ORDINARY MEETING AGENDA 21 JUNE 2018
d. Tree 28, the Endiandra sieberi (Corkwood), must be monitored and
protected from construction activities in accordance with an operational
works approval which details the following information:
i. an advanced arboriculture inspection of the root plate and collar in
accordance with the ISA Tree Risk Assessment procedure. The
arboriculture inspection must be in the company of Council’s
delegate. The permit applicant shall meet the reasonable cost of
Council’s delegate attending the inspection.
ii. landscaping works within the tree protection zone must be
undertaken under the direction of the Project Arborist.
Landscaping Works
64. The development site must be landscaped. The works must be undertaken
generally in accordance with the Miles Baldwin Design report listed within this
Decision Notice and a further Operational Works approval. The Operational
Works must include the following at a minimum:
a. Details of local native tree and understory species to be installed to the site
including upslope of Tree 28, the Endiandra sieberi (Corkwood) and over
the access tunnel.
b. Methods to be engaged in the establishment and maintenance of the
required landscaping including arborist recommendations.
c. Details of reinstatement of the soils to the roof of the access tunnel and
methods to ensure slope stability in both short-term and long term.
d. Landscaping details to ensure the development is visually screened with
vegetation when viewed from Main Beach by maintaining and enhancing
the existing canopy structure.
Geotechnical
65. The works must be carried out in accordance with the recommendations of a
Slope Stability Assessment which must be prepared by a suitably qualified
person. The Slope Stability Assessment must be submitted to Council prior to
the issue of Operational Works (Landscaping) The recommendations of the
Slope Stability Assessment must not be in conflict with the requirements of the
Tree Protection Plan or Construction Management Plan referred to in Condition
62.
Construction Management
66. The works must be carried out in accordance with an approved Construction
Management Plan for the tunnel access way development. The Construction
Management Plan dated 22 March 2018 must be amended to detail the removal,
storage and replacement of soils for the tunnel access way and submitted to
Council prior to the issue of a Development Permit for Operational Works
(Landscaping).
67. Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the issue of a Development Permit for Operational Work
(landscaping). The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried.
Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.