Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Pensar Environmental & Waste Management Plan

Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach (EMAIL 3/3) - Fauna Management, Landscaping, Bushfire Management, Environmental Management, Waste & Preliminary Construction Management Plan.

of 26

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                       Environmental Management Procedure




  Table of Contents
  1.       Introduction                                                                    3
  2.       Environmental Obligations and Policy                                            3
  3.       Appreciation of Legal and Other Requirements                                    3
  4.       Environmental Management Framework                                              3
  5.       Consultation, Communication & Reporting                                         4
  5.1      Consultation                                                                    4
  5.2      Communication                                                                   4
  5.3      External Stakeholders                                                           4
  5.4      Reporting                                                                       4
  6.       Identify Environmental Aspects of Company Operations                            5
  7.       Assessment of Risk & Potential Environmental Impacts – Projects                 5
  8.       Environmental Control Measures                                                  6
  9.       Site Environmental Management Plan                                              6
  10.      Monitor & Supervise Environmental Control Measures                              7
  11.      Environmental Training for a Specific Project                                   8
  12.      Incident Reporting and Environmental Breaches                                   8
  12.1     Project Incidents or Breaches                                                   8
  12.2     Non-Project Incidents or Breaches                                               9
  13.      Emergency Preparedness                                                          9
  14.      Evaluation of Effectiveness – Environmental Assessment & Control Measures       9
  15.      Assessment of Compliance with Environmental Obligations                       10
  16.      Reference Documents                                                           10
  Document Control                                                                       11




Document Number: ENV-PRO-001           Date: September 2018, REV: 4                    Page 2 of 11
Log in to download the original file

Pensar Environmental & Waste Management Plan.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.