Officer: Tracy Jones
Direct Telephone: (07) 5449 5228
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2009/578
Your Reference:
11 June 2009
Mr Howard McCann
7 Mariners Place
SUNRISE BEACH QLD 4567
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 9 June 2009 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2009/578
Street address: 10 Park Road, Noosa Heads
Real property description: Lot 55 RP 52918
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Operational Works - Landscaping, Access, Stormwater Disposal,
Sediment and Erosion Controls and Filling/Excavation
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Landscaping
1. The site is to be landscaped generally in accordance with Council’s Policy on Landscaping
Guidelines and the approved Landscaping Plans. The approved plans are titled and
numbered: -
Plan / Document No. Rev. Plan / Document Name Date
090405-01 A Landscape Plan – Richard Leathers 05 April 2009
Greenscapes Nursery & Design
Page 1 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 sections
Section 2
2009/578
090420-01 A Existing Tree Plan – Richard Leathers -
Greenscapes Nursery & Design
and may be amended by these conditions.
2. Prior to the commencement of landscaping works, the applicant shall contact Council’s
Ecologist to discuss plant selection and species types.
3. The proposed planting shall comprise native plants and achieve screening to ensure the
development integrates into the surrounding hillside.
4. A qualified arborist shall be present on site to supervise works around the root zones of all
trees required to be retained. Prior to commencing any works safety fences shall be installed
around the trunks and as much of the root zone as possible to minimise the risk of compaction
and damage.
5. A minimum setback of 300mm is required to Trees 49, 53 and 54 with no excavations taken in
proximity to these trees.
6. All works shall be carried out in a manner that minimises disturbance to existing vegetation on
the site.
7. The removal of dead trees shall be carried out in accordance with the recommendations of a
suitably qualified geotechnical consultant.
8. Trees 50 and 56 shall be replaced with minimum 45 Litre pot size Lophostemon confertus
species.
9. Tree 47 shall be replaced with minimum 100 Litre pot size Lophostemon confertus species.
10. Existing trees on the site and within the road reserves are to be retained.
11. All trees must be located a minimum of 1 metre from all services to prevent root/service
conflict and to provide future ease of maintenance requirements
12. All native plant species located in-group plantings shall not be subjected to any hedging
maintenance regimes.
13. All street trees and internal trees 45 litre and greater must be securely staked and tied to
assist their growth during the establishment period.
14. The density of planting must achieve the set out requirements as detailed on the approved
landscape plan.
15. All landscaping treatment shall not unduly restrict or prevent access to service meters within
the site.
16. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
cover and be visible at all times to ensure prompt access in case of emergency.
17. This Development Permit lapses if the development has not happened by 9 June 2011, unless
application to extend the relevant period is approved by Council.
Access, Stormwater Disposal, Sediment and Erosion Controls and Filling/Excavation
18. The development shall be carried out in accordance with the approved plans listed below or as
modified herein: -
Plan / Document No. Rev. Plan / Document Name Date
09007 S0.01 A General Notes – Blakeney Munns 25 May 2009
Consulting Engineers
09007 S0.02 A Site Layout Plan – Blakeney Munns 25 May 2009
Consulting Engineers
Page 2 of 9
Section 3
2009/578
09007 S0.03 A Bulk Earthworks – Building Platform 25 May 2009
Plan – Blakeney Munns Consulting
Engineers
09007 S0.04 A Temporary Piled Retaining Wall Details 25 May 2009
– Blakeney Munns Consulting
Engineers
09007 S0.05 A Site Layout Plan – Blakeney Munns 26 May 2009
Consulting Engineers
09007 S0.06 A Site Layout Plan Stormwater Services – 25 May 2009
Blakeney Munns Consulting Engineers
09007 S0.07 A New Driveway Layout & Section Incl. 29 May 2009
External Works – Blakeney Munns
Consulting Engineers
09007 S0.08 A Entry Retaining Wall Details – Blakeney 25 May 2009
Munns Consulting Engineers
ETC 09-0715 01 Traffic Control Plan 1 – Evolution Traffic 25 May 2009
Control
19. The works shall be carried out in accordance with the Construction Management Plan as
prepared by Blakeney Munz Consulting Engineers.
20. All construction works on site shall be in accordance with the recommendations and onsite
instruction by Morrison Geotechnic or a certified geotechnical engineer approved by Council.
An experienced geotechnical engineer is required to be on site for the whole of the time during
any excavation and house foundations. Such work shall only be carried out during dry weather
conditions. The geotechnical engineer shall also inspect the site periodically throughout the
construction of the dwelling and certify the stability of the structure upon its completion.
Should any risk of sand movement occur - all work shall be suspended until steps (approved
by the Geotechnical engineer in conjunction with Council’s Manager of Building Services)
have been taken to ensure that no further slippage or sand movement will result.
21. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that all structures and the site
are stable. A copy of this certification shall be submitted to Council to be placed on Council
records.
22. Access to the site shall be constructed such that vehicles do not ‘scrape’ the pavement whilst
entering or leaving the site.
23. Roof and surface runoff connection to Council’s kerb and channel/drainage system shall be as
shown on drawing No. 09007-S0.01A. Kerb adaptors shall be used in the kerb.
24. The Traffic Management Plan (TMP) Plan No ETC 09-0715 by Evolution Traffic Control for the
development addressing all construction phases shall be supported by documentation
prepared by suitably qualified persons and submitted to Council for approval prior to the pre
start meeting. The documentation shall address, but not be limited to, all items listed below,
and shall be flexible in that it addresses all stages of the development:-
24.1 A single nominated access location to and from the site.
24.2 The plan should detail the routing of trucks to and from the site, bearing in mind the
load limit on Park Road of 9 tonnes.
24.3 Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
Page 3 of 9
Section 4
2009/578
24.4 Provision of safe cycle and pedestrian movements in the vicinity of the development
on Park Road.
24.5 No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
24.6 Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and Transport Infrastructure (Roads) Act.
24.7 Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
24.8 Traffic control is to be provided so that there are no delays to the general traffic using
Park Road.
25. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
26. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
27. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
28. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
29. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff.
30. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
31. An inspection is to be carried out with the relevant Council officers, the Contractor and
Supervising Engineer after building footprints have been established, and prior to clearing
being carried out. This inspection is to deal with the limits of clearing to be carried out for this
development. This meeting is to take place prior to the “Pre-start” meeting.
32. Council standards shall apply to these works unless otherwise modified herein.
33. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
Page 4 of 9
Section 5
2009/578
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
Chief Executive Officer, Sunshine Coast Regional Council.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request the Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
34. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
35. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
36. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
37. Safe pedestrian access on Park Road in the vicinity of the development shall be maintained at
all times. Should footpath / road closures be necessary to carry out construction works,
Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the
proposed closure.
38. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No<, it is the site's supervising engineer who is
responsible for ensuring that the sediment and erosion control measures have been designed
by an RPEQ or CPESC and constructed:
i. In accordance with "best practise" methods,
ii. Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
iii. Revised to address predicted rainfall events, and
iv. Achieve the desired environmental outcomes.
Council’s CEO may request further controls to be installed should approved measures be
inefficient.
39. These works are also to be in compliance with the relevant conditions of Development Permit
No. 22441 DA.
40. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
Page 5 of 9
Section 6
2009/578
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
090405-01 A Landscape Plan – Richard Leathers 05 April 2009
Greenscapes Nursery & Design
090420-01 A Existing Tree Plan – Richard Leathers -
Greenscapes Nursery & Design
S0.01 A General Notes – Blakeney Munns 25 May 2009
Consulting Engineers
S0.02 A Site Layout Plan – Blakeney Munns 25 May 2009
Consulting Engineers
S0.03 A Bulk Earthworks – Building Platform 25 May 2009
Plan – Blakeney Munns Consulting
Engineers
S0.04 A Temporary Piled Retaining Wall Details 25 May 2009
– Blakeney Munns Consulting
Engineers
S0.05 A Site Layout Plan – Blakeney Munns 26 May 2009
Consulting Engineers
S0.06 A Site Layout Plan Stormwater Services – 25 May 2009
Blakeney Munns Consulting Engineers
S0.07 A New Driveway Layout & Section Incl. 29 May 2009
External Works – Blakeney Munns
Consulting Engineers
S0.08 A Entry Retaining Wall Details – Blakeney 25 May 2009
Munns Consulting Engineers
ETC 09-0715 01 Traffic Control Plan 1 – Evolution Traffic 25 May 2009
Control
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” (Form 2Development
Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
Page 6 of 9
Section 7
2009/578
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Nil
11 SELF ASSESSABLE CODES
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Tracy Jones
SENIOR PLANNING OFFICER
Page 7 of 9
Section 8
2009/578
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 8 of 9
Section 9
2009/578
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 9 of 9
Used in these records
001AB810.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2009.00000578.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.