Original source · versioned page text
Attachment D - SDAP Module-10-
Performance outcomes Acceptable outcomes Response Comment
example, 12 hours).
AND
AO2.2 Development within a coastal hazard area is N/A
located, designed and constructed to ensure exposed
structures can sustain flooding from a defined storm tide
event.
AND
AO2.3 Essential community service infrastructure is: N/A
(1) located so that it is not inundated by a recommended
storm tide event specified for that infrastructure, or
(2) located and designed to ensure any components of
the infrastructure that are likely to fail to function or
may result in contamination when inundated by a
storm tide (for example, electrical switch gear and
motors, water supply pipeline air valves) are:
(a) located above the peak water level for a
recommended storm tide event, or
(b) designed and constructed to exclude storm tide
intrusion or infiltration (including by being located
in the ground), or
(c) able to temporarily stop functioning during a
recommended storm tide event without causing
significant adverse impacts to the infrastructure
or the community.
AND
AO2.4 Emergency services infrastructure and emergency N/A
shelters, police facilities, and hospitals and associated
facilities have an emergency rescue area above the peak
water level for a recommended storm tide event.
AND
AO2.5 Redevelopment of existing built structures avoids Complies The proposal simply replaces an existing dwelling with a
increasing the exposure of people and permanent detached house.
structures to adverse coastal hazard impacts (including
impacts on the development’s ongoing operation).
PO3 Development directly, indirectly and AO3.1 Development avoids increasing the number of N/A There will be no increase in premises within the coastal
cumulatively avoids an unacceptable premises from which people would need to be evacuated zone.
increase in the severity of the coastal to prevent death or injury from a defined storm tide event.
hazard, and does not significantly
increase the potential for damage on the
premises or to other premises.
PO4 Development avoids the release of AO4.1 Development that involves the manufacture or N/A
State development assessment provisions Module 10 — Coastal protection 21 June 2013 Page 2 of 15
10.1 Tidal works, or development in a coastal management district state code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original