Council archive · source document
planning report bottlebrush 17 · MCU26/0001
Figure 4 - Backfill to NGL
The development on the sloping site follows the natural landform where practical, consistent with the
relevant Performance Outcomes.
4.4 Setbacks
The design includes a partial encroachment by the 3rd storey eave and the basement encroaches
into the side and rear setbacks. A tear drop portion of the eave for the third storey is setback 9.31m
from Bottlebrush Ave, as highlighted below.
Figure 5 - Eave encroachment
Page 8 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
planning report bottlebrush 17.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.