Translink Routes 620, 622, 626, 627, 628, 629, 630, 631 and 632. Services operate 7 days a week, with a
frequency of 10-15 during peak period and 30 minutes off-peak.
Pedestrians
Formal pedestrian footpath is provided along both Banksia Avenue and Serenity Close providing connections
to the surrounding area.
Cyclists
Under the Noosa Plan Transport Elements (Map 3), the surrounding area is identified as SEQ Principal Cycle
Network and Priority Routes as shown in Figure 3-1.
Legend
Figure 3-1: SEQ Principal Cycle Network & Priority Routes (Map 3), Source: Noosa Mapping
3.3 Road Planning
TTM has reviewed Council’s Local Government Infrastructure Plan (LGIP) and identifies the following future
upgrades in the vicinity of the subject site:
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 11
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.