ORDINARY MEETING AGENDA                                                            21 JUNE 2018


              d.    Tree 28, the Endiandra sieberi (Corkwood), must be monitored and
                    protected from construction activities in accordance with an operational
                    works approval which details the following information:
                    i.    an advanced arboriculture inspection of the root plate and collar in
                          accordance with the ISA Tree Risk Assessment procedure. The
                          arboriculture inspection must be in the company of Council’s
                          delegate. The permit applicant shall meet the reasonable cost of
                          Council’s delegate attending the inspection.
                    ii.   landscaping works within the tree protection zone must be
                          undertaken under the direction of the Project Arborist.
        Landscaping Works
        64.   The development site must be landscaped. The works must be undertaken
              generally in accordance with the Miles Baldwin Design report listed within this
              Decision Notice and a further Operational Works approval. The Operational
              Works must include the following at a minimum:
              a.    Details of local native tree and understory species to be installed to the site
                    including upslope of Tree 28, the Endiandra sieberi (Corkwood) and over
                    the access tunnel.
              b.    Methods to be engaged in the establishment and maintenance of the
                    required landscaping including arborist recommendations.
              c.    Details of reinstatement of the soils to the roof of the access tunnel and
                    methods to ensure slope stability in both short-term and long term.
              d.    Landscaping details to ensure the development is visually screened with
                    vegetation when viewed from Main Beach by maintaining and enhancing
                    the existing canopy structure.
        Geotechnical
        65.   The works must be carried out in accordance with the recommendations of a
              Slope Stability Assessment which must be prepared by a suitably qualified
              person. The Slope Stability Assessment must be submitted to Council prior to
              the issue of Operational Works (Landscaping) The recommendations of the
              Slope Stability Assessment must not be in conflict with the requirements of the
              Tree Protection Plan or Construction Management Plan referred to in Condition
              62.
        Construction Management
        66.   The works must be carried out in accordance with an approved Construction
              Management Plan for the tunnel access way development. The Construction
              Management Plan dated 22 March 2018 must be amended to detail the removal,
              storage and replacement of soils for the tunnel access way and submitted to
              Council prior to the issue of a Development Permit for Operational Works
              (Landscaping).
        67.   Security in the form of a cash bond or trading bank guarantee to the sum of
              $20,000 must be submitted to Council, to secure performance of all conditions of
              this approval, prior to the issue of a Development Permit for Operational Work
              (landscaping). The cash bond or trading bank guarantee will be returned on
              performance of the conditions of approval less any costs incurred by Council in
              respect of enforcing performance of this permit. Council reserves the right to call
              upon the bond or guaranteed sum to effect compliance with conditions.
   B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                                      Carried.

                                                                                    Page 8 of 16
Log in to download the original file

2018-07-19 Ordinary Meeting Agenda(PDF, 520KB).pdf · 532 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.