Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Planning Report

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

4.0 Works and Overlay Codes
Approval is sought for Operational Works.

RECOR provides engineering plans and a stormwater design. A landscaping plan is also provided
as part of the proposal plans which includes landscaped area and some planting detail for screening
vegetation along the side boundaries and front setbacks. The landscape package has been prepared
by Element Design.

It is noted that The Noosa Plan does not require maneuvering of vehicles in a forward gear onto local
roads.


5.0 State assessment and other matters

5.1 State interests
5.1.1 Matters established in the Planning Regulation

Nil

5.1.2 State Planning Policy

The SPP includes assessment benchmarks that may be applicable where a local government
planning scheme does not adequately reflect the SPP. The Noosa Plan 2020 appropriately integrates
all SPP provisions, except for Natural Hazards, risk and resilience – coastal hazards – in part. The
application does not trigger assessment against for coastal hazards.




                                                                                         Page 12 of 13
Log in to download the original file

Planning Report.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.