessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
Ede | Integrated Development Assessment System form
Development Counter
17 MAY 2010
© complete this form (Application details—IDAS form 1)
* complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
‘Name/s (individual or company name In full)
For companies, contact name
Postal address
Contact phone number
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory).
Department of Infrastructure and Planning
\oedla 4 =X Seley
LL
\4-lo Dake ge
Come jae rook
Oui bo2 ar
Ovo ¥€ 0759 2.
EWTZ5ZO2 .
Wo Ad dumdoaxd ox wane
=
Qe
Page 4
ooo
4,,What Is the nature of development proposed? (tick all applicable | box/es)- . oe
vee
Cc] material change of use of premises
| / building work
CL] reconfiguring a lot
operational work
2. What type of approval is being sought?
| development permit [| pretiminary approval | both—provide details below
3. Is the application for a mobile and tempora
ry environmentally relevant activity (ERA)?
ere SS,
[7 No
* ‘ > .
| Yes—complete table A and then go to question 5
Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate
Sos Mino ode ‘
4. Location of the premises {complete table B and/or table c asapplicable. Identify each lot in a separate row).
Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises,
PH street address/lot on the plan
L] street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
»?
water e.g. jetty, pontoon)
Street address Lot on pian description Local government area
Unit | Street | Street name and official suburb/ | Rost- | Lotno. . ,. Plan type (e.g. Logan, Cairns)
no. no. locality name ‘code ‘| and plan no. ‘ A
5
Ahly |Doke xo Apt) yA f: Pooss Vheads
SoaeViae nm Voz bey
a4] fpsgun
S 350144338
3 SP 279453
Application detajls—IDAS form 1
Version 1.0 18 December 2009
Page 5
Page 6
Page 7
Page 8
Page 9
Sunshine Coast ‘ann use section Fees Regional Council : . CIVICA TYPE RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/lmpact MCU Consistent 521 Inconsistent §21 Assessment under Superseded Planning Scheme . §21 Modification to a Development Permit MOD DP : 521 Extension of a Currency Period 521 Lot Reconfiguration . RECONFIG — 521 Bldg Work assessable against the Planning Scheme Dfks V¢F- 521 PRE-LODGEMENT REVIEW Half Hour 522 One Hour * §22 ADVERTISING : Purchase Advertised Applications 523 JETTIES ” Jetty Application Fee §24 - Jetty Bond : Lo © st. (Category 4) BONDS . Performance Bond : 51 (Category 9) SEARCH FEE : Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ 7g NAME: dese oh — ee Doty —Besn Hoos ADDRESS: Iyer the Crk Se Sev Stiyte bree USLT FILE NO: lof 72¢ DATE: da /s7o RECEIPT NO: ! . Signature of TP Officer: AUTHORITY NO: He/( tore fae |
Page 10
coo
Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
‘dredging in Moreton Bay)
Coordinates : Zone Datum Local government
(note: place each set of coordinates in a separate row) : reference area (if applicable)
Easting Northing Latitude Longitude
| GDA94
[_] wess,
[] other
———— - = = et ——
|5qlotal area of the premises on which the development is proposed (indicate hectares orm?
eer ree
\2xln Size Bem = Wen 5
apartment building?
>
f7Xprovide a brief description of the proposal (erg six unit apartment buildine’30 lot residential subdivision etc)
{h) e re som as pee eee = = = ‘ = =
Vidi box Dyezouel— ewarn .
= Sa : SS LOE ROP RRE SS ORE LEELA SE I LE PE IS -
ent required forthis application? (refer to notes at the end of this form for more information) Mmaecee =e
Ils ‘owners cons
ew
C] Yes—complete either table D, table E or table F as applicable
Tabte D
*| Name of owner/s of the land : \nede Caley '
—
1/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of-o Higcys of the land
ZS
——TJ
Date /7-4&°- jo .
77
3 : . Application details—/DAS form 1
Version 1.0 18 December 2009
Page 11
OOO Table E Name of owner/s of the land [ The owner’s written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land [7] By making this application, I, the applicant, declare that the owner has given written consent to the making of the application. 9. Does the application involve a state | ‘resource? (e.: g. the ‘application involves state land, ‘or “aking quarry materia ab ‘Refer’ to the. notes at the end of this form for more information) ae 7 No , q Yes—complete table G | Table G—state owned resources (provide details for each state resource in a separate table) Nature of state-owned resource : - y > Nature of evidence required (tick the: applicable box and attach a copy of the C] Evidence of an allocation of, or an entitlement to, the resource evidence to this form) : , [4 Evidence the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or an entitlement to, the resource C] Evidence the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or an entitlement to, the resource 10. Identify if any of the following apply to the premises (tick applicable box/es) "ee x | adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H CE] on strategic port land under the 7ransport Infrastructure Act 1994—complete table | Oo in a tidal water area—complete table J Table H Name of water body, watercourse or aquifer . 6 Application details~IDAS form 1 Version 1.0 18 December 2009
Page 12
~
/ cre No O Yes~ensure the nature, location and dimension of proposed works are included in plans submitted
OO
Table | Lot on plan description for strategic port land ‘| Port authority for the lot
Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
‘the payment
a portable | long service leave levy applicable t to this application? (refer to to notes at the end of this, ]
ald ” i ws i is ERR
LY toga to question 15 ~ Yes
4
‘the portable long service leave levy been paid? (refer to notes at the énd of this form for more information). ——
Yes—complete table K and submit with this application the yellow tocat government/private certifier’s copy of the
-receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E, Lor P)
15. Has the local government agreed to apply a superseded planning scheme to ths application under section 196 of
the Sustainable Planning Act 2009? ey
4 No
| Yes—please provide details below
Name of local government Date of written notice given } Reference number of written notice given
by local government by local government (if applicable)
Woo Heal — nllo
//
5 Application details—IDAS form 1
Version 1.0 18 December 2009
Page 13
Description of attachment or title of attachment - Method of lodgement to sf LO? A . A assessment manager em Looreec id Kped- 5 [Sipe hrdioa) ST. tk DLF Ged Heotiel._ L Gat _fele rah Edeante. Son fb « f02. _17. Applicant's declaration [fey making this application, | declare that all information i in this application i is true and correct (note: it is untawful to” provide false or misleading information). Notes for completing this form > . ? Question 8: ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. ° Owner’ 's consent is not required for a mobile and temporary ERA. Question 9: © Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the apptication. Question 13: ¢ The Building and Construction Industry (Portable | Long Service Leave) Act 1991 prescribes when nthe portable long service leave levy is payable. ¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: ¢ The portable tong service teave levy need not be paid when the application is made, but the Building and Construction Industry (Portabte Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. e Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www. qgleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.gleave.qld.gov.au. 6 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 14
? KIL Privacy—the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) ot as required by Partiament. This information may be stored in a departmental! database. The information collected will be retained as required by the Public Records Act 2002. . OFFICE USE ONLY Date received Reference numbers NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Council. have been engaged as the private certifier for the building work referred to in this application Date of engagement Name BSA Certification license number: Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Description of the work QLeave Project Number » Date receipted A : : mount paid Date paid form sighted by ($) > assessment manager Name of officer who sighted the form The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application detatls—IDAS form 1 Version 1.0 18 December 2009
Page 15
| i | perce AU eee ea Ne CHOSE Building or operational work assessable against a planning scheme—IDAS form6 ~ « (Sustainable Planning Act 2009 version 1,0 effective 18 December 2009) This form must be completed for development applications for building works or operational work assessable against a planning scheme. You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: * complete Application details—/DAS form 1 * complete any other forms relevant.to your application e provide any mandatory supporting information identified on the forms as being required to accompany your _ application. ; . Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Susta/nable Planning Act 2009 or the Sustainable Planning Regulation 2009. . . ; > This form can also be used for development on strategic port land under the 7ransport Infrastructure Act 1994. This form can also be completed online using Smart eDA at www.smarteda,qld.gov.au nature of the work tha ment against a planning scheme? (tick applicable box/es)”. hed mati eeetomeagae nena we dina te eagerness otal i >prrcadre DOx/ es): ex [] building work—complete table A [A operational work—complete table B - Table A What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a buitding)? What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) | development permit LC] preliminary approval Are there any current approvals associated with this application? (e.g. material change of use) List of approval reference/s : Date approved Date approval lapses gf Department of Infrastructure and Planning YET M eT seis} acl eats
Page 16
OOO
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
[_] road works [_] stormwater Cl water infrastructure
[_] drainageworks = [J earthworks = [| __ sewerage infrastructure
CE landscaping [1 signage CJ clearing vegetation under the planning scheme
| other—provide detaits L, okt box /anxfy 4pr0 — Wiper -
What type of approval i is being sought? (if vols have’ indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit {] preliminary approval C] both—specify below
Apr Fe Lala box a Orrecjal 7 Pktoni] ©
Is the “operational work necessity to facilitate the creation of new lots? (e.g. subdivision)
ry .No | Yes—specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
+
LP No Yes—provide details below ,
List of approval reference/s f Date,approved , Date approval lapses
; : t
2008] 0249 | 34g 7/7
ee / /
2. What is the dollar value of the proposed building work? (inc GST, materials and labour). | $ 2500 - '
°3..Confirm that the following mandatory supporting information accompanies this application. & .@ © at gets
Confirmation of | Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following: CJ confirmed
¢ the location and site area of the tand to which the application relates
(relevant land)
« the north point
« the boundaries of the relevant land
© the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for ail lots)
2 . , Suilding or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009
Page 17
OIC
e any existing or proposed easements on the retevant land and their function (oneke, {
® any access limitation strips : —
® all existing and proposed roads and access points on the relevant land sf- .
| a Statement about how the proposed development addresses the local [-Heonfirmed
government’s planning schemes and any other planning documents relevant to .
. * 4
the application 4H oy
Applications for operationat works Involving earthworks (filling and excavating)
drawings showing: ; | confirmed
¢ existing and proposed contours
@ areas to be cut and filled
¢ the location and level of any permanent survey marks or reference stations WA °
used as datum for the works . ,
the location of any proposed retaining walls on the relevant land and their
height
¢ the defined flood level (if applicable)
e the defined fill level (if applicable) _
Applications for operational works involving roadworks
| drawings showing: , [] confirmed
¢ existing and proposed contours
¢ the centreline or construction tine showing chainages, bearings, offsets if the
construction line is not the ¢entreline of the road and all intersection points
¢ information for each curve inctuding tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable) ‘ Mw fr
¢ kerb lines including kerb radii (where not paratlel to centreline) and tangent
point changes (where not parallel to centreline)
* edge of pavement where kerb is not constructed
. position and extent of channelisation
© location and details of all traffic signs, guideposts, guardrail and other street
furniture .
¢ pavement markings including details on raised pavement markers
* catchpit, manhole and pipeline locations
¢ drainage details (if applicable)
¢ crossroad drainage culverts (if applicable)
* concrete footpaths and cycle paths
e location and details for access points, ramps and invert crossings
« changes in surfacing material
3 Building or operational work assessable against a planning scheme—I/DAS form 6
, . Version 1.0 18 December 2009
Page 18
CIO Applications for operationat works involving stormwater drainage drawings showing: existing and proposed contours drainage locations, diameters and class of pipe, open drains and easements manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels | ’ : : intet pit locations, chainage and offset or co-ordinates and invert and kerb levels : [_] confirmed a) : Applications for operational works involving water reticulation drawings showing: ° _kerb lines or edge of pavement where kerb is not constructed location and levels of other utility services where affected by water reticulation works : pipe diameter, type of pipe and pipe alignment | water main alignments . ‘ water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) . “location of bench marks and reference pegs | confirmed Na Applications for operational works involving sewerage reticulation drawings showing: location of all existing and proposed services location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed ‘chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable) EL] confirmed wp. Applications for operational works involving street lighting drawings showing: location of all light poles and service conduits location of all other cross road conduits type of wattage and lighting any traffic calming devices additional ptans for roundabouts and major roads (if appticable) details of any variations to ngrmal alignment details of lighting levels [}<ontirmed So pm 4 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 19
ooo: Applications for operational works involving public utility services drawings showing: : C] confirmed - © any existing light poles and power poles’ _ e any existing underground services A g ¢ details of proposed services ¢ alternation to existing services Applications for operational works Involving landscaping works drawings showing: . : CI confirmed ¢ the location of proposed plant species ¢ aplant schedule indicating common and botanical names, pot sizes and numbers of plants ¢ planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden zt fe: edge © the location and type of any existing trees to be retained * construction details of planter boxes, retaining walls and fences * the proposed maintenance period « irrigation system details Notes for completing this form: ® This form can also be used for development applications for building works or operational works assessable against the land use plan for Cairns airport land or'Mackay airport land..Whenever a planning scheme is mentioned, take itto mean the land use plan for the airport land. : Privacy—please refer to your assessment manager for further details on the use of information recorded in this form, 4 OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. s Building ar operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 20
DOLPHINS BEACHHOUSE - NOOSA pv News ory A Development Counter #¥. 5.72. 17 MAY 2010 LG eboS Mehul 4A, . Tewantin U4 - MoV 019F | Ii fe fpoosh Fine. [Jp Bow TR CUR Bose | WZ a clove Co fe vk | y pe fed fe Sond He Lol Tipo fi - , poleves 7 ee a fisted a Y yr a" J< Poul 7 pull We We Sed oe overcih one e oe | Me 7 Lown Cy Fon > Bat St she Lyd Ferd « «Lol bmp rag “e, yt Soh Fe lowinr Fee Haak “Mode bh = fa Suet Sunshine Bec” re Aching Fis, Fix, Phon ann 2100 Fax 5473 S392 OE by D EE yu yy, oot
Page 21
JOO® j 0290 4 ‘ Precio rcet Uaioe ¢ - Dolphins Beachhouse 14 — 16 Duke Street Sunshine Beach re Phone 5447 2100 Fax 5473 5392 [email protected] LOo/ide'd 29508 = - . . . . -. AvTHL 000% LL/ZO
Used in these records
10/0728 - Op Works - Land Use [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.