Original source · versioned page text
Traffic Report
Very large file (24.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement N – North, S – South, E – East, W - West 9.2.2 Analysis Conclusions The analysis indicates that the roundabout is expected to operate at suitable levels at the 2034 design year, with development traffic included, with a worst-case DOS 55.7% (less than 85.0%, operational capacity of roundabout) and overall LOS A. The addition of the development traffic has no notable impact to key operational metrics, with minor change to average intersection delay and at most an increase in queuing of 12m (equivalent to 2 vehicles). Based on this assessment, the proposed development is considered to have no adverse impact on the operations of this roundabout. 9.3 Analysis of Grant Street / Banksia Avenue Outlined in Section 5, the access to the development will be achieved with the addition of a fourth leg to the existing Grant Street / Banksia Avenue roundabout. The Sidra layout identified for this intersection is shown in Figure 9-3. This layout is based on the concept intersection documented in TTM Drawing 22BRT0122-01, Revision B, included in Appendix B. Figure 9-3: Grant Street / Banksia Avenue SIDRA Layout Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 29 Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.