Performance outcomes                            Acceptable outcomes                                                Response   Comment
                                                contained in the National assessment guidelines for dredging,
                                                Australian Government Department of Environment, Water,
                                                Heritage and the Arts, 2009.

Within a wild river area: riparian and wildlife corridor functions
PO4 The clearing of native marine plants        AO4.1 Clearing of marine plants within a wild river area
within a wild river area is minimised.          can only occur to the extent of the works, plus the
                                                prescribed area around the development to allow for
                                                maintenance.

PO5 Development within a wild river area        No acceptable outcome is prescribed.
does not impact fish passage.
PO6 There is no net loss in marine plants       AO6.1 Any marine plant damaged during construction in a
beyond the extent of the works in a wild        wild river area is replaced at the completion of the
river area.                                     development with the same species of plant in the
                                                disturbed area outside the footprint of the development.

PO7 Works within a wild river area does         AO7.1 Works located in tidal waters within a wild river
not impact on fish habitat values.              area are designed and constructed using materials, and
                                                located to ensure that the activities do not impact on fish
                                                habitat values and function.

Within a wild river area: hydrological processes
PO8 Development within a wild river area No acceptable outcome is prescribed.
does not impound natural drainage lines
or flow paths, during both construction
and operation.
Within a wild river area: geomorphic processes
PO9 Excavation and filling for prescribed       No acceptable outcome is prescribed.
tidal work within a wild river area is
carried out only to the extent necessary
for the development.
PO10 Works in a tidal area within a wild        AO10.1 Where it is necessary to remove a marine plant,
river area are designed and constructed         the root system must be left in the substrate to minimise
in a way to ensure they do not adversely        disturbance to bed and banks.
affect the stability of the bed and banks       AND
of any waterway.
                                                AO10.2 When the works are completed, any tidal lands
                                                disturbed by activities beyond the footprint of the works
                                                are restored to pre-disturbance condition to promote



State development assessment provisions                                           Module 10 — Coastal protection                 21 June 2013   Page 14 of 15
10.1 Tidal works, or development in a coastal management district state code
Log in to download the original file

Attachment D - SDAP Module-10-.pdf · 82 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.