                               system. Total iron and aluminium are to be sampled where identified in the document
                               as ‘if required’.
                         iv. Update the figure in Appendix A to also show the stormwater network and specifically
                               the stormwater pit which the dewatering system will discharge into and the outlet
                               headwall.
                         v. Update section 6.4.3 to identify that discharge is to the stormwater network prior to
                               entering the canal system.
                         vi. There seems to be plenty of room in the frontage of the site for establishing a
                               groundwater monitoring bore outside of the excavation and shoring system in which to
                               monitoring groundwater drawdown and quality. Update the monitoring section of the
                               DMP to incorporate such a monitoring location.
                         vii. Section 7 (Noise) is to be updated to refer to the default noise standard for pumps in
                               Section 440T of the EPA Act. The EEP (Noise) objectives currently referenced are
                               long-term objectives rather than a specific enforceable standard.
                         viii. Provide dilapidation reports for neighbouring properties and any other structures or
                               infrastructure identified as being within the estimated cone of depression associated
                               with the groundwater drawdown.

               •      The applicant has submitted representations that amendments be conditioned prior to the
                      prestart meeting due to planned amendments to the report once construction methods are
                      finalised. This is considered acceptable to Council and is generally in accordance with
                      Condition 32 of MCU22/0171.
               •      The proposed point of discharge (per item iv. above) has been proposed as the existing
                      stormwater pit within the Gympie Tce frontage of the adjoining lot to the east, in front of the
                      existing bus stop. This pit is the closest to the site and most suitable for discharge of the
                      groundwater, and is accepted by Council.

               A Condition will be included to address the required amendments to the Dewatering Plan prior to
               the prestart meeting.




               4.     CONSULTATION
               4.1. Referral Agencies
               Not Applicable

                                                                                                       Page 8 of 21

Document Set ID: 22860610
Version: 5, Version Date: 05/04/2024

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW23 0179.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.