Table 9-1: Summary of Sidra Outputs (Noosa Drive and Coral Tree Avenue Roundabout)
Scenario DOS Average Delay LOS 95th Percentile Critical Queue (m)
Overall Worst Movement Overall Worst Noosa Drive Coral Tree Noosa Dr
Movement (E) Ave (N) (W)
Weekday - AM Peak Hour
2022 Survey 32.1% 5.1 sec 13.7 sec A B 18.1m 1.8m 17.5m
(U-turn Noosa Dr W)
2024 Base 32.9% 5.2 sec 13.7 sec A B 18.8m 1.9m 18.1m
(U-turn Noosa Dr W)
2034 Base 37.5% 5.2 sec 14.0 sec A B 22.4m 2.3m 21.7m
(U-turn Noosa Dr W)
2024 Base + 34.8% 5.1 sec 13.7 sec A B 19.7m 2.0m 19.6m
Development (U-turn Noosa Dr W)
2034 Base + 39.4% 5.2 sec 14.0 sec A B 23.4m 2.4m 23.3m
Development (U-turn Noosa Dr W)
Weekday - PM Peak Hour
2022 Survey 41.8% 5.1 sec 12.0 sec A B 29.1m 1.0m 17.7m
(U-turn Noosa Dr W)
2024 Base 42.7% 5.1 sec 12.1 sec A B 30.2m 1.1m 18.3m
(U-turn Noosa Dr W)
2034 Base 48.3% 5.2 sec 12.4 sec A B 37.6m 1.4m 22.1m
(RT Coral Tree Ave N)
2024 Base + 44.3% 5.1 sec 12.2 sec A B 32.4m 1.1m 21.4m
Development (RT Coral Tree Ave)
2034 Base + 49.9% 5.2 sec 12.8 sec A B 40.1m 1.5m 25.6m
Development (RT Coral Tree Ave N)
Weekend – PM Peak
2022 Survey 39.8% 4.9 sec 12.4 sec A B 22.3m 1.2m 22.7m
(RT Coral Tree Ave N)
2024 Base 40.8% 5.0 sec 12.5 sec A B 23.1m 1.2m 23.5m
(RT Coral Tree Ave N)
2034 Base 46.6% 5.1 sec 13.3 sec A B 28.0m 1.5m 28.8m
(RT Coral Tree Ave N)
2024 Base + 45.1% 4.9 sec 13.1 sec A B 25.2m 1.3m 27.5m
Development (RT Coral Tree Ave N)
2034 Base + 51.0% 5.1 sec 13.9 sec A B 30.5m 1.7m 33.4m
Development (RT Coral Tree Ave N)
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement
N – North, S – South, E – East, W – West
9.1.2 Analysis Conclusions
The analysis indicates that the roundabout is expected to operate at suitable levels at the 2034 design year,
with development traffic included, with a worst-case DOS 51.0% (less than 85.0%, operational capacity of
roundabout) and overall LOS A. The addition of the development traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and at most an increase in queuing of
5m (equivalent to 1 vehicle).
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 26
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.