Original source · versioned page text
Attachment A Soil reports
Attached to the e-mail MCU14/0103 Development Application - Plans Email 2 of 2.
=ASI AUSTRALIAN SOIL INVESTIGATIONS +++ Site and Soil Evaluation ---:: Client :I & C Gordon Location 146 Solar Road, Mt Cooroy, QLD (SP 223759) Report No.140120 Date:12/7/14 Phone: 07 5447 1304 Email: [email protected] Address: PO Box 1661, Noosa Heads, Qld. 4567 Australian Soil Investigations Pty Ltd ABN: 11147854439
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 10 pages
Page 2
ON-SITE EFFLUENT DISPOSAL REPORT: 146 Solar Road, Mt Cooroy. Introduction: Allgo Wastewater Management have conducted a Site and Soil Assessment at the above allotment for the purpose of determining the most suitable means of on-site effluent disposal. On-site testing for this assessment was performed in accordance with AS 1547-2000-"On-Site Domestic Wastewater Management and the Queensland Plumbing and Wastewater Code. Field work for this assessment was undertaken, on the 12/6/2014. This assessment has been based upon the proposed house plans, provided by the client. Site description: The allotment is located within the Sunshine Coast Council. and is contained within a | semi-rural area. The slope within the aliotment is generally linear. The slope within the area best suited for effluent disposal is in the order of 15%. On-Site Assessment: During-our site-evaluation consideration was given to the following: Y the available area for the primary siting of absorption areas (Land Application Area) and alternative sitings. ¥ the risk of prejudicing adjoining property and underground water supplies, by seepage or run off from the site. Y permeability, soil type and soil depth. Y drainage, and envisaged seasonal changes in ground water level. v general climate. ¥ slope and the effects of seepage and water run-off from surrounding higher ground. On-Site Testing: Three test holes were excavated in the positions shown in the attached site sketch. These holes were 100mm diameter x 600 mm deep for the purpose of site soil assessment in accordance with the AS 1547 - 2000. A further 100mm diameter hole was excavated to determine the soil profile. The site was then classified in accordance with AS 1547 — 2000 On-Site Wastewater Management for the purposes of effluent disposal. AUSTRALIAN SOIL INVESTIGATIONS ASI Ref: 140120(A)
Page 3
Results: Site Observations Suitable Area for siting a Land Application Area Adequate area for a Reserve area Is there Adequate Soil Depth depth above rock or the water table Is the Soil Type Satisfactory Is the potential of runoff from the proposed area OK Is there a potential for groundwater seepage Soil Borehole Results Ves a a a a a Depth Soié Description 0-400 Silty Clay CL Light to med clay, Dark brown Moist, Mod (Cat 4) 400-2000 Silty Clay CH Heavy clay , orange brown Moist, mod. (Cat 5) Traces of gravel 2000 Borehole Terminated Dense gravel Constant Head Method permeability results The following design criteria is applicable for the following disposal methods: 3 Faéé (mm) 25 Time (mins) 124 (secs) 9 Iudicative Permeabieity (Ksat) 0.0322 Soié Category 6 3 AUSTRALIAN SOIL INVESTIGATIONS Test Site: 4 25) 39 47 0.1005 5 No 25: 41 0.0973 ASI Ref: 140120(A)
Page 4
Indicative Permeability Test Site: 3 4 | 5 Soil Category 6 D 5 | Structure Moderate Moderate Moderate Indicative Permeability - <0.06 0.12-0.5 0.12-0.5 DIR 15 20 20 Recommendations: Based upon our Site and Soil Assessments we recommend the following method of On-Site Effluent Disposal should be used For the treatment of the Effluent we recommend; Advanced Secondary WasteWater Treatment System (AWTS) (NOTE: The system chosen must satisfy both the Queensland Plumbing and Wastewater Code and AS1547-2000 On-Site Domestic Waste Water Code and be approved for use by the Local Shire/Council governing the allotment.) For the disposal of the treated effluent within the Land Application Area we recommend; A Pregguriged Su6-Sutface Reticulated Jrrigation System (NOTE: Where Surface irrigation is used in conjunction with an Aerobic Sand Filtration System the treated effluent shall be disinfected with chlorine prior to dosing of the Land Application Area.) The size of the Land Application Area is calculated as follows; Minimum requirement q 115 litres per person per day AS 1547-2000 Appendix 4.2D Water Supply Tank water Number of persons = 6 AS 1547 Table 4.343 Total Volume Q= 4830 min/week Soil Category 5 AS 1547 Table 4.2A4 Indicative permeability 0.06-0.12 AS 1547 Table 4.244 DIR 20 mm/day AS 1547 Table 4.2A4 Disposal Area A= 242 m AUSTRALIAN SOIL INVESTIGATIONS ASI Ref: 140120(A)
Page 5
WE RECOMMEND THAT A MINIMUM LAND APPLICATION AREA OF 242m? BE PROVIDED. A check of Water Balance requirements in accordance with the Code has been undertaken and have been found to comply The Irrigation System should be designed in accordance with AS 1547 - 2000 and comply with all relevant statutory requirements Construction Guidelines for Land Application Areas: Surface Irrigation Consists of a reticulated pressurised irrigation system that uses a series of surface sprinklers to equally distribute the treated effluent across the Land Application Area. This system allows vegetation within the area to directly benefit from such watering which also assists in disposal of the effluent via evapo- transpiration. Points to consider in the construction of the area include the following: » To avoid runoff from the area it should be as level as possible. Any sloping areas should be terraced or retained and filled > rainwater shall be diverted around the perimeter of the area by use of open catch drains or bunding. Similarly a retention bund should be constructed around the low side of the area to retain any effluent overflow. » Sprinklers with a throw of not more than one meter shall be used and produce coarse droplets (instead of a fine mist) to minimise the risk of aerosol dispersion and wind drift of effluent. The plume height shall not be more than 300 mm above the finished surface of the irrigation area. > The treated effluent must not be used for the irrigation of fruit or vegetables > Siting of surface irrigation shall be in a location away from regular pedestrian traffic and recreational areas, so there is no risk of direct spray or wind driven spray onto such areas. > The area should not be within vehicle paths or be near children’s play areas >» Treated effluent quality must conform to AS 1547-2000 and the Queensland Plumbing and Wastewater Code, We have attached a site plan showing the proposed position of the Land Application Area and also some details highlighting the construction techniques required for surface irrigation. Preparation of irrigation area: When a proposed irrigation area has a low permeability, it is particularly important to ensure that the permeability of the soil in the irrigation area is improved and maintained and that there is an adequate cover of porous and fertile topsoil to act as immediate storage of effluent applied to it, and to support rapid growth of vegetation on the area to maximise evapo-transpiration. It is recommended that topsoil be imported to improve rapid growth of vegetation and improve the evapo-transpiration process. Requirements of irrigation system: All irrigation pipe work and fittings shall comply with all parts of AS 1477 or AS 2698.2. The distribution irrigation lines should be buried to a minimum depth of 100mm. There shall be no cross connection AUSTRALIAN SOIL INVESTIGATIONS 5 ASI Ref: 140120(A)
Page 6
between any irrigation pipe work and the potable water supply. Any pipe work used for the transport of effluent included treated effluent must be lilac in colour Along the boundary of the surface irrigation area there shall be at least two warning signs clearly visible to inform the occupants of the premises that recycled water is used for irrigation. Each sign shall comply with AS 1319 and have: (a) lettering visible at 3m and (b) wording: Recycled Water Avoid Contact DO NOT DRINK Prior to the use of the system, the warning signs and the landscaping and surface preparation must be completed. The Land Application Area must also be inspected and approved for use by Allgo Waste Management Siting of the Land Application Area: The current Code of Practice for On-site Sewerage Facilities provides minimum horizontal/vertical separation distances for Land Application Areas. They are as follows; Sub-Surface or Covered Surface Land Application Areas(ADVANCED SECONDARY) Property Boundaries Upslope from the Area - 2.0m Property Boundaries Downslope from the Area - 4.0m Dwellings Swimming Pools 5 6.0m In-ground Potable Water Tanks = 15.0m Dams, Watercourses or Bores = 10.0m Vertical distance to water table - 0.6m In no instance shall Effluent be used for irrigation of fruit or vegetables. No Vehicle loading or children’s recreational areas to be applied or constructed within the Land Application Area. System Maintenance: The owner of the property shall ensure that all manufacturers maintenance procedures are undertaken in accordance with the local authority and the manufacturers recommendations for what ever system is installed. The system must be inspected/tested on a regular basis in accordance with the manufacturers requirements and all Statutory requirements from relevant local and state government agencies. System Installation: Installation of the system must be undertaken by a qualified plumber in accordance with local authority requirements and in accordance with the relevant Australian Standards and Australian Building Code. Definitions: Design Loading Rate (DLR) The long term acceptance rate (LTAR), reduced by a factor of safety, expressed in L/m?/day or mm/day as applied to the horizontal design area of a land application system. AUSTRALIAN SOIL INVESTIGATIONS ASI Ref: 140120(A)
Page 7
Design Irrigation Rate (DIR) The loading rate that applies to the irrigation of a land application area with effluent of a secondary quality. It is expressed in L/m?/day or mm/week. If a spray irrigation system is used, the secondary effluent is subject to continuous disinfection. Durable Aggregate An aggregate with the grading requirements specified in AS 2758.1 for single-size course aggregate for nominal sizes from 20mm - 40mm. Dry Vault Commonly known as “composting toilets”, a chamber that receives and treats human and domestic organic waste using a biological degradation or dehydrating process. The only water used is for cleaning or assisting the biological degradation process. Geotextile Any permeable durable synthetic textile material used with foundations, soil, rock, earth or other geotechnical engineering related material. Land Application Area The designated area of land and reticulation system used for the disposal of the treated effluent. LTAR The long term average rate an effluent can be adsorbed into the soil of a disposal system, expressed in litres per square meter per day. LTAR is dependant on effluent quality, permeability and organic loading. Permeability The rate clean water is transmitted through a soil, expressed in meters per day. Terrace Where the trenches are in an area where the slope exceeds 15% (approximately 1 in 7) they must be terraced. Water Reduction Fixtures Fixtures-include-11/5-5 titre water-closets, shower flow restrictors, aerator taps and water conserving washing machines. Report Limitations: The log sections in this report should be representative of the soil conditions over this site, however, soil conditions can change dramatically over short distances. The person responsible for installing the system must observe the soil profile and ensure it matches the soil profiles recorded in this report. If soil conditions differ from those recorded by us, we must be immediately notified so that further investigation can be carried out and the system design modified if necessary. This work may involve additional fees and costs. This company will not accept any responsibility for additional costs to any party as a result of soil variations. In writing this report, we have also considered all the information supplied to us by our client. Should the client or his agent have omitted to supply us with relevant information, our report may be irrelevant and/or inappropriate. We do not take responsibility for the consequences in such cases and we will make an additional charge if as a result, more testing or rewriting of this report is necessary. The operation of the disposal system is dependant upon the hydraulic load, the type of the material entering the system and the maintenance of the system. As these factors are beyond the control of this company we do not take any responsibility for the long term adequacy of any disposal system constructed on this site or the consequences of its malfunction. | la W. Holmes SCRC 041 For and on behalf of: AUSTRALIAN SOIL INVESTIGATIONS AUSTRALIAN SOIL INVESTIGATIONS 7 ASI Ref: 140120(A)
Page 8
Approved 10 Person Aerated Waste Water Treatment System. Supply from pump set, sized for 24L/min (min.) to disposal area. = \. Inline strainer 150-200um . aoe seperation between platforms. Revision |Description Date 15/10/08 Sub-Surface Where the ground slope exceeds 15% the area must be terraced into 3.0m wide platforms containing a minimum of 2/25mm laterals each. Provide Surface runoff diversion drain or bund. Non-Return valve where AWTS below aplication area. K-Rain valve | = ——" No. of ports to suit No. of laterals. Lateral header pipe sized to ensure equal flow to laterals. | Extent of land application area (hatched), size as Legend 3 Flushing valvels in control boxes with Lilac lids, © _ Vacuum breaker positioned at highest point of area. 1000 Typ. indicated on plan. 25mm poly laterals with 49 holes drilled at 2000 ctrs. We advise laying laterals within Surface runoff t f ! slotted ag pipe or similiar retention bund. DISPOSAL AREA PLAN (Typ.) Distribution System Diversion ZN 25mm laterals within 150(W) x 200(D) sookage trenches aligned parallel with surface contours, 20-25mm gravel, General Notes : 1. The Plumber is responsible for locating all existing services within ond adjacent the allotment prior to commencing the work. 2. This drawing is to be read in conjunction with the attached details ond the specifications and requirements of Allgowastemanegment Absorption Report. 3. The installation is to be in strict accordance with AS 1547-2000, Local Authority requirements and Allgowostemanegment Absorption Report. 4. The work is to be undertaken and completed by a registered plumber. laterals, depth 100 : 1000 Drain. approx \ | Te Ground Level as Number of laterals shown indicative only, number to suit irrigation area and offsets shown.Min 6x20m per 200m. 150mm min Topsoil. Retension (on Bund. i S =) wm min. Rrovde geotextile Groundwater Level wrapping. Dann Upon completion the disposal area shall be planted with approved vegetation, refer attached listing. Drg No. ABS—002 AUSTRALIAN sor w SOIL INVESTIGATIONS 1/11 PROJECT AVE NOOSAVILLE QLD.4569 Ph 04280 310 453 Fax (07) 54472 634 STD DETAIL Drg No. ABS-002
Page 9
Plumbing Services
= a PO Box 141 TEWANTIN QLD 4565
fe] NOOSA COUNCIL Porson °
[email protected]
SITE EVALUATOR(S )
NAME: (Principal Evaluatop.7. rs as Renee
COMPANY/AGENCY.....> SA Beas es
Pelciens NI PEE, SORT
SITE INFORMATION
Location Details:
LSOGEUIEY is etemret IN oo) a oo canzone co phegehglnenenuneaxennsdaceusslesusa onsen pusiauptisartonseonaniensecauaavemespernstays
Owner: .... A5@ex$ 4S =
Address:
Climate:
Annual rainfall: io aes mm
Data‘souree Used: ... SSNs sc. eR | OM tect Beste Me ee. CR anaes ee Recess
Intended Water Supply Source: in
Public Supply o Rainwater (roof collection) oO
Photographs(s) or Video attached: (Please tick box) YES L] NO a Specity details) :...... ce eens
ON-SITE EVALUATION
Work Undertaken:
Details:
Date: “N2\Se\ rene Weather: . (on day and proceeding week)
Photocopy of desktop study attached (Please tick box) YES C] NO Epecify details)...000 0...
Topography: >< .
Slope: ........ Sh a ee ae Ground Cover: CALARS E'S. 2. Stent TLS,
Geology confirm: (Please tick box) YES 1] NO a esos ccaa ta eacoam peat scuincstr ed sear ero eae nae tanpra rea eno neaeaaNt
Soil landscape confirmed: (Please tick box) YES TL) NO Ci ooo... cccccceecc ces ececesseueeuseveseeecsvssseesesecs
Drainage Patterns: ............. . Site Plan details attached: YES / NO: oo... eee
Clearance :.........:.. ....Site Plan details attached: YES / NO...
Boundaries: . ESSE SAce Allowable Minimum: ................ecceceeeeee Available: .. z
Waterways: DER aAetn.........Stands of trees/shrubs: .. WENSIDONES: unccamssnvenversncats
Embankments: ............... ... Buildings: ...H.Oss
Other GOSCIHY)P xasenseenereimew comatose
Site History (land use):
Environmental concerns (e.g. native plants intolerant of phosphorous load, high watertable, swamp,
WISI CIEE eins sana ccrercaxereeenacisanciianniinasseaedinnecarnnenneecenaaesanmrensesseenranenneess
Page 10
Drainage Controls neater ila ciccc. cece cect ens e cen osebebnaiaaaaisaaie ca agen gel ame eee esa coe ceases aire as
Depth of seasonal watertable:.......c cc ccecsesesceesseeneessesteseeceeseresee Is groundwater quality an issue? YesC] Nol]
Needtforcutotixdneins/GiVensiOMS+DANKS? sor sscc.sccrriesaveec fs cv cov esWovs covene units sive soe tSWeeWeeaasobbaaaniateveWs Sv tunes Ceusau
Need for surface water collector/cut off drains: .......... oe
Treatment plant lid shall be above Q100 flood prone area...... 0. eee tee nr enti ennnteene tee eeeeeeenes
Availability of reserve/setback areas (show details on sketch plan) =
Reserve area available for extensions: ......... TAMER. % of design area:.... SSS. ee
Photographs attached: YES [1 NO LW specify etal): ccc cece cee ceneeeceete eee teeeeeteeeusteeeenentinesetatee
SOIL INVESTIGATION
Soil Profile Determination: Mark on site plan scaled or dimensioned: .........0......00. 00. ccc cceceee cee cee ees eens
Test Pit! (1 Borehole: Other: FE] Please specify: S090... eae TR
Reporting (Attach IBOPEIMGGS) =... 5 acne coef ot teen nnn dqinnns saree Reman gana emrresreten yap deeereaesatcods a beakerenek
Estimated Gon Category: 22... |. sci ccsccs ir acensiiisiens scserasakesiavess sisessite OPS ee pepe eee ee
Sen ee ae Permeability:..............0.... miday DLR/ DIR
Site Test 1 2 3 4 5 6 7
Soil
Category een. Gs S S ae caine
GENERAL COMMENTS
Remaining matters Of CONCEMN APE: .isiccccacsicsecesgeegge eeeeeesde ene sdsnsesseciscecstscessassnsesesioneecssttereseeseeeeventsbuabnees
REAM... ABT. CEE RT. LE SICACR).. 0 eee
Type of land application system considered best suited to site and why?............. ccc cette
A. VTE. BD Sais.. BRSEaSOMT ed STS. ©. PAP-Dra@eans.. ag CAT. 5
Overall evaluation of minimum land application area for the site (comprising, absorption area, space between
and surrounding the absorption area elements, setbacks and the reserve area): ...... 6.06... cccceteeeeeeee eee eeereeeetees
Other Comments eg special precautions which may be needed: ............... cece eeee
SUMMARY (all sections must be complete)
MY PEON SY StO MN eos... 0 Pecks ss. vos +. cava anna menaannens Nese dkratetediwazangl seater tenet ae eeeene ene em PE PRs
Type of Disposal Area .
Detail of pipe WOrkK...... 2... ee tetas
Emiiters spacings... .Spray spacings.
Manifolds............... Flush Out VaIVES... 0.2... cece eee eee eee ee eee eees Air relief valves. . He 20h
Slope at Disposal Area... 00... ees % Surface Irrigation fixed sprinklers only (max 20 % ‘slope)
Movable sprinklers spray area must cover minimum 50% of LAA, Surface Irrigation area to be mulched and
planted to ensure effluent is contained within designated area
Detail of surface pollution control: sssesscssssssarsciegeattig vars sdotiiad wevieaeespepnmgeeaxoereggennrenamazrenseseny
Size of diversion mound /Cut of drains... 0.0... eee Size of retention MOUNA!.............: cc eects ee eee eee eeee
Soil modifications ripped / import soil /mulched / planted (Please circle best description)
Bedrooms:............0.05 Equivalent persons:............ DIG RAD Rss: nosecrene- a Litres/person/day.........0......::0ceeees
Total Load of all system on the property over 20 EP (Please tick box) YES NO C1
Holding Tank position and size on site plan including pump out line position (Please tick box) yesO) NOOO
Page 11
v-0zL0rL “ON Bq pléedes—sreq_|PO6L Zyrs (20) xed \ Sgr OLE BZHO Ud
3 | ee ace ed aorta Lun ‘WVYOVIG SIHL 440 NOISNSWIG LON OG
(0100: ‘
peoy sooo oer qooloig SNOLLVDLISTANK” S “punos6 mo} 0) punoi6 y6iy
woy jusipes6 eBejueded e se painseaw
Jesodsig jusn|y3 SyS-uO - NYId JLIS HLL NVITVULsn N. adojg *2-2,
pevivS8 Zyb LING \ “BINWO} JO ¥SU BY} BONp|s 0} wWo}sks ay} Jo UBisepas D esnbes AoW suejowOIOd
Loo-Sav ON big uy 0} UonoUOA Auy so} poubisap ueeq soy ways{s su] YOIUR JO} sseyoWOIOd ayy spoJep ALOWUNS siYL ‘UOHEOO] BOULOG 1, @
“SWP}P 40} (¥)OZIOPL “ON Hoda, s9j04 “mojaq AsOWUUNS yuONY)I aldoag 9 wono|ndog WNWIXOW
ayy W payoulwou asayR pasn aq 0} 240 sainxy uoyoNpal 52}0K “7
“yaquinid pavaysibas 0 Aq payaiduoo puo ueyo}sepun aq 0) s! 40m ayL -g. SUD] 96010}S 9}IS—UE Ki iddns J9}0M S901] PelaHeoS
“(W)OZIOF ON “Yodey B 9 sasseig uoneyeBon,
vondosgy suonp6ijsaau) Jog uDyoqsny puo syuows: 7 XC $8) Sasnyxij UO!ONPaY 42}0K acon, eBeuleIg
se reall tL ae XS ON| — pauinbay yuawanrosdwut {10S eens
Roy voyoNs|sUeD souEUIWOD Jou Og “(y)OZLOFI ON NS wrbs ZZ pouinbay Dady
S2AY| [OS UOHOISNY Jo sjuawasinbes puD si : 000151 9P95
S10\9P poyooy]0 a4} YIM UoRoURTUED UL POEL 99 0} X uo!,06144) aoDjung—qng wajsks josodsiq Wiss
fi d of
mune sical Aa DAP Mes MERE e wa3sks, Juguyjoes Aiopuosas, paouonpy waysts uonooyddy
“SyuDgsuoo ays S
AYVWWNS IN3N1I43
pup sapoub adid wnwuluiw ‘sjasyo wnusuius pajou ayy yy saUDp0900
Ul 9IS—UO paulua}ep aq 0} si da10 Josodsip ay} jo uoIsod jouy ay) °Z
“BuMDIp sIy) WO 2I09S JOU Og “|
: SB]ON [OIBUa5 \
“Daud
jpsodsp 0} Azopunog
‘Ayadoig adojsunog
twos (peyo ~UH WO
“volo aly jo sayawued ayy punoiD
JJouns s2,0KULO}S JO OISJAAIP Joy
ung 40 punow ao0jins 0 aplAoig
“2S vO paulUayep
4 0} vorD90) puo 2216 jouy
jobs} Bo0}ING—qng ws ZyZ
“peay uojooyddo puny
“D8J0 WO} KOYZ8K0 |dD0)INS
40 yuauiyoyD9 40) pung 40 punow
vvotsuajo, padoaspun| apinorg
“ASNOH d3SOdOUd SHL Ni GATIVISNI
3d OL SUV SSYNLXId NOLLONGSY Y3LVM
ougee'y - daly
4o Ayunog
sip phe coe 40 ysuiog
[PUOSDAS [0 WO) 4904}85 “NIN WO) 6SZE7Z dS ON dy
$l Jequinu 307
]
|
| \
|
eq uoydioseg} uolsiAgy