Skip to the record
Every meeting, every word.

Council archive · source document

000A88A4.124.tif · 132003.221037

From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.

From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.

of 1

Text shows just the words. Original shows the document exactly as it was published.

rm

¢ Cardno
. AMBK
Salinity

MEDLI results indicate an average electrical conductivity (EC) of irrigation water to be 0.4 dS/m
and a 0% reduction in grass yieid due to salinity.

The MEDLI model has indicated that the existing soil conditions and the expected effluent
characteristics will allow for adequate absorption of effluent irrigation as proposed for this
development. .

The area required for optimal efficiency of effluent irrigation is 6.5 ha and can be
accommodated throughout the site. Final irrigation areas will be sized and identified during the
detailed design phase of the project An irrigation management plan will be developed during the
detailed design phase to ensure that all aspects of the proposed effluent re-use scheme are
considered.

 

PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003
LA7296-03\ReporNFINAL REPORT - 18Sept03,doc Commercial in Confidence Page 16

Used in these records

About this file

File size
20 KB (small file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

000A88A4.124.tif · 20 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.