CONCEPT STORMWATER
 MANAGEMENT REPORT

                                             FOR

COOROY RETIREMENT VILLAGE
                Trading Post Road
                                    Cooroy

                              RSL Care Pty Ltd
                                October 2007

        Report Number B07056.W
                      B07056.W-
                        7056.W-01A




   BROWN CONSULTING
                              Engineers & Managers
                                 ABN 38 109 428 506
    Telephone: 07 3231 5555 Facsimile 07 3231 5500
         Level 3/410 Queen Street, Brisbane Qld 4000
           Email:[email protected]
                Web: www.brownconsulting.com.au
    PEOPLE & PROJECTS
Full text of the other 70 pages

Page 2

Concept Stormwater Management Plan
RSL Care — Cooroy Retirement Village

  

 

- oS
=
=
=
=

COMMERCIAL IN CONFIDENCE

Alt intellectual property rights, including copyright, in designs developed and documents created by Brown
Consulting (Qld) remain the property of this company. Any use made of such design or document without the prior
writen approval of Brown Consulting (Qld) will constitute an infringement of the rights of the company which
reserves all legal rights and remedies in respect of any such infringement.

The information, including any intellectual property, contained in this proposal is confidential and proprietary to the
Company. It may only be used by the person to whom it is provided for the stated purpose for which it is provided
and must not be imparted to any third person without the prior written approval of the Company. The Company
reserves all legal rights and remedies in relation to any infringement of its rights in respect of its confidential
information.

©
Brown Consulting (Qld) Pty Ltd

 

 

2007
DOCUMENT CONTROL
B07056.W-01
Issue Date Issue Details Author Checked Approved
A 23/10/07 | For Approval kus | MS {
AMcP (RPEQ 6921) A.

 

 

 

 

 

 

 

 

 

 

 

BO7056.W-01A.doc Page i

Page 3

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                                 CONCEPT
                        STORMWATER MANAGEMENT PLAN
                                                                        FOR
             RSL CARE, COOROY RETIREMENT VILLAGE
                   TRADING POST RD, COOROY
                                              TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................................. 1
2.0 SITE CHARACTERISTICS.................................................................................................. 2
     2.1 Location .......................................................................................................................................2
     2.2 Topography and Site Drainage....................................................................................................2
3.0 HYDROLOGICAL INVESTIGATION ................................................................................... 4
     3.1 DRAINS Model Setup ..................................................................................................................4
         3.1.1 DRAINS Input Data.......................................................................................................... 4
     3.2 Existing Catchment......................................................................................................................5
         3.2.1 Existing Catchment Characteristics ................................................................................. 5
     3.3 Developed Catchment Characteristics ........................................................................................5
         3.3.1 Developed Catchment Characteristics ............................................................................ 5
     3.4 Existing and Developed Catchment Results................................................................................6
4.0 FLOOD INVESTIGATION ................................................................................................... 8
5.0 DETENTION BASIN MODELLING...................................................................................... 9
     5.1 Concept Detention Basin Design.................................................................................................9
     5.2 Mitigated Scenario Results ........................................................................................................10
6.0 STORMWATER QUALITY ................................................................................................ 11
     6.1 Pollutants of Concern / Water Quality Objectives......................................................................11
         6.1.1 Regional Water Quality Guidelines................................................................................ 11
     6.2 Stormwater Quality Management Strategy................................................................................13
     6.3 MUSIC Modelling.......................................................................................................................14
         6.3.1 Meteorological Data....................................................................................................... 14
         6.3.2 Source Nodes ................................................................................................................ 15
         6.3.3 Drainage Links............................................................................................................... 15
         6.3.4 Treatment Nodes ........................................................................................................... 15
     6.4 MUSIC Modelling Results..........................................................................................................17
7.0 WATER BALANCE MODELLING ..................................................................................... 19
     7.1 Proposed Measures...................................................................................................................19
     7.2 Water Balance Methodology......................................................................................................19
         7.2.1 Rainfall Data .................................................................................................................. 19
         7.2.2 Roof Details ................................................................................................................... 20
         7.2.3 Usage ............................................................................................................................ 20
     7.3 Water Balance Results ..............................................................................................................20
         7.3.1 Existing & Developed Scenarios.................................................................................... 20
         7.3.2 Mitigated Scenario ......................................................................................................... 21
8.0 WATER SENSITIVE DESIGN CODE RESPONSE ........................................................... 22
9.0 CONCLUSIONS AND RECOMMENDATIONS.................................................................. 24
10.0 REFERENCES................................................................................................................ 25
11.0 APPENDICES ................................................................................................................. 25




B07056.W-01A.doc                                                                                                                              Page ii

Page 4

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                            CONCEPT
                   STORMWATER MANAGEMENT PLAN
                                                         FOR
          RSL CARE, COOROY RETIREMENT VILLAGE
                TRADING POST RD, COOROY

1.0       INTRODUCTION
Brown Consulting (QLD) Pty Ltd has been commissioned to prepare a Concept Stormwater Management Plan to
support the Development Application for the development of an existing rural site at Cooroy. The proposal for
the development comprises:
    •    118 Independent Living Units (ILU’s)
    •    2 Apartment Buildings
    •    Village Centre Community Building
    •    Residential Aged Care Building (120 beds)
    •    Internal Roads
    •    Car Parking Facilities
    •    Landscaping, and
    •    Water Management Systems including communal underground rainwater tanks for reuse, and two water
         quality control ponds incorporating stormwater detention.

This Stormwater Management Plan has been prepared according to The Noosa Plan (February 2006) and
Queensland Water Quality Guidelines (2006). The report comprises the following:
    •    Hydrological investigation for the two gullies on the site;
    •    Flood inundation investigation for the lower reaches of the two gullies;
    •    Detention basin investigation including concept detention basin sizing to mitigate peak flow rates to
         existing flow rates;
    •    Stormwater Quality Management Strategy outlining a treatment train of suitable Stormwater Quality
         Improvement Devices (SQID’s) to achieve relevant water quality objectives;
    •    Water Balance Modelling to demonstrate that the increase in runoff volumes from the proposed
         development can be mitigated;
    •    Response to Noosa Council’s Water Sensitive Design Code is provided to show compliance with the
         code has been achieved.

The methodology of the analyses, measures proposed, results and drawings are presented in the report.




B07056.W-01A.doc                                                                                        Page 1

Page 5

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



2.0       SITE CHARACTERISTICS
2.1                Location
The site of the proposed development is located at 19 Trading Post Road, Cooroy with Real Property Description
Lot 1 RP 215922. The site is located approximately 1.5 km North of Cooroy Railway Station.

The site is bounded by Trading Post Road and an undeveloped lot to the east, rural residential lots to the north,
Pearsons Rd to the south and Cooroy Connection Road (Elm Street) to the west and has an area of 9.51 ha.

Figure 1 below indicates the approximate location of the site.




                                        SITE




                                                                                                        N




                            Figure 1.1: Approximate Location of Site (source: UBD 2006)

2.2                Topography and Site Drainage
The site is located on the eastern side of a north-south ridge line upon which is a railway corridor. The site
therefore falls from the western boundary with Cooroy Connection Road to the eastern boundary with Trading
Post Road and the neighbouring eastern lot. The highest point on the site is near the intersection of Cooroy
Connection Road and Pearsons Road at RL 111 m AHD. The lowest point on the site is where the existing
northern dam discharges across the eastern boundary at approximately RL 99 m AHD.
B07056.W-01A.doc                                                                                          Page 2

Page 6

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

Stormwater runoff from areas external to the site, including part of the railway corridor and Cooroy Connection
Road, discharge to the site at two locations. Runoff drains through existing gullies from each of these locations.
The gullies are referred to as ‘northern gully’ and ‘southern gully’. The average grade of the northern gully is
approximately 1.8% and the southern gully is approximately 3.5% as measured from the western boundary to
the eastern boundary.

Each gully leads to existing dams on the eastern side of the site. Both gullies discharge across the eastern
boundary to neighbouring rural lots. The dams are referred to as ‘northern dam’ and ‘southern dam’.

The existing scenario stormwater catchment plan is presented in Drawing No. B07056-SK01 of Appendix A.




B07056.W-01A.doc                                                                                           Page 3

Page 7

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



3.0        HYDROLOGICAL INVESTIGATION
In order to assess the impact of the proposed development and the effectiveness of mitigating the increase in
flows, a hydrological analysis was undertaken. This analysis involved the following investigation.
      •   Identifying the appropriate catchment for the site and land uses,
      •   Modelling of the existing catchment using DRAINS Modelling Software (Version 2006.01),
      •   Modelling of the catchment with the proposed allotment development and comparison to existing
          scenario results,
      •   Calibration of the developed scenario DRAINS Model to the Rational Method,

Design and modelling of concept detention basins to ensure developed peak discharges from the proposed
residential development do not exceed those from the existing scenario is undertaken in Section 5.0.

3.1                DRAINS Model Setup
The existing and developed scenario flow rates were analysed using the computer package DRAINS. DRAINS
analysis enables both the hydrological and hydraulic modelling of the site for numerous design storm events and
land uses. DRAINS calculates the full hydrographs of flows resulting from the specified rainfall hyetographs.
Design storm bursts from Australian Rainfall and Runoff 1987 are used for generation of hyetographs. This
section sets out the various assumptions and procedures used in developing the DRAINS modelling.

3.1.1              DRAINS Input Data

DRAINS uses an ILSAX type hydrological model. A soil type 3 was adopted to reflect slow infiltration rates. An
antecedent moisture condition (AMC) of 3, reflecting fairly frequent catchment wetting was also used. Paved and
supplementary areas had depression storage of 1 mm and grassed areas have storage of 5 mm.

Rainfall storms for modelling were entered into DRAINS using intensity values for the area interpolated from
Noosa Council Standard Drawing 9232 ‘Rainfall Intensity Curves Plateau (Tinbeerwah to Black Mountain)’.
Cooroy falls within Zone 3 – North East Coast Rainfall Zone (Figure 3.1 of ARR87). The IFD curve used is
presented in Appendix B.

Modelling was performed for the 2, 5, 10, 20, 50 and 100 year ARI storm events with storm durations of 5, 10,
15, 20, 25, 30, 45, 60, 90 and 120 minutes. Intensity values corresponding to these storm events and durations
are presented in Appendix B.

Further input data to DRAINS that is required for catchments are detailed in Sections 3.2.1 and 3.3.1.




B07056.W-01A.doc                                                                                         Page 4

Page 8

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village


3.2                Existing Catchment
3.2.1              Existing Catchment Characteristics

For the existing scenario analysis, the site was divided into two sub-catchments representing the northern and
southern gullies and discharge locations as shown in Drawing B07056-SK01 in Appendix A.

The site is considered totally pervious, with the only contribution to impervious areas being Cooroy Connection
Road to the west of the site.

Catchment areas and impervious proportions are presented in Table 3.1 below.
                    Table 3.1: Existing Sub-Catchment Areas and Percentage Impervious Values
                                                     Area            Impervious Area
                      Sub Catchment                                                         % Impervious
                                                      (ha)                 (ha)
                            North                     7.40                3.27                   5
                            South                     6.26                2.86                   5
                            Total                    13.66                   -                   -



3.3                Developed Catchment Characteristics
3.3.1              Developed Catchment Characteristics

For the developed scenario analysis the site was again divided into two sub-catchments. The divide between the
sub-catchments was located based on the alignment of proposed roads and expected bulk earthworks. The
developed scenario catchment plan is presented on Drawing B07056-SK02 in Appendix A.

Catchment areas and impervious proportions are presented in Table 3.2 below. Note, that modelling was
undertaken using the higher impervious percentage value shown in the table and is therefore conservative.
                   Table 3.2: Developed Sub-Catchment Areas and Percentage Impervious Values
                                                     Area            Impervious Area
                      Sub Catchment                                                  % Impervious*
                                                      (ha)                 (ha)
                           North                      7.00                 2.33         35 (33)
                           South                      6.58                 3.02         50 (46)
                        Entrance Rd                  0.089                0.036         45 (41)
                           Total                     13.59                   -             -
                                    * Actual values (bracketed) rounded up to nearest 5%.




B07056.W-01A.doc                                                                                           Page 5

Page 9

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village


3.4                Existing and Developed Catchment Results
Peak discharge rates for the existing and developed catchments from DRAINS modelling are shown in
Table 3.3.
                      Table 3.3: Existing and Developed DRAINS Modelling Peak Flow Rates
                                          Existing Peak Discharge Developed Peak Discharge
                            ARI                    (m3/s)                    (m3/s)
                                                          Sub Catchment: North
                          2 Year                    1.12                      1.81
                          5 Year                    1.56                      2.36
                         10 Year                    1.82                      2.73
                         20 Year                    2.16                      3.18
                         50 Year                    2.62                      3.62
                         100 Year                   2.91                      3.94
                           ARI                            Sub Catchment: South
                          2 Year                    0.95                      1.53
                          5 Year                    1.32                      2.02
                         10 Year                    1.54                      2.30
                         20 Year                    1.83                      2.69
                         50 Year                    2.22                      3.11
                         100 Year                   2.46                      3.46


Results show that both developed catchments require stormwater detention controls to mitigate the increase in
peak flows that result from the development. Stormwater detention measures are discussed in Section 5.0.

A check was made using the Queensland Rational Method as a comparison with the existing scenario peak
discharge results from DRAINS. Input data for the Rational Method calculation is presented in Table 3.4.

          Table 3.4: Rational Method Input Data for Existing Scenario North and South Sub-Catchments
                               Sub-Catchment                        North                 South
                            Sub-Catchment Area                      7.40 ha              6.26 ha
                             Fraction Impervious                     0.05                 0.05
                                     C10                             0.71                 0.71
                              Frequency Factor
                                                                      1.2                  1.2
                            (100 year ARI event)
                        *Time of Concentration Range           21 - 30 minutes       21 – 31 minutes
                                                                Interpolated           Interpolated
                               Rainfall Intensity
                                                              (See Appendix B)      (See Appendix B)
              * Time of Concentration Range determined from various calculation methods (See Appendix B).

The 100 year ARI event peak DRAINS discharges for each sub-catchment are compared with the Rational
Method peak discharges in Table 3.5.




B07056.W-01A.doc                                                                                            Page 6

Page 10

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                                  Table 3.5: Comparison of 100 year ARI flow rates
                               Sub-Catchment                         North                 South
                               Rational Method
                                                                2.59 – 3.02 m3/s     2.17 – 2.56 m3/s
                            Peak Discharge Range
                           DRAINS Peak Discharge
                                                                   2.91 m3/s             2.46 m3/s
                      (*Time of Concentration = 28 mins)
          * Time of Concentration for the north and south catchments are the same. However, the southern catchment
                              has a longer length of catchment despite a smaller catchment area.

The results from the DRAINS model fit well within the range of Rational Method peak discharges, therefore the
peak flows determined by DRAINS are considered appropriate.

For DRAINS model layouts and results refer to Appendix B.




B07056.W-01A.doc                                                                                               Page 7

Page 11

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



4.0       FLOOD INVESTIGATION
A search of Noosa Council’s Planning and Development publications was undertaken. It was found that the site
falls within the Cooroy and Lake McDonald Locality Plan. The Natural Hazard: Landslide and Flooding Overlay
to this locality (Map OM3.3) shows that the site does not fall within the flood hazard area as nominated by
Council.

Using the peak flows presented in Section 3.4, existing peak flood levels for the 100 year ARI storm has been
determined using weir and Manning’s equations across the downstream extents of the northern and southern
dams.

A total of six cross sections have been used to determine the existing peak flood levels. Two sections were used
for weir equations across the northern dam, as flows are limited by two distinct control points in topography.

Four sections were used across the southern dam. As the second section was located across an existing
embankment the weir equation was utilised in this location. The Manning’s equation was used for all other
sections, assuming a roughness of 0.045. Channel slope was adopted from the survey provided.

The upstream and downstream water surface levels determined for the 100 flood levels at each location are
presented below in Table 4.1. A detailed summary of the weir and Manning’s equation calculations is presented
in Appendix C.
                                  Table 4.1: Calculated 100 year ARI Flood Levels
                                                            Flood Level (m. AHD)
                                Extent
                                                    Northern Dam          Southern Dam
                              Upstream                 100.60                 102.88
                             Downstream                 99.69                 101.15


Flood extents for the existing 100 year ARI flows have been determined and plotted. Refer to the Existing Flood
Extents plan (Drawing No. B07056-SK10) in Appendix A for details.

As discussed previously the increase in 100 year ARI peak flows resulting from the development will be reduced
to existing peak flows by the proposed detention basins. Refer to Section 5.0 for further details.

Therefore the extent of flooding will not worsen as a result of the development. Furthermore, detailed design of
roads and embankments at the downstream extents of the site will be undertaken at Operational-Works stage.
Details of flood extents for the future design can be provided if required at this stage.




B07056.W-01A.doc                                                                                         Page 8

Page 12

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



5.0        DETENTION BASIN MODELLING
As identified in Section 3.0, measures are required to mitigate the increase in peak flows resulting from the
development.

The measures to mitigate the increase in runoff from North and South developed catchments is to enlarge the
two existing dams to provide adequate detention volume. Outlet structures will also be installed to control the
discharge from each basin.

This section discusses the concept designs of the two detention basins proposed, the modelling methodology
and results confirming their effectiveness to mitigate the increase in peak flows.

5.1                Concept Detention Basin Design
The concept design of the two detention basins has been based on the following:
      •   Mitigate the increase in peak flows resulting from the development;
      •   To incorporate the existing northern and southern farm dams located on the site.
      •   Allow for access by maintenance vehicles,
      •   Provide significant visual amenity.

Also incorporated into each basin are Water Quality Control Ponds (WQCP’s) that will form part of the water
quality treatment train for the site. While runoff from each catchment discharges to the detention basins only low
flows (up to 3 month ARI) will be treated by the WQCP’s. Refer to Section 6.0 for information on WQCP’s.

In the event of storm flows (2 to 100 year ARI events) the detention volume, outlet structures and overflow weirs
will reduce flows leaving each basin to below existing levels. Flow leaving the basins will discharge offsite to the
downstream drainage system.

After calculating preliminary detention basin volumes each basin was designed accommodating the above
constraints. The minimum level of detention storage was based on the top of the storage required for the
WCQP’s. Effectively this means that storage for stormwater quality treatment is not included in the detention
basin volumes.

Different outlet configurations were tested until configurations were achieved that mitigated developed catchment
peak discharges to existing levels. The developed site hydrological model set up using the DRAINS software
package and described in Section 3.0 was modified to include the Stage-Discharge relationship (Mitigated
Scenario).

Details of the proposed Stormwater Detention Basins are presented in Table 5.1.




B07056.W-01A.doc                                                                                             Page 9

Page 13

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                                 Table 5.1: Stormwater Detention Basin Concept Details
      Basin Details                                        Northern Basin                     Southern Basin
      Detention Storage1                                       1940m3                             1640m3
      Min. Detention Level                                   RL 99.60m                          RL 101.50m
      Embankment Level                                       RL 101.00m                          103.00m
      Detention Area1                                          2200m2                             1980m2
      Low Level Outlet & Invert Level2                5 x 375mm – RL 99.60m              5 x 375mm – RL 101.50m
      Outlet Pit Size & Invert Level2                2.4m x 0.9m – RL 100.25m           2.4m x 0.9m – RL 102.40m
                                                       1 x 50mm – RL 99.20m               1 x 50mm – RL 101.00m
      Multiple Pipe Outlet Dia
                                                      1 x 750mm – RL 99.15m              1 x 450mm – RL 101.20m
      & Invert Levels2
                                                      1 x 825mm – RL 99.15m              2 x 525mm – RL 101.20m
      Overflow Weir Width                                        4m                                3.75m
      Overflow Weir Level                                    RL 100.70m                         RL 102.5m
                         1 - Details based on Overflow Weir Level.
                         2 – Refer to Outlet Structure details on Drawing No. B07056-SK08 in Appendix A.
                         Note: Concept details subject to final design.

5.2                Mitigated Scenario Results
The mitigated scenario model was created by entering the storage characteristics and stage discharge
relationships of each detention basin into the developed scenario model. All ARI storms and durations
previously listed were modelled. Results for the mitigated scenario and comparison to the existing site peak
discharge rates are detailed in Table 5.2.
                  Table 5.2: Comparison of Existing and Mitigated Scenario Peak Discharge Results
                                       Northern Basin                                Southern Basin
 ARI Storm Event                                         Change in                                         Change in
                          Existing       Mitigated                       Existing       Mitigated
                                                         Peak Flow                                         Peak Flow
        2 Year              1.12            0.94           -0.18           0.95            0.95                0
        5 Year              1.56            1.47           -0.09           1.32            1.16              -0.16
       10 Year              1.82            1.76           -0.06           1.54            1.28              -0.26
       20 Year              2.16            2.13           -0.03           1.83            1.68              -0.15
       50 Year              2.62            2.43           -0.19           2.22            2.13              -0.09
       100 Year             2.91            2.69           -0.22           2.46            2.46                0


Results indicate that both basins are effective in reducing the increase in peak discharges from the development
back to existing flows. Maximum Water Surface Levels (WSL) in the Northern and Southern detention basins
during the peak 100 year ARI storm are 100.72m and 102.71m respectfully. This indicates that a minimum
freeboard of 300mm to the top of each basin’s embankment can be achieved.

For the Southern Basin, discharge across the overflow weir is limited to a depth of 210mm. The velocity depth
product (V.D) of the flow over the weir is 0.16m2/s. Both depth and V.D are in accordance with QUDM. While no
discharge across the Northern Basin overflow weir occurs for the 100 year ARI storm, a weir is provided to
control overflow should such an event occur. Please note the sag in the accessway is flatter and wider than the
weir. Therefore, the V.D product will be lower than QUDM requirements.




B07056.W-01A.doc                                                                                               Page 10

Page 14

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



6.0           STORMWATER QUALITY
The introduction of impervious surfaces to the site has the potential to increase the export of pollutants in runoff
and cause adverse impacts to downstream waterways if not managed appropriately. Measures therefore need
to be implemented to minimise any pollutant export from the development.

Reference has been made to Noosa Council’s Cooroy and Lake Macdonald Zone Map ZM3 (February 2006) that
shows runoff from the site flows to a tributary of Six Mile Creek. This tributary then enters Six Mile Creek that
flows to the Mary River Catchment Zone Map ZM5 (February 2006). Please note, despite the site being on the
Cooroy and Lake Macdonald Zone Map ZM3, runoff from the site does not drain to Lake Macdonald.

This section of the report identifies:
      •     key pollutants associated with the development;
      •     appropriate water quality objectives (WQO’s); and
      •     stormwater quality improvement devices (SQID’s) to achieve the WQO’s.

Computer modelling of the adopted SQID’s and presentation of the results are also provided in this section.

6.1                   Pollutants of Concern / Water Quality Objectives
6.1.1                 Regional Water Quality Guidelines

The site appears to have been cleared of most vegetation some time ago and used for agricultural purposes.
Portions of the site have been recently used as an orchard. It is unknown if any pesticides, insecticides or
fertilisers have been applied to the site in the past. However, agricultural purposes and the possibility of
chemical application, leads to the likelihood that higher pollutant loads compared with loads from a natural state.
Due to the fact that the site is not in a natural ‘undeveloped’ condition and other reasoning below, it is considered
that concentration values listed in Queensland Water Quality Guidelines (2006) (QWQG) cannot appropriately be
applied to this development.

Reference has been made to the QWQG to determine the physico-chemical indicators applicable to the water
type of the catchment. Reference to Section 2.5.1.2 of these guidelines shows that the specific waterway for the
subject site is not specified in Table 2.5.1.2. The guidelines then refer the user to the default regional water
quality guidelines for slightly to moderately disturbed waters (Table 2.5.1.1). According to Figure 2.5.1c of the
QWQG, the site falls within the ‘lowland freshwater’ water type. Table 2.5.1.1 outlines the guideline values for
the receiving waters. The guideline values listed in the QWQG are reproduced in Table 6.1 below.

                       Table 6.1: South-East Queensland Regional Water Quality Guideline Values*

          Pollutant Total Suspended Solids (mg/L)         Total Phosphorous (mg/L)       Total Nitrogen (mg/L)

          Objective                  6                                0.050                       0.500
                                            *Concentrations given are median values.

In-situ ambient water quality concentrations (such as those presented in Table 6.1) conventionally relate to the
long term water quality in the receiving water, such as the Mary River which is the main downstream water body.
Concentrations of discharges from the site however, are highly variable, depending on the response of the
catchments to rainfall. Healthy Waterways (2006) argues that selection of pollutant concentrations for
stormwater discharges is therefore problematic. Engineers Australia (2006) states that ambient water quality


B07056.W-01A.doc                                                                                            Page 11

Page 15

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

trigger levels ‘do not directly provide water quality targets for stormwater discharge or for the selection, sizing
and design of catchment management measures.’

Site specific discharges, therefore, have brief impacts on the quality of water within the river. It is considered
more appropriate to assess impacts by considering pollutant loads, given that the total load, rather than the
concentration, affects the long term water quality in the river. Furthermore, the contribution of the development
to the river inflows is small, because the development comprises only a small part of the river’s wider catchment.
The Mary River’s wider catchment consists of a large proportion of open space and natural bushland, which
contributes low contaminant loads relative to an impervious development site. Therefore, concentrations from
the total catchment are more representative of guideline values for receiving waters.

Healthy Waterways (2006) says that the substantial increase in runoff volume that accompanies urban
development can increase pollutant loads to receiving waters, even if concentrations are not increased.

ANZECC (2000) states that water bodies over large continuous tracts of land are highly disturbed and adjacent
water bodies are not necessarily of better quality than the water body of interest. The water body over a large
tract of land, is in this case the Mary River, while the water body of interest would be Six Mile Creek. Figure
3.1.3 in ANZECC (2000) shows that a water body includes lowland rivers and streams, which are applicable to
this site. In regards to pollutant loads, ANZECC (2000) says that excessive growth of aquatic plants occurs
when there are high concentrations and loads of nutrients. However, biomass is more controlled by the total
mass of nutrients available to growing algae.

It is therefore concluded that load reduction targets are considered as a more appropriate water quality objective.

This report, however, will demonstrate that concentrations have been considered to an acceptable extent.

The following load reduction targets which satisfy water quality objectives (WQOs) of the Healthy Waterways
(2006) Water Sensitive Urban Design – Technical Design Guidelines for South East Queensland (2006) are
listed in Table 6.2. The load reduction targets of Healthy Waterways (2006) have been adopted for the purposes
of this Stormwater Quality Management Strategy. Healthy Waterways (2006) are the regionally adopted
guidelines for load reduction targets. The design objectives are reductions in mean annual loads leaving
developed areas, compared to traditional urban design where stormwater is not treated (Healthy Waterways,
2006).

                                       Table 6.2: Load Reduction Targets*

                                    Pollutant                  Load Reduction Target (%)

                         Total Suspended Solids                             80

                         Total Phosphorous                                  60

                         Total Nitrogen                                     45

                         Gross Pollutants                                   90
                                            * Healthy Waterways (2006).




B07056.W-01A.doc                                                                                           Page 12

Page 16

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village


6.2                Stormwater Quality Management Strategy
A treatment train of suitable Stormwater Quality Improvement Devices (SQIDs) has been proposed to mitigate
the increase of stormwater pollution loads. The locations and distribution of these devices are shown on
Drawing No.’s B07056-SK04 and SK05 in Appendix A.

The treatment devices proposed for this development have been modelled for Total Suspended Solids (TSS),
Total Phosphorous (TP), Total Nitrogen (TN) and Gross Pollutants. The treatment devices however, are not
limited to the removal of these pollutants and are expected to mitigate the other pollutants. For example, if TSS
is adequately controlled the associated heavy metals are also controlled.

The treatment train will incorporate the following devices:

(a)      Bio-Filtration Basins

Bio-filtration basins will treat stormwater runoff from external sub-catchments.

One basin will be located within the site just downstream of the northern discharge point off Cooroy Connection
Road.

The other bio-filtration system incorporates two basins and will be within the site just downstream of the southern
Cooroy Connection Road discharge point. These basins will be located in series between proposed ILU’s. Refer
to Drawing B07056-SK04 and SK05 for locations of these basins.

Stormwater discharge from the two low points on Cooroy Connection Road will be directed to the basins by
swales. These basins will treat runoff from the external sub-catchment including part of the railway corridor and
Cooroy Connection Road. Treatment of an external catchment is proposed to improve the runoff entering the
site to assist with the on-site stormwater quality treatment devices. Bio-filtration devices act to remove fine
sediment and reduce nutrient concentrations.
(b)      Water Quality Control Ponds (WQCP’s)

Two WQCP’s are proposed for the site. These WQCP’s are located as part of the proposed stormwater
detention basins at the downstream ends of the northern and southern gullies. The water bodies / ponds will
have enhanced nutrient removal by incorporating macrophyte planting areas and open water zones. They will
ensure that adequate pollutant retention is achieved before discharging offsite to adjacent properties. Low flows
that do not overtop the low level outlet structure of the detention basin will be detained temporarily in the
WQCP’s. Each WQCP will also have a permanent water storage volume. Higher volumes of greater capacity
than the temporary storage volume of each pond will enter the low level outlet structure pit of the basin.
(c)      Bio-Filtration Pods

Bio-filtration pods are proposed in two locations to treat runoff from car park surfaces. Bio-filtration devices act to
remove fine sediment and reduce nutrient concentrations.
(d)      Enviropods

Fine mesh basket for installation in gully pits such as the ‘Enviropod’ product by Stormwater360 (formerly Ingal
Environmental). These are proposed to be installed in various internal road surface inlet pits. Details of these
devices are presented in Appendix F.
(e)      Rainwater Tanks

Upon reference to Noosa Council’s Schedule 8 Map, it is found the site falls within the designated rainwater tank
area. Three underground rainwater tanks are proposed to collect roof water runoff from ILU’s and apartment
B07056.W-01A.doc                                                                                              Page 13

Page 17

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

buildings. Therefore, separate drainage systems will be required such that rainwater runoff from these buildings
is separated from street drainage stormwater runoff. The tanks are designated as ‘Northern Rainwater Tank’,
‘Central Rainwater Tank’ and ‘Southern Rainwater Tank’. Rainwater collected in each tank will be pumped back
in a separate reticulation line to the same buildings that drain to the tank. Water will be used by toilets, laundries
and for external use. A fourth rainwater tank is proposed for the Residential Aged Care building. These tanks
will reduce runoff volumes by reuse. Reuse will also assist in meeting water quality objectives by reducing
contaminant loads entering the stormwater system.

(f)      Gross Pollutant Traps (GPTs)

Installed immediately upstream of WQCP’s to provide pre-treatment of stormwater discharges. The GPTs will
capture litter, coarse sediment and hydrocarbons, while significantly reducing the amount of fine sediments
entering the WQCP’s and leaving the site.

6.3                MUSIC Modelling
Water quality modelling of the proposed development has been undertaken using the Model for Urban
Stormwater Improvement Conceptualisation (MUSIC) Version 3.01, developed by the Cooperative Research
Centre for Catchment Hydrology (CRCCH). MUSIC enables the user to model the transfer of pollutants through
a catchment and provides an aid in determining how effective the stormwater quality treatment train is at meeting
WQOs. The critical pollutants to be modelled are Total Suspended Solids (TSS), Total Phosphorous (TP), Total
Nitrogen (TN) and Gross Pollutants.

The following models were set up to examine the effectiveness of the water quality treatment train:
          Developed Site Only (without mitigation measures applied)
          Model name: B07056 Developed Site Only Unmitigated.sqz

          Developed Site plus an External Catchment (without mitigation measures applied)
          Model name: B07056 Developed Total Unmitigated.sqz
          Developed Site plus an External Catchment (with mitigation measures applied)
          (B07056 Developed Total Unmitigated.sqz with mitigation measures applied)
          Model name: B07056 Developed Total Mitigated.sqz


As there are no specific guidelines issued by Noosa Council for MUSIC modelling, Brisbane City Council’s
Guidelines for Pollutant Export Modelling in Brisbane Version 7 – Draft Revision 2 (October 2003) have been
used to configure each model. These are the current widely accepted guidelines for MUSIC modelling. The
following sections summarise the parameters and procedures adopted from these guidelines.

6.3.1              Meteorological Data

Six minute pluviographic data was sourced from the Bureau of Meteorology (BOM) for the Cooroy Composite
Station No. 040059, approximately 1.5 km to the south of the site. Cooroy Composite Station was chosen as it
was the closest station with rainfall data available in a suitable format for MUSIC modelling (continuous rainfall
data). The 11 year period from 1st January 1972 to 31st December 1982 has been adopted for the rainfall
duration. This period was selected due to its mean annual rainfall of 1613 mm, compared with that of Cooroy
(1602 mm). In addition, series of zero recorded data were limited within the dataset.

Monthly areal potential evapo-transpiration (PET) data was sourced from BOM for the Mary River Basin and
applied to the model (Bureau of Meteorology, 2001).

B07056.W-01A.doc                                                                                             Page 14

Page 18

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

6.3.2              Source Nodes

Source node land-use characteristics must be defined for MUSIC modelling purposes. The site under the
developed scenario was categorised into land-use types according to source node types in the MUSIC program.
Developed scenario sub-catchments were further apportioned into roofed and non-roofed nodes in order to
model rainwater tanks. The impervious percentage for all roofed areas was assumed to be 100%. The Gold
Coast City Council MUSIC Modelling Guidelines (2006) were referenced to configure the pollutant concentration
properties of roof areas. For non-roofed areas, percentage impervious values were determined based on
proposed road and other hard surface areas. The effective impervious factor was applied to each impervious
percentage value for the non-roofed area of each sub-catchment in accordance with Table 2.2 of Brisbane City
Council’s Pollutant Export Modelling Guidelines.

Stochastic generation estimation and serial autocorrelation set to zero has also been adopted.

The developed site sub-catchment areas and percentage impervious values are presented in Table 6.3.

    Table 6.3: Developed and Mitigated Scenarios Sub-Catchment Areas and Percentage Impervious Values
                Sub-Catchment                 Area (ha)        % Effective Imp.               Land Use
        North ILU Roofs                        0.701                 100                  *Urban Residential
        Apt 1 Roof                             0.150                 100                  *Urban Residential
        RAC Roof                               0.378                 100                  *Urban Residential
        North Catch                            1.005                  10                  Urban Residential
        North Bio Basin Catch                  1.527                  6                   Urban Residential
        North Bio Pod 1 Catch                  0.122                  20                  Urban Residential
        North Bio Pod 2 Catch                  0.168                  20                  Urban Residential
        Remainder of North Catch               2.931                  2                   Urban Residential
        Central ILU Roofs                      0.244                 100                  *Urban Residential
        South ILU Roofs                        1.303                 100                  *Urban Residential
        Apt 2 Roof                             0.140                 100                  *Urban Residential
        Village Ctr Roof                       0.082                 100                  *Urban Residential
        South Catch                            3.454                  8                   Urban Residential
        South Bio Basin Catch                  0.935                  8                   Urban Residential
        Remainder of South Catch               0.424                  1                   Urban Residential
        Entrance Rd Bypass                     0.089                 15                   Urban Residential
        TOTAL                                  13.65
                          *Denotes roof nodes with pollutant parameters applied as per GCCC (2006).

6.3.3              Drainage Links

No routing has been adopted for all drainage links within each model.

6.3.4              Treatment Nodes

Bio-filtration Basins, Bio-filtration Pods, Rainwater Tanks, Wetlands and Ponds were modelled in MUSIC. The
Bio-filtration Basin and Bio-filtration Pod treatment nodes have the following properties presented in Table 6.4.




B07056.W-01A.doc                                                                                           Page 15

Page 19

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                   Table 6.4: General Properties of Bio-filtration Basin and Pod treatment nodes
                                                                  Treatment Node
                               Property
                                                   Bio-Filtration Basins    Bio-Filtration Pods
                         Filtration Depth (m)                0.6                     0.6
                         Ponding Depth (m)                   0.4                    0.25
                              Filter Media                  Sand                    Sand
                        Filter Median Particle
                                                             0.7                        0.7
                            Diameter (mm)
                         Saturated Hydraulic
                                                            360                         360
                        Conductivity (mm/hr)
                            Seepage Loss
                                                             0                           0
                                (mm/hr)


Default k and C* values have been adopted for each Basin and Pod node.

The Wetland and Pond treatment nodes have the following properties presented in Table 6.5.

                              Table 6.5: Properties of Wetland and Pond treatment nodes
                                                                   Treatment Node
                   Property
                                           North Wetland             South Wetland             South Pond
               Surface Areas
                                                 1202                     991                       216
                    (m2)
            Extended Detention
                                                 0.4                      0.2                       0.5
                 Depth (m)
              Permanent Pool
                                                 1072                     630                       150
                Volume (m3)
               Seepage Loss
                                                  0                        0                         0
                  (mm/hr)
            Evaporative Loss as
                                                 125                      125                       100
                 % of PET
             Notional Detention
                                                 25.2                    21.1                       20.2
                 Time (hrs)


The general properties of the rainwater tanks as modelled in the mitigated scenarios are presented in Table 6.6.
                               Table 6.6: Properties of Rainwater Tank treatment nodes
                                                        *Daily Demand
           Tank                  Capacity                                               Re-use Connections
                                                           of Re-use
 North Rainwater Tank             250 kL                  46.0 kL/day          Toilets, Laundry, External and Irrigation
 Central Rainwater Tank            39 kL                   3.0 kL/day          Toilets, Laundry, External
 South Rainwater Tank             350 kL                  43.0 kL/day          Toilets, Laundry, External and Irrigation
 RAC Rainwater Tank                50 kL                   7.6 kL/day          Toilets, Laundry
                                       *Daily Demand sourced from Water Balance Model




B07056.W-01A.doc                                                                                             Page 16

Page 20

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

6.4                MUSIC Modelling Results
Computer modelling using MUSIC was undertaken for the existing and developed scenarios as described in
Section 6.3. The results of the various scenarios are compared in this section to show the effects of the
proposed water quality treatment train on pollutant loads and concentrations.

Results from modelling of the various scenarios are presented in Table 6.7 below. Load retention targets were
derived from the percentage reduction required from the developed site only (without mitigation). These have
then been compared with the load retention achieved from the total catchment (i.e. including some external
catchment areas).
                              Table 6.7: Load Reduction Results for Various Scenarios

                                                     TSS                TP              TN           Gross
 Description                                                                                        Pollutants
                                                    (kg/yr)           (kg/yr)         (kg/yr)        (kg/yr)
 Existing Site (Agricultural Node)                    9190             25.7             180              0

 Developed Site Only (Without Mitigation)             8280             21.8             174             1410

 WQOs (Percentage Reduction)                          80%              60%              45%             90%
 Load Retention Target                               6624              13.1            78.3            1269
 Developed Site plus External Catchment
                                                     12500             30.6             221             1490
 (Without Mitigation)

 Developed Site plus External Catchment
                                                      4160             16.1             143             0.1
 (With Mitigation)
 Load Retention Achieved                             8340              14.5             78             1490
 Load Retention Achieved as % of
                                                     101%              67%             45%             106%
 Developed Site Load
 Objective Achieved?                                  Yes              Yes              Yes            Yes
These results show the load retention achieved for the site and external catchments exceed that which is
required for the site only catchment. Proposed mitigation measures are therefore effective in reducing pollutant
loads to meet WQOs. It is also noted that the developed site plus an external catchment (with mitigation)
produces lower pollutant loads than the existing site.

The median concentration results from the developed site plus an external catchment are presented in Table 6.8
as required by Noosa Council. Results from the MUSIC model show that WQO’s as per Table 6.1 are not met
for the pollutants analysed.




B07056.W-01A.doc                                                                                        Page 17

Page 21

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                          Table 6.8: Concentration Results for Various Scenarios*

                                                               Pollutant Concentration
 Scenario
                                       Total Suspended Solids           Total Phosphorous            Total Nitrogen
                                               (mg/L)                          (mg/L)                    (mg/L)
 Existing Site
                                                25.4                            0.133                      1.2
 (Agricultural Node)
 Developed Site
 (No mitigation measures)                       16.2                            0.153                      1.80
 plus an External Catchment
 Developed Site
 (With mitigation measures)                     8.62                            0.073                      1.15
 plus External Catchment
 WQOs                                             6                             0.050                     0.500
                *Concentrations given are median values and are flow based sub-sample results for flows > 1 L/s

As the site was recently an orchard with fruit trees, a MUSIC model has been run for the site with an Agricultural
source node to represent the site. Table 6.8 also shows that the existing site concentrations are significantly
higher for TSS and TP than from the mitigated developed site. Therefore, it is argued that the proposed
treatment train of SQIDs is effectively treating developed scenario runoff to better quality than runoff from the
existing scenario.

As can be seen in Table 6.8, the proposed SQIDs are effective in reducing concentrations from the developed
scenario with an external catchment by approximately one half for TSS and TP and by approximately one third
for TN. As there is a reduction of concentrations from existing conditions, that the point site discharges are not
downstream ambient water quality levels and the high variability of concentrations off a small catchment, the
concentration outcomes are considered to be within an acceptable level. Net load reduction achieved is high
and concentration levels are low.

It should also be noted that MUSIC has various limitations when modelling concentrations. The default k and C*
variables adopted within MUSIC treatment nodes effectively limit the level of treatment achievable, especially for
TN. These default variables will produce relatively high outflow concentrations irrespective of inflow
concentrations irrespective of inflow concentrations or size of treatment device.

Treatment of stormwater runoff from external site areas of the railway corridor and Cooroy Connection Road
adjacent to the site is not required by Council. Not treating these external areas would be difficult in practice as
they drain through the site and could not practically be diverted around treatment measures. The opportunity to
treat stormwater runoff from these areas has been taken and will benefit the water quality of downstream
systems. Significant achievements have been demonstrated for improvements to water quality runoff.




B07056.W-01A.doc                                                                                                  Page 18

Page 22

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



7.0        WATER BALANCE MODELLING
Noosa Council’s Planning Scheme Policy requires the development to demonstrate no increase in average
annual runoff volumes from the site. In order to demonstrate this, a water balance simulation was undertaken for
the:
      •   Existing Scenario – the site in its predevelopment state;
      •   Developed Scenario – the site developed without the proposed management strategies; and
      •   Mitigated Scenario – the site developed with the proposed management strategies included.

The aim is to show that management strategies proposed will significantly reduce the increase in runoff volume
resulting from the development to existing or near existing volumes.

7.1                Proposed Measures
The following strategies will be employed to reduce potable water demand from the development:
      •   Efficient Water Use – to maintain a constant supply of water from a limited source, efficient water usage
          and design principles will be incorporated throughout the development. This will include at minimum
          AAA rated water saving devices (such as dual flush toilets, low-flow showers and faucets, front loading
          washing machines and efficient dishwashers) and pressure management. Landscaping incorporating
          water efficient vegetation will also be incorporated throughout the development.
      •   Rainwater Capture and Reuse – Four underground rainwater tanks with a total capacity of 700kL are
          proposed. Captured rainwater from the underground tanks will be used to supply water for toilets,
          laundry and external purposes for all ILU’s. The two Apartment buildings and the Residential Aged
          Care (RAC) building will reuse rainwater for toilets and laundry. Landscaping will also be irrigated by
          captured rainwater.

7.2                Water Balance Methodology
7.2.1              Rainfall Data

Daily rainfall data necessary to undertake the rainwater tank analysis was taken from the Rainman Professional
Edition Version 4.3, published by the QLD Government Department of Primary Industries (June 2003). Rainfall
data was analysed from the Cooroy Composite Station 1.5 km south of the site.

The relevant mean yearly rainfall for the 108 year period of available data for the Cooroy station was found to be
1602 mm. The yearly rainfall data was then analysed to determine which consecutive 30 year average was
closest to the average of the entire data set. This was determined to be from 1928 to 1957. Within this period,
10 and 90 percentile rainfall years occur as for the total 30 and 100 year periods.

Table 7.1 compares the 100 year period and the 30 year period relevant parameters.
                                    Table 7.1: Comparison of 100 & 30 Year Periods
                    Parameters Compared          100 year period (mm)         30 year period (mm)
                           Mean                          1602                         1576
                           10%ile               1184 (1187mm for 1940)       1247 (1254mm for 1951)
                           90%ile               2184 (2183mm for 1950)       2262 (2260mm for 1956)




B07056.W-01A.doc                                                                                           Page 19

Page 23

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

7.2.2              Roof Details

All buildings within the site contribute to a total roof area of 2.91ha. For the water balance analysis it was
assumed that:
      •   100% of total roof area contributing to capture. A separate piped drainage system is proposed to drain
          roof runoff from ILU’s and Apartment buildings for collection in underground tanks. The RAC building
          also has an underground tank at its eastern end (low side) so it is also assumed that 100% of the roof
          area can drain to the tank.
      •   Coefficient of Runoff value of 0.9 was used as per HB 230 – 2006: Rainwater Tank Design and
          Installation Handbook.

7.2.3              Usage

Variables assumed for water usage have been adopted from Maroochy Shire Council’s Integrated Water
Management Guidelines (2006). While current estimates of water consumption indicates a usage of
300L/person/day, the target of 240L/person/day represents MSC’s Planning Scheme Policy. On the basis that
efficient water use is proposed within this development, the reduced usage rate has been adopted. For the
Residential Aged Care building, usage was assumed to be lower at 180L/person/day.

Occupancy of 1.5 persons/dwelling has been adopted for the ILU’s and Apartment buildings according to The
Noosa Plan for Retirement or Special Needs Housing giving a total daily use of 360 L. For the Residential Aged
Care building, an occupancy of 120 persons was adopted based on the number of beds proposed. As per the
Maroochy guidelines, the proportions and breakdown of rainwater use per dwelling is indicated in Table 7.2.

                                       Table 7.2: Breakdown of Total Water Usage
                   Use                      Proportion of Total Use    Rainwater Tank Use (L/day)
                   External                          30%                          108
                   Toilets                           20%                           72
                   Laundry                           15%                           54
                   Hot water                         20%                      Not applied
                   Kitchen / Bathroom                15%                      Not applied
                   Total                       100% ( = 360 L)                    234


An irrigation rate of 25mm/m2/week has been assumed landscaping areas around the apartment, residential
Aged Care and Village Centre Community Buildings. A total of area of 1.56ha is proposed for irrigation.

7.3                Water Balance Results
7.3.1              Existing & Developed Scenarios

To calculate the runoff generated by the site for the existing and developed scenarios, Average Volumetric
Runoff Coefficients (AVRC’s) were used in combination with the site 30 year daily rainfall data. AVRC’s of 0.30
and 0.49 were used for the existing and developed scenarios respectively. The resultant Average Annual Runoff
Volumes (AARV’s) for the two scenarios are presented below in Table 7.3.




B07056.W-01A.doc                                                                                        Page 20

Page 24

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

          Table 7.3: Average Annual Runoff Volume Comparison for Existing and Developed Scenarios
                                  Scenario              AVRC               AARV (ML/year)
                                    Existing             0.30                  45.0
                                  Developed              0.49                  73.5
                                   Increase                -                   28.5
                   Note: AVRC adopted based on Table 4.11.1 of PRSC Subdivision Development Guidelines.

The above results indicate that runoff from the site will be increased by 63% as a result of the development.

7.3.2              Mitigated Scenario

To determine the reduction in the volume of runoff by the proposed measures, four separate water balance
models for each of the underground rainwater tanks were undertaken to determine the amount of water that
could be captured and reused from roof areas.

The results of the analysis are presented below in Table 7.4, with detailed results presented in Appendix E.
                                        Table 7.4: Water Balance Model Results
                 Tank                               Size (kL)         Reduction in Runoff (ML/year)
                 Northern                              250                         6.88
                 Central                                39                         0.90
                 Residential Aged Care                 50                         1.68
                 Southern                              350                         9.22
                 Total Reduction                         -                        18.68


The above results indicate that a reduction in runoff volume of 18.68 ML can be achieved by adopting the tank
sizes and management scheme proposed. Therefore, the proposed annual runoff is 54.8 ML. While the
proposed management scheme does not reduce the increase in flows to below existing volumes, it should be
noted that:
    •    The increase in runoff volume has been significantly mitigated;
    •    Equivalent Person (EP) occupancy rates for ILU’s and Apartments as required by The Noosa Plan for
         Retirement or Special Needs Housing are low at 1.5 (as modelled). This has an impact on water
         balance models through lower demand and hence lower rainwater use for toilets and laundries.
         Therefore, normal residential EP rates of around 2.5 would reduce the developed annual runoff further;
    •    Overflow from the underground rainwater tanks will flow into the two WQCP’s. This overflow is required
         to maintain water levels in the ponds for submerged plant species and continuous turnover of the water
         bodies for stormwater quality treatment; and
    •    Reduction of runoff volumes via evaporation within the WQCP’s has not been accounted for in the
         analysis.

On this basis the proposed measures to reduce runoff volume from the development is considered to be
appropriate.




B07056.W-01A.doc                                                                                          Page 21

Page 25

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



8.0        WATER SENSITIVE DESIGN CODE RESPONSE
This section presents a response to ‘Division 20 – Water Sensitive Design Code’ of Noosa Council’s ‘The Noosa
Plan’ to demonstrate that the specific outcomes have been met by the proposed development. Specific
Outcomes as set by Noosa Council have been sourced from Section 14.176, Table 14-58 of ‘The Noosa Plan’.
Code                                Probable Solutions                    Response
                                    (if code assessable)
Water Reuse                         S1.1 No solution provided             The development proposes retention
O1 Development uses a                                                     storage in the form of rainwater tanks
combination of detention and                                              for collection of roof water runoff from
retention systems to capture                                              buildings. Detention storage is
run-off from areas on the site;                                           proposed for mitigation of developed
AND                                                                       peak flows in the enlarged northern and
                                                                          southern dams according to relevant
                                                                          design standards.
                                                                          COMPLIANCE ACHIEVED
O2 Water storage devices must       S2.1 No solution provided             All modelling and design has
have sufficient capacity having                                           considered local rainfall patterns and
regard to local rainfall pattern                                          increase of impervious surfaces.
and the catchment area of roof                                            COMPLIANCE ACHIEVED
or other hard standing surface;
AND

O3 Captured water is utilised for   S3.1 Captured water is plumbed        Captured rainfall runoff is proposed for
all non-potable uses on site        to be available for all external      non-potable reuse where considered
AND                                 uses including gardening,             appropriate. ILU’s will reuse rainwater
                                    irrigation, ponds, filling swimming   for toilet flushing, laundry and external
                                    pools and outdoor cleaning, as        demands. Apartment buildings and the
                                    well as all ground floor toilet       Residential Aged Care building will
                                    cisterns and washing                  reuse rainwater for toilets and laundry.
                                    machine cold taps; and                The captured rainwater in some
                                    S3.2 Where the captured water is      underground tanks is proposed for
                                    used for toilet flushing and/or       irrigation of landscaped areas. A tap
                                    laundry use an automatic or           can be provided for swimming pool top
                                    manual interchange device that        up at Community Centre.
                                    allows alternate use of captured
                                    water or the reticulated water        Automatic or manual interchange
                                    supply is installed to ensure that    devices will be installed to ensure there
                                    there is a continual supply of        is a continual supply of water for
                                    water for sanitary flushing and       sanitary flushing and laundry use.
                                    laundry use.                          COMPLIANCE ACHIEVED
O4 On-site detention does not       S4.1 No solution provided             Detention basin storages have been
adversely impact on water                                                 designed to mitigate peak flows to
requirements downstream of                                                existing conditions. Retention devices
the site where the water is                                               have been designed to ensure annual
required to sustain the ecology                                           runoff is not significantly impacted. An
and hydrology of downstream                                               increase of runoff does occur, however
systems (environmental flows);                                            this is considered to be within
AND                                                                       acceptable limits and natural yearly
                                                                          variability. Therefore, this development
                                                                          has no adverse impacts on
                                                                          downstream sites.
                                                                          COMPLIANCE ACHIEVED




B07056.W-01A.doc                                                                                            Page 22

Page 26

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

O5 Within the Shire Business        S5.1 No solution provided           Not applicable as subject site is not
Centre site, as shown on Map                                            within the Shire Business Centre site.
SBC, on-site detention
measures are contained within
the developed areas of the site,
clear of drainage lines and
Open Space Precincts.
Run-off treatment                   No solution provided                A treatment train of Stormwater Quality
O6 Run-off that leaves the site                                         Improvement Devices (SQIDs) is
is treated so as not to adversely                                       proposed to treat runoff from both the
impact on the ecology and                                               subject site and external site areas to
hydrology of downstream                                                 reduce the pollutant loads draining to
environmental flows;                                                    downstream areas. Developed
AND                                                                     pollutant loads from the total catchment
                                                                        are reduced to meet targets of the
                                                                        Healthy Waterways (2006).
                                                                        COMPLIANCE ACHIEVED
O7 Within the Shire Business        No solution provided                Not applicable as subject site is not
Centre site, as shown on Map                                            within the Shire Business Centre site.
SBC—
a) run-off treatment occurs
within the site ; and
b) drainage lines are only used
for final polishing of run-off.
Town water supply                   S8.1 A suitable backflow            Backflow prevention devices or similar
connections                         prevention device is installed to   will be installed on water reuse facilities
O8 Backflow devices or similar      protect the potable water within    to ensure that mixing with town mains
systems ensure water reuse          the reticulated water supply in     water does not occur.
facilities have no impact on the    accordance with AS/NZS              COMPLIANCE ACHIEVED
quality of the town mains water.    3500:2003 Plumbing and
                                    Drainage.

Use of natural treatments and       No solution provided                Natural treatment strategies for water
systems                                                                 quality controls including bio-filtration
O9 Natural treatment strategies,                                        basins and pods, wetlands and ponds
including grass swales and bio-                                         are proposed for the development.
retention systems, vegetated                                            These basins and wetlands will provide
filtration strips and gross                                             visually appealing solutions to water
pollutant traps, are used                                               quality management in the retirement
wherever practicable;                                                   village development. Gross pollutant
                                                                        traps are also proposed. Due to the
AND
                                                                        nature of the development (Retirement
                                                                        Village with an aged demographic),
                                                                        grassed roadside swales are not
                                                                        considered appropriate.
                                                                        COMPLIANCE ACHIEVED
O10 Within the Shire Business       No solution provided                Not applicable as subject site is not
Centre, as shown on Map                                                 within the Shire Business Centre site.
SBC— where necessary,
drainage lines are ecologically
enhanced to ensure that the
water quality polishing functions
are of high standard.




B07056.W-01A.doc                                                                                            Page 23

Page 27

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



9.0       CONCLUSIONS AND RECOMMENDATIONS
This report has been prepared generally in accordance with Noosa Council’s ‘The Noosa Plan’ Planning Scheme
Policy. Information has been provided on the existing and developed scenario hydrological aspects, detention
basin measures, a stormwater quality management strategy and a water balance analysis.

Detention basins were modelled using DRAINS software. It has been demonstrated that the proposed detention
basins and outlet structures at both the northern and southern discharge points mitigate developed peak flows to
below existing rates for all analysed average recurrence interval storms.

The treatment train was modelled using the software program MUSIC and has been demonstrated to achieve
pollutant load reductions from treatment of both the developed site and external site catchments. Load
reductions have been compared to water quality objectives as required by Healthy Waterways (2006). Load
based objectives are considered more appropriate than concentration objectives as discussed in the report.

The developed scenario water balance model (with rainwater reuse measures) significantly reduces average
annual runoff volumes from the proposed development.

It is recommended that the Concept Stormwater Management Plan be approved and incorporated into the
Operational Works design. Detailed construction drawings for proposed water quality treatment devices will be
submitted with the Operational Works application.




B07056.W-01A.doc                                                                                        Page 24

Page 28

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



10.0 REFERENCES
ANZECC (2000), Australian and New Zealand Guidelines for Fresh and Marine Water Quality. Australian and
New Zealand Environment and Conservation Council. Agriculture and Resource Management Council of
Australia and New Zealand.

Brisbane City Council (2003), Guidelines for Pollutant Export Modelling in Brisbane Version 7 – Draft Revision 2.

Bureau of Meteorology (2001), Climatic Atlas of Australia (Evapotranspiration).

Engineers Australia (2006), Australian Runoff Quality. A guide to Water Sensitive Urban Design.

Environmental Protection Agency (QLD) (2006). Environmental Protection (Water) Policy 1997. Noosa River
Environmental Values and Water Quality Objectives.

Gold Coast City Council (2006). MUSIC Modelling Guidelines.

Jenkins G. A. (2004), Getting to Know MUSIC.

Healthy Waterways (2006). Water Sensitive Urban Design – Technical Design Guidelines for South East
Queensland (2006).

MUSIC Version 3.01 (2005), Model for Urban Stormwater Improvement Conceptualisation

Noosa Council (2006). The Noosa Plan. Planning Scheme Policy.

Queensland Government (2006), Queensland Water Quality Guidelines 2006. Environmental Protection Agency
(QLD).

Queensland Urban Drainage Manual (1992).




11.0 APPENDICES
Appendix A         Stormwater Management Plan Drawings

Appendix B         Hydrological Data
Appendix C         Flood Investigation Results

Appendix D         MUSIC Model Layouts, Data and Results
Appendix E         Water Balance Modelling

Appendix F         Information on Stormwater360 Environmental Products




B07056.W-01A.doc                                                                                          Page 25

Page 29

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



                                       APPENDIX A:

     STORMWATER MANAGEMENT PLAN DRAWINGS




B07056.W-01A.doc

Page 30

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



                                       APPENDIX B:

                                 HYDROLOGICAL DATA




B07056.W-01A.doc

Page 31

 

~

 

 

 

 

 

 

 

  

 

  

[sor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ __ | I a ¥ — -
CECH | iWiviNnow Novia OL AYMUSI INLD aang Hat
= ~ sa AVIL¥1d . 2 SZe°Z4l "S aZE°9Z NOIVIN
i HVYO) SaAunD ALISNALNI TIVANINY oe es SE
uaaWISNA TANAOI JMS ¥SCON .
me Sinoy NOLLYEE 0 - 2f 4 €£ :
re 5 5 g -& 5 a a ' A a ei
[p~
PP LT 3 ie 7
TDW OR A a T-
fers
S et
Tr =
Bl eh J 4 =
SY
SEES — r b
OR ES
J E
i
{I P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LI 1 WLLL esau

|

az

OE

oe
oF

OB
og

TE

O0z

OSE

on
as

 

LIE AAV UIA

ANGU/UM ALISNALNI

  

 

 

 

 

ET‘ET 2002/S0/7

“IONNOS SYIHS YSOON CIBTLDbL-19

€@/2G 3d

 

s

Page 32

                                                                                                                                                                                                                                       Appendix B




RSL CARE, COOROY                                    Site Layout Impervious Area Calculations

Job:                               RSL Care, Cooroy
File:                              H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[B07056 Area Calculations.xls]Imperv - Layout 2
Date:                                 22/10/2007
By:                                KU

Northern Catchment
Total Catchment
                                                      Footpaths                                                                                                   Allowance                                          Allowance
                                       Roads           Length            Width     Area             ILU Type           Roof/Paved Area   # of   Sub-Total         Driveway    Sub-Total    Buildings    Roof Area      Paved   External Road
                                         m2               m               m         m2                                       m2                    m2                 m2         m2                        m2            m2         m2
                                        1162             83               1.5      124.5                A                    188         16       3008                16        256          RAC          3779           189       3274
                                        1861             66               1.5        99                 B                    189          3        567                20         60       Apartment 1     1502           75
                                        353              65               1.5       97.5                C                    209         13       2717                14        182
                                        897              240              1.5       360                 D                    241          5       1205                29        145
                                        505              54               1.5        81
                                        445
                                        366
Totals                                  5589                                        762                                                           7497                          643                       5281          264         3274
Total Impervious Area                  23310
Catchment Area                         70007        <Entered into DRAINS model                                                                              Ave      20
Percentage Impervious                   33%         >Rounded up to 35% in DRAINS model

Southern Catchment
Total Catchment
                                                      Footpaths                                                                                                   Allowance                                          Allowance
                                       Roads           Length            Width     Area             ILU Type           Roof/Paved Area   # of   Sub-Total         Driveway    Sub-Total    Buildings     Roof Area     Paved   External Road
                                         m2               m               m         m2                                       m2                    m2                 m2         m2                         m2           m2          m2
                                        410              145              1.5      217.5                A                    188         28       5264                16        448       Village Centre   821           123        2865
                                        857               7               1.5       10.5                B                    189         14       2646                20        280        Apartment 2     1397           0
                                        461              180              1.5       270                 C                    209         26       5434                14        364
                                        1318             414              1.5       621                 D                    241         13       3133                29        377
                                        983              125              1.5      187.5
                                        1698
Totals                                  5727                                        1307                                                         16477                          1469                      2218          123         2865
Total Impervious Area                  30186
Catchment Area                         65755        <Entered into DRAINS model                                                                              Ave      20
Percentage Impervious                   46%         >Rounded up to 50% in DRAINS model

Entrance Road

                                       Roads
                                        m2
Totals                                      363
Total Impervious Area                       363
Catchment Area                              889 <Entered into DRAINS model
Percentage Impervious                      41% >Rounded up to 45% in DRAINS model




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\B07056 Area Calculations.xls

Page 33

                                                                                                                                                                                                                                                             Appendix B



             Time of Concentration and Rational Method Calculations
             Job:    RSL Care, Cooroy
             File:   H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\[B07056 070802 Rational Method Calculations.xls]North
             Date:   2/08/2007
             By:     KU

             TIME OF CONCENTRATION CALCULATIONS                                                EXISTING NORTHERN CATCHMENT
                                                                                                                                                                        Wetted
                                                                                                           Length          Av. Slope      Se         Velocity  Wetted Perimeter                   Slope
                                                                                                                                                                     2
             Reference                   Equation Type / Method                                Area (ha)    (km)              (%)       (m/km)        (m/s)   Area (m )  (m)          R          Modifier   Rs      Manning's n Chez's Coeff      tc (min)
             AR&R                        Eastern NSW Rational Method                             7.401                                                                                                                                               17

             5.05.3A QUDM                Bransby Williams                                          7.401    0.332                        14.9                                                                                                       15

             5.05.1 QUDM                 Overland Flow Based on Friends Equation                               0.11           2.1                                                                                     0.045                         20

             Table 5.05.4 QUDM           Concentrated Flow Based on Average Velocities                         0.01          15.2                       3                                                                                           0
                                                                                                               0.01          -13.9                     0.3                                                                                          0
                                                                                                               0.04           0.0                      0.3                                                                                          2
                                                                                                               0.05           1.6                      0.7                                                                                          1
                                                                                                               0.08           1.3                      0.3                                                                                          4
                                                                                                               0.05           3.5                      0.7                                                                                          1
                                         Overland Flow + Concentrated Flow                                                                                                                                                                          30

                                                                                                                                                                                                                               Average tc (min)    21
                                                                                                                                                                                                                              Adopted tc (min)     28
                                                                                                                                                                                                                                Range tc (min)    21-30

             FLOW CALCULATIONS

             5.02.2 QUDM                 Queensland Rational Method                            For a tc of 28 min & Area of 7.401 ha.                                     Flow Summary
                                         Trial 2                                                    tc of      30     min                                                 tc             21       28       30
                                                                                                                          tc
                                                             ARI                                  C10          Cy            Iy    A (ha)            Q (m3/s)                      Q (m3/s) Q (m3/s) Q (m3/s)
                                                               1                                 0.71         0.57       0.0       7.401               0.00
                                                               2                                 0.71         0.60       72.0      7.401               0.89                               1.07       0.94    0.89
                                                               5                                 0.71         0.67       90.0      7.401               1.25                               1.50       1.30    1.25
                                                              10                                 0.71         0.71      100.0      7.401               1.46                               1.73       1.53    1.46
                                                              20                                 0.71         0.75      120.0      7.401               1.84                               2.08       1.88    1.84
                                                              50                                 0.71         0.82      140.0      7.401               2.35                               2.71       2.40    2.35
                                                             100                                 0.71         0.85      148.0      7.401               2.59                               3.02       2.69    2.59

                                                                                                                             ARI
                                                                                                               Mins           1            2            5         10         20       50           100
                                                                                                                      30                        72           90     100        120         140       148
                                                                                                                      45                        58           75      82         95         118       122

                                                                                                                                       IFD Data
                                         Road Impervious                                             3388 m2                                           ARI
                                         North Catchment                                            74010 m2                             Mins           1         2          5        10            20       50        100
                                         fi =                                                       5%                                          20                87        110      120           138      165        175
                                         I (1hr, 10 min) =                                     70 mm/hr                                         25                82        100      112           126      148        162
                                         C10 = (from QUDM Table 5.04.2                             0.71                                         30                72         90      100           120      140        148
                                                                                                                                                45                58         75       82            95      118        122


H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\B07056 070802 Rational Method Calculations.xls

Page 34

                                                                                                                                                                                                                                                            Appendix B



            Time of Concentration and Rational Method Calculations
           Job:     RSL Care, Cooroy
           File:    H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\[B07056 070802 Rational Method Calculations.xls]South
           Date:    2/08/2007
           By:      KU

           TIME OF CONCENTRATION CALCULATIONS                                                      EXISTING SOUTHERN CATCHMENT
                                                                                                                                                                           Wetted
                                                                                                               Length         Av. Slope      Se         Velocity  Wetted Perimeter               Slope
           Reference                      Equation Type / Method                                   Area (ha)    (km)             (%)       (m/km)        (m/s)   Area (m2)  (m)      R          Modifier   Rs      Manning's n Chez's Coeff      tc (min)
           AR&R                           Eastern NSW Rational Method                                6.265                                                                                                                                          16

           5.05.3A QUDM                   Bransby Williams                                           6.265      0.384                       28.4                                                                                                   15

           5.05.1 QUDM                    Overland Flow Based on Friends Equation                                 0.2            1.9                                                                                 0.045                         25

           Table 5.05.4 QUDM              Concentrated Flow Based on Average Velocites                            0.01          14.2                      1.5                                                                                      0
                                                                                                                  0.02          3.5                       0.7                                                                                      1
                                                                                                                  0.05          0.0                       0.3                                                                                      3
                                                                                                                  0.02          6.6                       0.9                                                                                      0
                                                                                                                  0.04          1.8                       0.7                                                                                      1
                                                                                                                  0.01          14.4                      1.5                                                                                      0
                                                                                                                  0.04          2.0                       0.7                                                                                      1
                                          Overland Flow + Concentrated Flow                                                                                                                                                                        31

                                                                                                                                                                                                                              Average tc (min)    21
                                                                                                                                                                                                                             Adopted tc (min)     28
                                                                                                                                                                                                                               Range tc (min)    21-31

           FLOW CALCULATIONS

           5.02.2 QUDM                    Queensland Rational Method                               For a tc of 28 min & Area of 6.265 ha.                                Flow Summary
                                          Trial 2                                                       tc of      31     min                                            tc             21       28       31
                                                                                                                              tc
                                                              ARI                                     C10          Cy            Iy    A (ha)           Q (m3/s)                  Q (m3/s) Q (m3/s) Q (m3/s)
                                                                1                                    0.71         0.57       0.0       6.265              0.00
                                                                2                                    0.71         0.60       71.1      6.265              0.75                           0.90       0.80    0.75
                                                                5                                    0.71         0.67       89.0      6.265              1.04                           1.27       1.10    1.04
                                                               10                                    0.71         0.71       98.8      6.265              1.22                           1.46       1.29    1.22
                                                               20                                    0.71         0.75      118.3      6.265              1.54                           1.76       1.59    1.54
                                                               50                                    0.71         0.82      138.5      6.265              1.97                           2.30       2.03    1.97
                                                              100                                    0.71         0.85      146.3      6.265              2.17                           2.56       2.28    2.17

                                                                                                                                ARI
                                                                                                                  Mins           1           2            5         10       20       50          100
                                                                                                                         30                  72           90       100      120      140          148
                                                                                                                         45                  58           75        82       95      118          122

                                                                                                                                          IFD Data
                                          Road Impervious                                               2864 m2                                           ARI
                                          South Catchment                                              62650 m2                             Mins           1       2         5        10           20       50        100
                                          fi =                                                          5%                                         20              87       110      120          138      165        175
                                          I (1hr, 10 min) =                                        70 mm/hr                                        25              82       100      112          126      148        162
                                          C10 = (from QUDM Table 5.04.2                                0.71                                        30              72        90      100          120      140        148
                                                                                                                                                   45              58        75       82           95      118        122


H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\B07056 070802 Rational Method Calculations.xls

Page 35

                                                                                                      Appendix B


CONCEPT DETENTION BASIN DESIGN CALCULATIONS
File:      H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Detention Calcs MS 071009.xls]North Basin
Date:      22/10/2007
User:      MS
Note:      Storage and outlet calcs for North Basin

STAGE - STORAGE RELATIONSHIP FOR HYDROLOGICAL MODEL
Stage areas taken from ACAD model
                                      Accumulated
                    2            3             3
   RL       Area (m )     Vol. (m )     Vol. (m )
  99.6        1334          0.00          0
 99.75        1492         211.95        212
  100         1642         391.75        604
 100.25       1821         432.81        1037
 100.5        1999         477.44        1514
 100.7        2203         420.24        1934
  101         2510         707.01        2641

OUTLET CALCULATIONS
                        Circular Inlet Circular Inlet
Type                          1              2        INLET PIT   PIPE 1        PIPE 2       WEIR
Length                                                    2.4       15            15
Width                                                     0.9
No.                           1              5                       1            1
Dia (m)                      0.05          0.375                   0.75         0.825
         2
Area (m )                                                2.16      0.442        0.535
Invert Level (R.L)           99.2          99.6         100.25     99.15        99.15        100.7
Inflow Level (R.L)           99.2          99.6                    99.6         99.6
D/S HGL (R.L)                                                       99           99
f (Fig 1.6)                                                        0.023        0.023
Pit Loss (K)                                                        0.5          0.5
Hydraulic Conductivity (k) (m/hr)
Depth Media d (m)
Perimeter (m)                                             4.2                                  4
% Opening Clear *                                        50%

STAGE - DISCHARGE RELATIONSHIP FOR HYDROLOGICAL MODEL
          Accumulated Circular Inlet Circular Inlet
                   3
   RL       Vol. (m )       1              2        INLET PIT PIPE 1            PIPE 2       WEIR       TOTAL
  99.6          0         0.003          0.000        0.000   0.000             0.000        0.000       0.003
  99.75      212          0.004          0.401        0.000   0.446             0.485        0.000       0.405
   100       604          0.005          0.744        0.000   0.788             0.856        0.000       0.750
 100.25      1037         0.006          1.011        0.000   1.029             1.230        0.000       1.017
  100.5      1514         0.007          1.241        0.872   1.171             1.400        0.000       2.119
  100.7      1934         0.008          1.408        2.105   1.278             1.527        0.000       2.804
   101       2641         0.009          1.639        2.776   1.428             1.707        1.091       4.226

Note:
The following equations have been used to calculate flow capcaties for the
outlet types for each stage:
Pipe Flow (M.J.Boyd 1972)                        Q = 0.421 x g0.5 x Dia0.87 x HW 1.63 (where HW/Dia < 1.2)
                                                 Q = 0.53 x g0.5 x Dia1.87 x HW 0.63 (where HW/Dia > 1.2)
                                                 where g = 9.81m/s2
                                                                   1.5
Weir Equation (AR&R Equ. 14.5)                   Qi = 1.66 x P x d
Orifice Equation (AR&R Equ. 14.6)                Qi = 0.67 x A x (2g x d)0.5




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Detention Calcs MS 071009

Page 36

                                                                                                               Appendix B



CONCEPT DETENTION BASIN DESIGN CALCULATIONS
File:      H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Detention Calcs MS 071009.xls]South Basin
Date:      22/10/2007
User:      MS
Note:      Storage and outlet calcs for South Basin

STAGE - STORAGE RELATIONSHIP FOR HYDROLOGICAL MODEL
Stage areas taken from ACAD model
                                       Accumulated
   RL       Area (m2)     Vol. (m3)      Vol. (m3)
 101.5        1302          0.00          0
 101.75       1465         345.88        346
  102         1632         387.13        733
 102.25       1804         429.50        1163
 102.4        1910         278.52        1441
 102.5        1980         194.48        1636
 102.75       2159         517.38        2153
  103         2344         562.88        2716

OUTLET CALCULATIONS
                        Circular Inlet Circular Inlet
Type                           1             2        INLET PIT     PIPE 1        PIPE 2         WEIR
Length                                                    2.4         30            30
Width                                                     0.9
No.                            1             5                         1             2
Dia (m)                      0.05          0.375                     0.45          0.525
         2
Area (m )                                                2.16        0.159         0.216
Invert Level (R.L)           101           101.5        102.4        101.2         101.2         102.5
Inflow Level (R.L)           101           101.5                     101.5         101.5
D/S HGL (R.L)                                                         101           101
f (Fig 1.6)                                                          0.023         0.023
Pit Loss (K)                                                          0.5           0.5
Hydraulic Conductivity (k) (m/hr)
Depth Media d (m)
Perimeter (m)                                             4.2                                     3.75
% Opening Clear *                                        50%

STAGE - DISCHARGE RELATIONSHIP FOR HYDROLOGICAL MODEL
          Accumulated Circular Inlet Circular Inlet
   RL       Vol. (m3)       1              2        INLET PIT PIPE 2              PIPE 3         WEIR          TOTAL
  101.5         0         0.004          0.000        0.000   0.000               0.000          0.000          0.004
 101.75      346          0.005          0.554        0.000   0.256               0.568          0.000          0.559
   102       733          0.006          0.857        0.000   0.324               0.865          0.000          0.863
 102.25      1163         0.007          1.106        0.000   0.385               1.026          0.000          1.113
  102.4      1441         0.008          1.241        0.000   0.418               1.116          0.000          1.248
  102.5      1636         0.008          1.326        0.220   0.440               1.174          0.000          1.554
 102.75      2153         0.009          1.526        1.444   0.492               1.311          0.778          2.581
   103       2716         0.009          1.712        2.483   0.540               1.441          2.201          4.182

Note:
The following equations have been used to calculate flow capcaties for the
outlet types for each stage:
                                                               0.5       0.87      1.63
Pipe Flow (M.J.Boyd 1972)                        Q = 0.421 x g x Dia          x HW      (where HW/Dia < 1.2)
                                                             0.5       1.87      0.63
                                                 Q = 0.53 x g x Dia         x HW      (where HW/Dia > 1.2)
                                                 where g = 9.81m/s2
Weir Equation (AR&R Equ. 14.5)                   Qi = 1.66 x P x d1.5
Orifice Equation (AR&R Equ. 14.6)                Qi = 0.67 x A x (2g x d)0.5




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Detention Calcs MS 071009

Page 37

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

DRAINS Model Layouts




                                        Existing Scenario Model




                                       Developed Scenario Model




B07056.W-01A.doc

Page 38

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

DRAINS Model Layouts




                                       Mitigated Scenario Model




B07056.W-01A.doc

Page 39

                                                                                            Appendix B
 DRAINS MODEL RESULTS
Existing Scenario

Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Existing
Date:     22/10/2007
By:       MS

AR&R 2 year, 1 hour storm, average 50 mm/h, Zone 3

SUB-CATCHMENT DETAILS
Name        Max     Paved            Grassed          Paved   Grassed      Supp.
          Flow Q    Max Q             Max Q            Tc       Tc          Tc
         (cu.m/s)  (cu.m/s)          (cu.m/s)         (min)    (min)       (min)
SOUTH      0.945       0              0.945             0       28          28
NORTH      1.116      0               1.116             0       28          28

CONTINUITY CHECK for AR&R 2 year, 1 hour storm, average 50 mm/h, Zone 3
Node        Inflow    Outflow Storage Change Difference
            (cu.m)     (cu.m)        (cu.m)          %
N1         1715.76    1715.76           0            0
N2         2026.87    2026.87           0            0

AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3

SUB-CATCHMENT DETAILS
Name        Max     Paved            Grassed          Paved   Grassed      Supp.
          Flow Q    Max Q             Max Q            Tc       Tc          Tc
         (cu.m/s)  (cu.m/s)          (cu.m/s)         (min)    (min)       (min)
SOUTH      1.324       0              1.324             0       28          28
NORTH      1.564      0               1.564             0       28          28

CONTINUITY CHECK for AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
Node        Inflow    Outflow Storage Change Difference
            (cu.m)     (cu.m)        (cu.m)          %
N1         2503.98    2503.98           0            0
N2         2958.02    2958.02           0            0

AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3

SUB-CATCHMENT DETAILS
Name        Max     Paved            Grassed          Paved   Grassed      Supp.
          Flow Q    Max Q             Max Q            Tc       Tc          Tc
         (cu.m/s)  (cu.m/s)          (cu.m/s)         (min)    (min)       (min)
SOUTH      1.541       0              1.541             0       28          28
NORTH      1.821      0               1.821             0       28          28

CONTINUITY CHECK for AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
Node        Inflow    Outflow Storage Change Difference
            (cu.m)     (cu.m)       (cu.m)           %
N1         2933.07    2933.07          0             0
N2         3464.91    3464.91          0             0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 40

                                                                                            Appendix B
 DRAINS MODEL RESULTS
Existing Scenario

Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Existing
Date:     22/10/2007
By:       MS

AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3

SUB-CATCHMENT DETAILS
Name        Max     Paved            Grassed          Paved   Grassed        Supp.
          Flow Q    Max Q             Max Q            Tc       Tc            Tc
         (cu.m/s)  (cu.m/s)          (cu.m/s)         (min)    (min)         (min)
SOUTH      1.829       0              1.829             0       28            28
NORTH      2.161      0               2.161             0       28            28

CONTINUITY CHECK for AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
Node        Inflow    Outflow Storage Change Difference
            (cu.m)     (cu.m)       (cu.m)           %
N1         3552.03    3552.03          0             0
N2         4196.11    4196.11          0             0

AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3

SUB-CATCHMENT DETAILS
Name        Max     Paved            Grassed          Paved   Grassed        Supp.
          Flow Q    Max Q             Max Q            Tc       Tc            Tc
         (cu.m/s)  (cu.m/s)          (cu.m/s)         (min)    (min)         (min)
SOUTH      2.222       0              2.222             0       28            28
NORTH      2.625      0               2.625             0       28            28

CONTINUITY CHECK for AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3
Node        Inflow    Outflow Storage Change Difference
            (cu.m)     (cu.m)       (cu.m)           %
N1         4190.99    4190.99          0             0
N2         4950.92    4950.92          0             0

AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3

SUB-CATCHMENT DETAILS
Name        Max     Paved            Grassed          Paved   Grassed        Supp.
          Flow Q    Max Q             Max Q            Tc       Tc            Tc
         (cu.m/s)  (cu.m/s)          (cu.m/s)         (min)    (min)         (min)
SOUTH      2.461       0              2.461             0       28            28
NORTH      2.908      0               2.908             0       28            28

CONTINUITY CHECK for AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
Node        Inflow    Outflow Storage Change Difference
            (cu.m)     (cu.m)       (cu.m)           %
N1         5098.66    5098.66          0             0
N2         6023.17    6023.17          0             0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 41

                                                                                                                                           Appendix B


 DRAINS MODEL RESULTS
 Developed Scenario

 Filename:        H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Developed
 Date:            22/10/2007
 By:              MS

 AR&R 2 year

 SUB-CATCHMENT DETAILS
 Name               Max           Paved        Grassed       Paved         Grassed   Supp.   Due to Storm
                  Flow Q          Max Q         Max Q         Tc             Tc       Tc
                 (cu.m/s)        (cu.m/s)      (cu.m/s)      (min)          (min)    (min)
 SOUTH             1.512          0.948         0.596         17             17        0     AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 NORTH             1.805          0.828         1.036         13             13        0     AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 ENTRANCE RD       0.034          0.017         0.017          6              6        0     AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name          Max Q U/S        Max Q D/S                                                    Due to Storm
 OF1             1.512            1.512                                                      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 OF2             1.805            1.805                                                      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 OF4             0.034            0.034                                                      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 Sth OF          1.528            1.528                                                      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 Sth Outlet      1.512            1.512                                                      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 Nth Outlet      1.805            1.805                                                      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3

 CONTINUITY CHECK for AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 Node              Inflow      Outflow    Storage Change Difference
                   (cu.m)       (cu.m)         (cu.m)          %
 N1               1678.98      1678.98            0            0
 N2               1636.87      1636.87            0            0
 N4                 22.34        22.34            0            0
 N6               1701.33      1701.33            0            0
 N7               1636.87      1636.87            0            0                             * - Compares with Existing Scenario Node N2
 N8               1701.33      1701.33            0            0                             * - Compares with Existing Scenario Node N1
 N3               1678.98      1678.98            0            0
 N5               1636.87      1636.87            0            0

 AR&R 5 year

 SUB-CATCHMENT DETAILS
 Name               Max           Paved        Grassed       Paved         Grassed   Supp.   Due to Storm
                  Flow Q          Max Q         Max Q         Tc             Tc       Tc
                 (cu.m/s)        (cu.m/s)      (cu.m/s)      (min)          (min)    (min)
 SOUTH             1.993          1.139         0.898         17             17        0     AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 NORTH             2.359           1.01         1.411         13             13        0     AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3
 ENTRANCE RD       0.043          0.021         0.022          6              6        0     AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name          Max Q U/S        Max Q D/S                                                    Due to Storm
 OF1             1.993            1.993                                                      AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 OF2             2.359            2.359                                                      AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3
 OF4             0.043            0.043                                                      AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3
 Sth OF          2.018            2.018                                                      AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 Sth Outlet      1.993            1.993                                                      AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 Nth Outlet      2.359            2.359                                                      AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3

 CONTINUITY CHECK for AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 Node              Inflow      Outflow    Storage Change Difference
                   (cu.m)       (cu.m)         (cu.m)         %
 N1               3341.66      3341.66            0            0
 N2               3325.72      3325.72            0            0
 N4                 44.37        44.37            0            0
 N6               3386.03      3386.03            0            0
 N7               3325.72      3325.72            0            0                             * - Compares with Existing Scenario Node N2
 N8               3386.03      3386.03            0            0                             * - Compares with Existing Scenario Node N1
 N3               3341.66      3341.66            0            0
 N5               3325.72      3325.72            0            0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 42

                                                                                                                                         Appendix B


 DRAINS MODEL RESULTS
 Developed Scenario

 Filename:        H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Developed
 Date:            22/10/2007
 By:              MS

 AR&R 10 year

 SUB-CATCHMENT DETAILS
 Name               Max           Paved       Grassed        Paved     Grassed     Supp.   Due to Storm
                  Flow Q          Max Q        Max Q          Tc         Tc         Tc
                 (cu.m/s)        (cu.m/s)     (cu.m/s)       (min)      (min)      (min)
 SOUTH             2.269          1.265        1.034          17         17          0     AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 NORTH             2.729          1.132        1.654          13         13          0     AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone 3
 ENTRANCE RD       0.048          0.023        0.025           6          6          0     AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name          Max Q U/S        Max Q D/S                                                  Due to Storm
 OF1             2.269            2.269                                                    AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 OF2             2.729            2.729                                                    AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone 3
 OF4             0.048            0.048                                                    AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone 3
 Sth OF          2.297            2.297                                                    AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 Sth Outlet      2.269            2.269                                                    AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 Nth Outlet      2.729            2.729                                                    AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone 3

 CONTINUITY CHECK for AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 Node              Inflow      Outflow    Storage Change Difference
                   (cu.m)       (cu.m)         (cu.m)         %
 N1               3797.92      3797.92            0            0
 N2               3810.52      3810.52            0            0
 N4                 50.56        50.56            0            0
 N6               3848.48      3848.48            0            0
 N7               3810.52      3810.52            0            0                           * - Compares with Existing Scenario Node N2
 N8               3848.48      3848.48            0            0                           * - Compares with Existing Scenario Node N1
 N3               3797.92      3797.92            0            0
 N5               3810.52      3810.52            0            0

 AR&R 20 year

 SUB-CATCHMENT DETAILS
 Name               Max           Paved       Grassed        Paved     Grassed     Supp.   Due to Storm
                  Flow Q          Max Q        Max Q          Tc         Tc         Tc
                 (cu.m/s)        (cu.m/s)     (cu.m/s)       (min)      (min)      (min)
 SOUTH              2.66          1.446        1.223          17         17          0     AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 NORTH             3.181          1.274        1.943          13         13          0     AR&R 20 year, 30 minutes storm, average 120 mm/h, Zone 3
 ENTRANCE RD       0.048          0.023        0.025           6          6          0     AR&R 20 year, 25 minutes storm, average 126 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name          Max Q U/S        Max Q D/S                                                  Due to Storm
 OF1              2.66            2.66                                                     AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 OF2             3.181            3.181                                                    AR&R 20 year, 30 minutes storm, average 120 mm/h, Zone 3
 OF4             0.048            0.048                                                    AR&R 20 year, 25 minutes storm, average 126 mm/h, Zone 3
 Sth OF          2.692            2.692                                                    AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 Sth Outlet       2.66            2.66                                                     AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 Nth Outlet      3.181            3.181                                                    AR&R 20 year, 30 minutes storm, average 120 mm/h, Zone 3

 CONTINUITY CHECK for AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 Node              Inflow      Outflow    Storage Change Difference
                   (cu.m)       (cu.m)         (cu.m)         %
 N1               4453.02      4453.02            0            0
 N2               4507.29      4507.29            0            0
 N4                 50.56        50.56            0            0
 N6               4503.58      4503.58            0            0
 N7               4507.29      4507.29            0            0                           * - Compares with Existing Scenario Node N2
 N8               4503.58      4503.58            0            0                           * - Compares with Existing Scenario Node N1
 N3               4453.02      4453.02            0            0
 N5               4507.29      4507.29            0            0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 43

                                                                                                                                         Appendix B


 DRAINS MODEL RESULTS
 Developed Scenario

 Filename:        H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Developed
 Date:            22/10/2007
 By:              MS

 AR&R 50 year

 SUB-CATCHMENT DETAILS
 Name               Max           Paved       Grassed       Paved      Grassed     Supp.   Due to Storm
                  Flow Q          Max Q        Max Q         Tc          Tc         Tc
                 (cu.m/s)        (cu.m/s)     (cu.m/s)      (min)       (min)      (min)
 SOUTH             3.079          1.636        1.443         17          17          0     AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 NORTH             3.618          1.372        2.246         13          13          0     AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3
 ENTRANCE RD       0.048          0.023        0.025          6           6          0     AR&R 50 year, 25 minutes storm, average 148 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name          Max Q U/S        Max Q D/S                                                  Due to Storm
 OF1             3.079            3.079                                                    AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 OF2             3.618            3.618                                                    AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3
 OF4             0.048            0.048                                                    AR&R 50 year, 25 minutes storm, average 148 mm/h, Zone 3
 Sth OF          3.111            3.111                                                    AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 Sth Outlet      3.079            3.079                                                    AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 Nth Outlet      3.618            3.618                                                    AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3

 CONTINUITY CHECK for AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3
 Node              Inflow      Outflow    Storage Change Difference
                   (cu.m)       (cu.m)         (cu.m)          %
 N1               5085.34      5085.34            0            0
 N2               5207.46      5207.46            0            0
 N4                 44.26        44.26            0            0
 N6                5129.6      5129.6             0            0
 N7               5207.46      5207.46            0            0                           * - Compares with Existing Scenario Node N2
 N8                5129.6      5129.6             0            0                           * - Compares with Existing Scenario Node N1
 N3               5085.34      5085.34            0            0
 N5               5207.46      5207.46            0            0

 AR&R 100 year

 SUB-CATCHMENT DETAILS
 Name               Max           Paved       Grassed       Paved      Grassed     Supp.   Due to Storm
                  Flow Q          Max Q        Max Q         Tc          Tc         Tc
                 (cu.m/s)        (cu.m/s)     (cu.m/s)      (min)       (min)      (min)
 SOUTH             3.424          1.809        1.615         17          17          0     AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 NORTH             3.935          1.522        2.439         13          13          0     AR&R 100 year, 25 minutes storm, average 162 mm/h, Zone 3
 ENTRANCE RD       0.048          0.023        0.025          6           6          0     AR&R 100 year, 25 minutes storm, average 162 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name          Max Q U/S        Max Q D/S                                                  Due to Storm
 OF1             3.424            3.424                                                    AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 OF2             3.935            3.935                                                    AR&R 100 year, 25 minutes storm, average 162 mm/h, Zone 3
 OF4             0.048            0.048                                                    AR&R 100 year, 25 minutes storm, average 162 mm/h, Zone 3
 Sth OF          3.456            3.456                                                    AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 Sth Outlet      3.424            3.424                                                    AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 Nth Outlet      3.935            3.935                                                    AR&R 100 year, 25 minutes storm, average 162 mm/h, Zone 3

 CONTINUITY CHECK for AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 Node              Inflow     Outflow     Storage Change Difference
                   (cu.m)      (cu.m)          (cu.m)          %
 N1               6090.65     6090.65             0            0
 N2               6248.47     6248.47             0            0
 N4                 50.56       50.56             0            0
 N6                6141.2      6141.2             0            0
 N7               6248.47     6248.47             0            0                           * - Compares with Existing Scenario Node N2
 N8                6141.2      6141.2             0            0                           * - Compares with Existing Scenario Node N1
 N3               6090.65     6090.65             0            0
 N5               6248.47     6248.47             0            0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 44

                                                                                                                                          Appendix B


 DRAINS MODEL RESULTS
 Mitigated Scenario

 Filename:       H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Mitigated
 Date:           22/10/2007
 By:             MS

 AR&R 2 year

 SUB-CATCHMENT DETAILS
 Name             Max          Paved        Grassed       Paved      Grassed      Supp.    Due to Storm
                Flow Q         Max Q         Max Q         Tc          Tc          Tc
               (cu.m/s)       (cu.m/s)      (cu.m/s)      (min)       (min)       (min)
 SOUTH           1.512         0.948         0.596         17          17           0      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 NORTH           1.805         0.828         1.036         13          13           0      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 ENTRANCE RD     0.034         0.017         0.017          6           6           0      AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name        Max Q U/S Max Q D/S                                                           Due to Storm
 OF1            1.512    1.512                                                             AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 OF2            1.805    1.805                                                             AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 OF4            0.034    0.034                                                             AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 Sth OF         0.948    0.948                                                             AR&R 2 year, 1 hour storm, average 50 mm/h, Zone 3
 Sth Outlet     0.941    0.941                                                             AR&R 2 year, 1 hour storm, average 50 mm/h, Zone 3
 Nth Outlet     0.937    0.937                                                             AR&R 2 year, 1 hour storm, average 50 mm/h, Zone 3

 DETENTION BASIN DETAILS
 Name           Max WL         MaxVol        Max Q       Max Q        Max Q
                                             Total      Low Level   High Level
 Sth Basin         102.08       862.5        0.941         0          0.941
 Nth Basin         100.18       901.7        0.937         0          0.937

 CONTINUITY CHECK for AR&R 2 year, 25 minutes storm, average 82 mm/h, Zone 3
 Node            Inflow     Outflow    Storage Change Difference
                 (cu.m)      (cu.m)         (cu.m)          %
 N1             1678.98     1678.98            0             0
 N2             1636.87     1636.87            0             0
 N4               22.34       22.34            0             0
 N6             1681.28     1681.28            0             0
 N7             1608.73     1608.73            0             0                             * - Compares with Existing Scenario Node N2
 Sth Basin      1678.98     1678.98          1.98          -0.1
 N8             1681.05     1681.05            0             0                             * - Compares with Existing Scenario Node N1
 Nth Basin      1636.87     1636.87          0.69            0

 AR&R 5 year

 SUB-CATCHMENT DETAILS
 Name             Max          Paved        Grassed       Paved      Grassed      Supp.    Due to Storm
                Flow Q         Max Q         Max Q         Tc          Tc          Tc
               (cu.m/s)       (cu.m/s)      (cu.m/s)      (min)       (min)       (min)
 SOUTH           1.993         1.139         0.898         17          17           0      AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 NORTH           2.359          1.01         1.411         13          13           0      AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3
 ENTRANCE RD     0.043         0.021         0.022          6           6           0      AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3

 OVERFLOW ROUTE DETAILS
 Name        Max Q U/S Max Q D/S                                                           Due to Storm
 OF1            1.993    1.993                                                             AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 OF2            2.359    2.359                                                             AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3
 OF4            0.043    0.043                                                             AR&R 5 year, 25 minutes storm, average 100 mm/h, Zone 3
 Sth OF          1.16    1.16                                                              AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 Sth Outlet     1.152    1.152                                                             AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 Nth Outlet     1.467    1.467                                                             AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3

 DETENTION BASIN DETAILS
 Name           Max WL         MaxVol        Max Q       Max Q        Max Q
                                             Total      Low Level   High Level
 Sth Basin         102.29      1239.8        1.152         0          1.152
 Nth Basin         100.35      1224.6        1.467         0          1.467

 CONTINUITY CHECK for AR&R 5 year, 1 hour storm, average 63 mm/h, Zone 3
 Node            Inflow     Outflow    Storage Change Difference
                 (cu.m)      (cu.m)          (cu.m)          %
 N1             3341.66     3341.66             0            0
 N2             3325.72     3325.72             0            0
 N4               44.37       44.37             0            0
 N6              3363.9     3363.9              0            0
 N7              3308.2     3308.2              0            0                             * - Compares with Existing Scenario Node N2
 Sth Basin      3341.66     3341.66           2.01          -0.1
 N8             3363.67     3363.67             0            0                             * - Compares with Existing Scenario Node N1
 Nth Basin      3325.72     3325.72           0.63           0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 45

                                                                                                                                         Appendix B


 DRAINS MODEL RESULTS
 Mitigated Scenario

 Filename:       H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Mitigated
 Date:           22/10/2007
 By:             MS

 AR&R 10 year

 SUB-CATCHMENT DETAILS
 Name             Max          Paved        Grassed       Paved      Grassed      Supp.    Due to Storm
                Flow Q         Max Q         Max Q         Tc          Tc          Tc
               (cu.m/s)       (cu.m/s)      (cu.m/s)      (min)       (min)       (min)
 SOUTH           2.269         1.265         1.034         17          17           0      AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 NORTH           2.729         1.132         1.654         13          13           0      AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone
 ENTRANCE RD     0.048         0.023         0.025          6           6           0      AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone

 OVERFLOW ROUTE DETAILS
 Name        Max Q U/S Max Q D/S                                                           Due to Storm
 OF1            2.269    2.269                                                             AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 OF2            2.729    2.729                                                             AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone
 OF4            0.048    0.048                                                             AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone
 Sth OF          1.28    1.28                                                              AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 Sth Outlet      1.27    1.27                                                              AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 Nth Outlet     1.761    1.761                                                             AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3

 DETENTION BASIN DETAILS
 Name           Max WL         MaxVol        Max Q       Max Q        Max Q
                                             Total      Low Level   High Level
 Sth Basin         102.41      1454.3         1.27         0           1.27
 Nth Basin         100.42      1352.2        1.761         0          1.761

 CONTINUITY CHECK for AR&R 10 year, 1 hour storm, average 70 mm/h, Zone 3
 Node            Inflow     Outflow    Storage Change Difference
                 (cu.m)      (cu.m)         (cu.m)          %
 N1             3797.92     3797.92            0             0
 N2             3810.52     3810.52            0             0
 N4               50.56       50.56            0             0
 N6             3822.16     3822.16            0             0
 N7             3794.51     3794.51            0             0                             * - Compares with Existing Scenario Node N2
 Sth Basin      3797.92     3797.92           2.8          -0.1
 N8             3821.84     3821.84            0             0                             * - Compares with Existing Scenario Node N1
 Nth Basin      3810.52     3810.52          0.75            0

 AR&R 20 year

 SUB-CATCHMENT DETAILS
 Name             Max          Paved        Grassed       Paved      Grassed      Supp.    Due to Storm
                Flow Q         Max Q         Max Q         Tc          Tc          Tc
               (cu.m/s)       (cu.m/s)      (cu.m/s)      (min)       (min)       (min)
 SOUTH            2.66         1.446         1.223         17          17           0      AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 NORTH           3.181         1.274         1.943         13          13           0      AR&R 20 year, 30 minutes storm, average 120 mm/h, Zone
 ENTRANCE RD     0.048         0.023         0.025          6           6           0      AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone

 OVERFLOW ROUTE DETAILS
 Name        Max Q U/S Max Q D/S                                                           Due to Storm
 OF1             2.66    2.66                                                              AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 OF2            3.181    3.181                                                             AR&R 20 year, 30 minutes storm, average 120 mm/h, Zone
 OF4            0.048    0.048                                                             AR&R 10 year, 25 minutes storm, average 112 mm/h, Zone
 Sth OF         1.683    1.683                                                             AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 Sth Outlet     1.674    1.674                                                             AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 Nth Outlet     2.133    2.133                                                             AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3

 DETENTION BASIN DETAILS
 Name           Max WL         MaxVol        Max Q       Max Q        Max Q
                                             Total      Low Level   High Level
 Sth Basin         102.53       1693         1.674         0          1.674
 Nth Basin         100.51      1522.4        2.133         0          2.133

 CONTINUITY CHECK for AR&R 20 year, 1 hour storm, average 80 mm/h, Zone 3
 Node            Inflow     Outflow    Storage Change Difference
                 (cu.m)      (cu.m)         (cu.m)          %
 N1             4453.02     4453.02            0             0
 N2             4507.29     4507.29            0             0
 N4               50.56       50.56            0             0
 N6             4482.73     4482.73            0             0
 N7             4488.76     4488.76            0             0                             * - Compares with Existing Scenario Node N2
 Sth Basin      4453.02     4453.02          3.84          -0.1
 N8             4482.29     4482.29            0             0                             * - Compares with Existing Scenario Node N1
 Nth Basin      4507.29     4507.29          0.95            0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 46

                                                                                                                                         Appendix B


 DRAINS MODEL RESULTS
 Mitigated Scenario

 Filename:       H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\[DRAINS Results.xls]Mitigated
 Date:           22/10/2007
 By:             MS

 AR&R 50 year

 SUB-CATCHMENT DETAILS
 Name             Max          Paved        Grassed       Paved      Grassed      Supp.    Due to Storm
                Flow Q         Max Q         Max Q         Tc          Tc          Tc
               (cu.m/s)       (cu.m/s)      (cu.m/s)      (min)       (min)       (min)
 SOUTH           3.079         1.636         1.443         17          17           0      AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 NORTH           3.618         1.372         2.246         13          13           0      AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone
 ENTRANCE RD     0.048         0.023         0.025          6           6           0      AR&R 50 year, 25 minutes storm, average 148 mm/h, Zone

 OVERFLOW ROUTE DETAILS
 Name        Max Q U/S Max Q D/S                                                           Due to Storm
 OF1            3.079    3.079                                                             AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 OF2            3.618    3.618                                                             AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone
 OF4            0.048    0.048                                                             AR&R 50 year, 25 minutes storm, average 148 mm/h, Zone
 Sth OF         2.134    2.134                                                             AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 Sth Outlet     2.123    2.123                                                             AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3
 Nth Outlet     2.433    2.433                                                             AR&R 50 year, 1 hour storm, average 95 mm/h, Zone 3

 DETENTION BASIN DETAILS
 Name           Max WL         MaxVol        Max Q       Max Q        Max Q
                                             Total      Low Level   High Level
 Sth Basin         102.64      1915.9        2.123         0          2.123
 Nth Basin         100.62      1754.9        2.433         0          2.433

 CONTINUITY CHECK for AR&R 50 year, 45 minutes storm, average 118 mm/h, Zone 3
 Node            Inflow     Outflow    Storage Change Difference
                 (cu.m)      (cu.m)         (cu.m)          %
 N1             5085.34     5085.34            0            0
 N2             5207.46     5207.46            0            0
 N4               44.26       44.26            0            0
 N6             5103.92     5103.92            0            0
 N7             5183.63     5183.63            0            0                              * - Compares with Existing Scenario Node N2
 Sth Basin      5085.34     5085.34          11.72         -0.2
 N8             5102.58     5102.58            0            0                              * - Compares with Existing Scenario Node N1
 Nth Basin      5207.46     5207.46           3.09         -0.1

 AR&R 100 year

 SUB-CATCHMENT DETAILS
 Name             Max          Paved        Grassed       Paved      Grassed      Supp.    Due to Storm
                Flow Q         Max Q         Max Q         Tc          Tc          Tc
               (cu.m/s)       (cu.m/s)      (cu.m/s)      (min)       (min)       (min)
 SOUTH           3.424         1.809         1.615         17          17           0      AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 NORTH           3.935         1.522         2.439         13          13           0      AR&R 100 year, 25 minutes storm, average 162 mm/h, Zon
 ENTRANCE RD     0.048         0.023         0.025          6           6           0      AR&R 100 year, 25 minutes storm, average 162 mm/h, Zon

 OVERFLOW ROUTE DETAILS
 Name        Max Q U/S Max Q D/S                                                           Due to Storm
 OF1            3.424    3.424                                                             AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 OF2            3.935    3.935                                                             AR&R 100 year, 25 minutes storm, average 162 mm/h, Zon
 OF4            0.048    0.048                                                             AR&R 100 year, 25 minutes storm, average 162 mm/h, Zon
 Sth OF         2.456    2.456                                                             AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 Sth Outlet     2.445    2.445                                                             AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 Nth Outlet     2.688    2.688                                                             AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3

 DETENTION BASIN DETAILS
 Name           Max WL         MaxVol        Max Q       Max Q        Max Q
                                             Total      Low Level   High Level
 Sth Basin         102.72      2081.3        2.445         0          2.445
 Nth Basin         100.71      1962.3        2.688         0          2.688

 CONTINUITY CHECK for AR&R 100 year, 1 hour storm, average 105 mm/h, Zone 3
 Node            Inflow     Outflow    Storage Change Difference
                 (cu.m)      (cu.m)         (cu.m)          %
 N1             6090.65     6090.65            0            0
 N2             6248.47     6248.47            0            0
 N4               50.56       50.56            0            0
 N6             6121.86     6121.86            0            0
 N7             6226.04     6226.04            0            0                              * - Compares with Existing Scenario Node N2
 Sth Basin      6090.65     6090.65          6.76          -0.1
 N8             6121.09     6121.09            0            0                              * - Compares with Existing Scenario Node N1
 Nth Basin      6248.47     6248.47          1.75           0




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\DRAINS\071011\DRAINS Results

Page 47

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

                                       APPENDIX C:

                     FLOOD INVESTIGATION RESULTS




B07056.W-01A.doc

Page 48

                                                                                                                                            Appendix C



WEIR CALCULATIONS
Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Weir Calcs MS 071017.xls]design ds_weir-data
Date:     22/10/2007
By:       MS

Northern Dam                                                           Northern Dam

North XS 1 - Dam Weir                                                  North XS 2 - Dam Weir on other side of boundary
WSL (m AHD)               100.062                                      WSL (m AHD)               99.684
Flow (m3/s)                2.91                                        Flow (m3/s)                2.91

Weir Flow Coefficient       1.66                                       Weir Flow Coefficient       1.66

Chainage RL (m AHD)        P (m)      D (m)      Q (m3/s)   Extents    Chainage     RL (m AHD)     P (m)    D (m)      Q (m3/s)   Extents
  0.00     100.25                                                         0.00        100.32
  5.68      99.99          1.57       0.04         0.02      4.11         3.55        100.00
  9.19      99.83          3.51       0.15         0.35                   6.34         99.75
 22.79      99.89          13.60      0.20         2.05                   9.09         99.50       2.02      0.09        0.09      7.07
 30.01     100.00          7.22       0.12         0.48                   12.83        99.50       3.74      0.18        0.49
 31.97     100.15          0.81       0.03         0.01      30.82        17.96        99.60       5.13      0.13        0.42
 46.52     100.07                                                         20.46        99.50       2.50      0.13        0.20
 51.80     100.25                                                         24.06        99.36       3.60      0.25        0.76
 54.36     100.34                                                         27.66         99.5       3.60      0.25        0.76
 56.26      100.5                                                         32.71        99.75       3.72      0.09        0.17     31.38

                   Calculated Weir Flow (m3/s)     2.90                                  Calculated Weir Flow (m3/s)      2.91
                                  % Difference    0.35%                                                 % Difference     0.10%




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Weir Calcs MS 071017

Page 49

                                                                                                           Appendix C
 MANNING'S CALCULATION
Filename:     H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Manning's Calcs MS 071017.xls]Sthn
Date:         22/10/2007
By:           MS

Manning's calculation as per Equation 4.2.3 of Australian Rainfall and Runoff (1987)

Southern Dam
South XS 1 - Downstream of Dam
CROSS SECTION DETAILS                                         EXISTING 100 YEAR ARI
  POINT         CH           Z                     n          wA       wP      n x wA



     1                0.000           103.000
     2                4.480           102.750    0.045        0.15      2.33      0.01
     3                5.340           102.500    0.045        0.22      0.90      0.01
     4                6.130           102.250    0.045        0.40      0.83      0.02
     5                7.320           102.500    0.045        0.60      1.22      0.03
     6                8.460           102.750    0.045        0.29      1.17      0.013
     7                9.570           103.000    0.045        0.04      0.59      0.002
     8               21.860           103.000    0.045
     9
     10
     11
     12
     13
     14


                                                               wA       wP     n x wA
                                                TOTAL       1.698842 7.032164 0.076448
                       S
                     0.028                                      R        n         Q
                                                            0.241582   0.045      2.45
                                                Q100 Flow              2.46

                                                    WSL                102.88

                     Calculated by Manning's Equation                   2.45



           103.200



           103.000



           102.800



           102.600



           102.400



           102.200                                                              Existing Surface
                                                                                EXISTING 100 Y ARI WSL

           102.000
  -3.000                      2.000                7.000               12.000              17.000        22.000



H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Manning's Calcs MS 071017

Page 50

                                                                                                          Appendix C



WEIR CALCULATIONS
Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Weir Calcs MS 071017.xls]design ds_weir-data
Date:     22/10/2007
By:       MS

Southern Dam

South XS 2 - Trading Post Road Weir
WSL (m AHD)              102.183
Flow (m3/s)                2.46

Weir Flow Coefficient       1.66

Chainage RL (m AHD)        P (m)      D (m)      Q (m3/s)   Extents
  0.00     102.25
  6.31     102.00           4.62      0.09         0.21      1.69
 13.35     101.92           7.04      0.22         1.23
 18.31     102.00           4.96      0.22         0.87
 20.36     102.13           2.05      0.12         0.14
 27.31     102.25           3.07      0.03         0.02      23.43
 34.52     102.50


                   Calculated Weir Flow (m3/s)     2.47
                                  % Difference   -0.40%




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Weir Calcs MS 071017

Page 51

                                                                                                         Appendix C
 MANNING'S CALCULATION
Filename:     H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Manning's Calcs MS 071017.xls]Sthn
Date:         22/10/2007
By:           MS

Manning's calculation as per Equation 4.2.3 of Australian Rainfall and Runoff (1987)

Southern Dam
South XS 3 - Downstream of Pipe
CROSS SECTION DETAILS                                 EXISTING 100 YEAR ARI
  POINT         CH          Z                 n       wA       wP      n x wA



     1           0.000      102.250
     2           7.170      102.000      0.045
     3           14.830     101.750      0.045
     4           15.620     101.500      0.045
     5           16.330     101.250      0.045        0.02       0.36         0.00
     6           17.060     101.000      0.045        0.18       0.77         0.01
     7           18.670     100.800      0.045        0.76       1.62         0.03
     8           20.290     101.000      0.045        0.76       1.63         0.03
     9           21.140     101.250      0.045        0.21       0.89         0.01
     10          22.810     101.500      0.045        0.05       0.81         0.00
     11          25.000     101.750      0.045
     12          28.640     102.000      0.045
     13          33.980     102.250      0.045
     14


                                                       wA         wP         n x wA
                                       TOTAL        1.973744    6.08414    0.0888185
                   S
                 0.014                                  R          n           Q
                                                    0.324408     0.045        2.45
                                        Q100 Flow                2.46

                                              WSL               101.37

                Calculated by Manning's Equation                 2.45


   102.500



   102.000



   101.500



   101.000



   100.500
                                                                           Existing Surface
                                                                           EXISTING 100 Y ARI WSL

    100.000
   -2.000           3.000             8.000            13.000             18.000              23.000   28.000




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Manning's Calcs MS 071017

Page 52

                                                                                                        Appendix C
 MANNING'S CALCULATION
Filename:     H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[Manning's Calcs MS 071017.xls]Sthn
Date:         22/10/2007
By:           MS

Manning's calculation as per Equation 4.2.3 of Australian Rainfall and Runoff (1987)

Southern Dam
South XS 4 - Downstream lot
CROSS SECTION DETAILS                                 EXISTING 100 YEAR ARI
  POINT         CH          Z                 n       wA       wP      n x wA



     1           0.000      102.250
     2           5.690      102.000      0.045
     3           8.960      101.750      0.045
     4           12.050     101.500      0.045
     5           13.690     101.250      0.045        0.03       0.60        0.00
     6           15.310     101.000      0.045        0.35       1.64        0.02
     7           16.920     100.800      0.045        0.71       1.62        0.03
     8           17.840     101.000      0.045        0.40       0.94        0.02
     9           18.760     101.250      0.045        0.20       0.95        0.01
     10          19.940     101.500      0.045        0.02       0.43        0.00
     11          21.130     101.750      0.045
     12          22.940     102.000      0.045
     13          26.930     102.250      0.045
     14


                                                       wA       wP      n x wA
                                       TOTAL        1.704984 6.187852 0.0767243
                   S
                 0.023                                  R          n          Q
                                                    0.275537     0.045       2.43
                                        Q100 Flow                2.46

                                              WSL               101.34

                Calculated by Manning's Equation                 2.43


   102.500



   102.000



   101.500



   101.000



   100.500
                                                                          Existing Surface
                                                                          EXISTING 100 Y ARI WSL

    100.000
   -2.000           3.000             8.000            13.000            18.000              23.000   28.000




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Manning's Calcs MS 071017

Page 53

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



                                       APPENDIX D:

       MUSIC MODEL LAYOUTS, DATA AND RESULTS




B07056.W-01A.doc

Page 54

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

B07056 Existing Site Only - AGRIC.sqz




B07056.W-01A.doc

Page 55

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

B07056 Developed Site Only Unmitigated.sqz




B07056 Developed Site Only Unmitigated.sqz




B07056.W-01A.doc

Page 56

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

B07056 Developed Total Unmitigated.sqz




B07056.W-01A.doc

Page 57

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village

B07056 Developed Total Mitigated.sqz




B07056.W-01A.doc

Page 58

                                                                                                                                                                                                                                    Appendix B




RSL CARE, COOROY                                     MUSIC Model Calculations

Job:                               RSL Care, Cooroy
File:                              H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[B07056 Area Calculations.xls]Imperv - Layout 2
Date:                                  22/10/2007
By:                                KU

Northern Catchment
MUSIC Model Impervious Area Calculations
Site Only Catchment

Data for GCCC Node model
Northern Site Area                           41444
Total Non-Roof Area                          29155 <This entered to MUSIC "Developed Site Only Unmitigated"                 Node:            Remainder of North Catch
Non-Roof Impervious Area                      7747
% Impervious                                  27%
Effective % Impervious                         8% <This entered to MUSIC "Developed Site Only Unmitigated"

MUSIC Data
                                     Catchment         Impervious           %        Effective %                              Ave. Surface    Filter Media   Extended Detention   Permanent Pool   Rainwater Tank
MUSIC Catchment                         Area              Area          Impervious   Impervious    Treatment Device Name         Area             Area             Depth             Volume            Volume       Surface Area*
                                         ha                ha               %            0.31                                      m2              m2                m                  m                kL              m2
North Bio Basin Catch                  1.527             0.308              20            6        North Bio Basin                110              25               0.40                -                 -               -
North Bio Pod 1 Catch                  0.122                -               65            20       North Bio Pod 1                 17              17               0.25                -                 -               -
North Bio Pod 2 Catch                  0.168                -               65            20       North Bio Pod 2                 31              15               0.25                -                 -               -
North Catch                            1.005             0.320              32            10       5 x Nth Enviropods               -                -                -                 -                 -               -
North ILU Roofs                        0.701                -              100           100       North Rainwater Tank             -                -                -                 -                250             125
RAC Roof                               0.378                -              100           100       RAC Rainwater Tank               -                -                -                 -                50              25
Apt 1 Roof                             0.150                -              100           100       GPT North                        -                -                -                 -                 -               -
Remainder of North Catch               2.931             0.198              7             2        GPT North                        -                -                -                 -                 -               -
                                                                                                   North Wetland                 1202                -              0.40              1072                -               -

*Tank assumed 2m deep.

Southern Catchment
MUSIC Model Impervious Area Calculations
Site Only Catchment

Data for GCCC Node model
Southern Site Area                           52928
Total Non-Roof Area                          35244 <This entered to MUSIC "Developed Site Only Unmitigated"                 Node:            Remainder of South Catch
Non-Roof Impervious Area                      9637
% Impervious                                  27%
Effective % Impervious                         8% <This entered to MUSIC "Developed Site Only Unmitigated"

MUSIC Data
                                     Catchment         Impervious           %        Effective %                              Ave. Surface    Filter Media   Extended Detention Permanent Pool     Rainwater Tank
MUSIC Catchment                         Area              Area          Impervious   Impervious    Treatment Device Name         Area             Area             Depth        Volume             Volume           Surface Area*
                                         ha                ha               %            0.31                                      m2              m2                m                 m                 kL              m2
South Bio Basin Catch                  0.930             0.238              26            8        South Bio Basin                 40              10               0.4                -                   -              -
South Catch                            3.454             0.906              26            8        8 x Sth Enviropods               -                -               -                 -                   -              -
Central ILU Roofs                      0.244                -              100           100       Central Rainwater Tank           -                -               -                 -                  39             19.5
South ILU roofs                        1.303                -              100           100       South Rainwater Tank             -                -               -                 -                 350             175
Village Ctr Roof                       0.082                -              100           100       GPT South                        -                -               -                 -                   -              -
Apt 2 Roof                             0.140                -              100           100       South Rainwater Tank             -                -               -                 -                   -              -
Remainder of South Catch               0.424             0.012              3             1        South Wetland
                                                                                                   South Wetland                    991            -                    0.2            630                -               -
                                                                                                   South Pond                       216            -                    0.5            150                -               -

*Tank assumed 2m deep.




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\B07056 Area Calculations.xls

Page 59

                                                                                                                                                   Appendix D




RSL CARE, COOROY                               MUSIC RESULTS

Title:                                         MUSIC Results
Job:                                           RSL Care, Cooroy
File:                                          H:\B07\050-099\B07056 - RSL Care Cooroy.WW\MUSIC\[B07056 MUSIC Results.xls]Results
Date:                                              8/11/2007
By:                                            KU

Existing Site Only - Agricultural                                                                        "B07056 Existing Site Only - Agric.sqz"

                                               Inflow
Flow (ML/yr)                                              52.7
Total Suspended Solids (kg/yr)                            9190
Total Phosphorus (kg/yr)                                  25.7
Total Nitrogen (kg/yr)                                     180
Gross Pollutants (kg/yr)                                     0

B07056 Existing Site Only - AGRIC - Receiving Node - Flow-Based Sub-Sample Statistics
Inflow                                   mean           standard deviation median         maximum minimum       10 percentile 90 percentile
Flow (cubic metres/sec)                        0.00734             0.0554       0.00199        4.29       0.001       0.00115       0.00368
TSS Concentration (mg/L)                           32.5               49.9          25.4       2310        7.86           17.2          38.8
Log [TSS] (mg/L)                                   1.43              0.201            1.4      3.36       0.895           1.23          1.59
TP Concentration (mg/L)                           0.153              0.126         0.133       6.87     0.0366            0.09         0.203
Log [TP] (mg/L)                                  -0.863              0.169        -0.875      0.837       -1.44          -1.05        -0.693
TN Concentration (mg/L)                            1.33              0.805            1.2      27.5       0.343          0.811          1.82
Log [TN] (mg/L)                                 0.0881               0.158       0.0782        1.44      -0.465       -0.0909           0.26
TSS Load (kg/6 Minutes)                           0.498               6.87       0.0182        1070    0.00321        0.00946          0.038
TP Load (kg/6 Minutes)                         0.00137             0.0169    0.0000959          1.7 0.0000166      0.0000497      0.000199
TN Load (kg/6 Minutes)                         0.00955               0.127    0.000863         30.9  0.000141       0.000447        0.00178
Gross Pollutant Load (kg/6 Minutes)                   0                   0             0         0           0              0              0

Developed Site Only - Unmitigated                                                                 "B07056 Developed Site Only Unmitigated.sqz"

                                               Sources           Residual Load    % Reduction
Flow (ML/yr)                                              84.5               84.5            0
Total Suspended Solids (kg/yr)                            8300               8300            0
Total Phosphorus (kg/yr)                                  21.9               21.9            0
Total Nitrogen (kg/yr)                                     175                175            0
Gross Pollutants (kg/yr)                                  1410               1410            0

Total Developed Catchment - Unmitigated                                                              "B07056 Developed Total Unmitigated.sqz"

                                               Sources           Residual Load    % Reduction
Flow (ML/yr)                                               108                108            0
Total Suspended Solids (kg/yr)                           12600              12600            0
Total Phosphorus (kg/yr)                                    31                 31            0
Total Nitrogen (kg/yr)                                     221                221            0
Gross Pollutants (kg/yr)                                  1490               1490            0

B07056 Developed Total Unmitigated - Receiving Node - Flow-Based Sub-Sample Statistics
Inflow                                 mean            standard deviation median        maximum minimum       10 percentile 90 percentile
Flow (cubic metres/sec)                        0.0162               0.094       0.0028       5.88       0.001       0.00115        0.0198
TSS Concentration (mg/L)                          33.3               37.2          16.2       796        2.65           8.45          77.2
Log [TSS] (mg/L)                                  1.34               0.38          1.21        2.9      0.423          0.927          1.89
TP Concentration (mg/L)                          0.167            0.0737         0.153       2.05     0.0354         0.0904          0.258
Log [TP] (mg/L)                                 -0.815              0.178       -0.815      0.312       -1.45          -1.04        -0.588
TN Concentration (mg/L)                           1.86              0.454           1.8      6.31       0.744           1.35          2.45
Log [TN] (mg/L)                                  0.259              0.102        0.256         0.8     -0.129          0.131          0.39
TSS Load (kg/6 Minutes)                          0.696               6.57       0.0165        698    0.00111        0.00537          0.461
TP Load (kg/6 Minutes)                        0.00169             0.0133     0.000143        1.29 0.0000142      0.0000558        0.00152

Total Developed Catchment - Mitigated                                                                   "B07056 Developed Total Mitigated.sqz"

                                               Sources           Residual Load     % Reduction
Flow (ML/yr)                                               108                84.8        21.5
Total Suspended Solids (kg/yr)                           12700                4160        67.3
Total Phosphorus (kg/yr)                                  30.9                16.1        48.1
Total Nitrogen (kg/yr)                                     220                 143        35.3
Gross Pollutants (kg/yr)                                  1490               0.105          100

B07056 Developed Total Mitigated - Receiving Node - Flow-Based Sub-Sample Statistics
Inflow                                       mean      standard deviation   median   maximum            minimum    10 percentile 90 percentile
Flow (cubic metres/sec)                      0.0102          0.0704        0.00289     4.71               0.001      0.00124       0.00704
TSS Concentration (mg/L)                      11.1            9.04           8.62       281                4.46        7.85          13.7
Log [TSS] (mg/L)                             0.995           0.168           0.935     2.45                0.65        0.895         1.14
TP Concentration (mg/L)                      0.083           0.0313         0.0734     1.36              0.0444       0.0688        0.101
Log [TP] (mg/L)                               -1.1           0.104           -1.13     0.133              -1.35        -1.16        -0.995
TN Concentration (mg/L)                       1.24           0.232           1.15      4.91               0.373        1.03          1.59
Log [TN] (mg/L)                              0.0865          0.0745         0.0599     0.691             -0.428       0.0131        0.202
TSS Load (kg/6 Minutes)                      0.184            2.35         0.00869      219             0.00174      0.00428        0.0363
TP Load (kg/6 Minutes)                     0.000706         0.00754       0.0000749    0.564           0.0000229    0.0000348     0.000257
TN Load (kg/6 Minutes)                      0.00623          0.0512        0.00119     3.91             0.000152    0.000496       0.00399
Gross Pollutant Load (kg/6 Minutes)       0.00000469       0.000286            0      0.0515                0            0             0

B07056 Developed Total Mitigated - Receiving Node - All Data Statistics
Inflow                                        mean      standard deviation    median   maximum          minimum    10 percentile 90 percentile
Flow (cubic metres/sec)                     0.00269           0.0359       0.00000064    4.71               0            0         0.00363
TSS Concentration (mg/L)                       6.13            8.31            6.74       345               0            0            11.7
Log [TSS] (mg/L)                              0.863           0.328            0.93      2.54            -0.928       0.363           1.08
TP Concentration (mg/L)                      0.0601           0.0844          0.0699     4.11               0            0          0.0972
Log [TP] (mg/L)                               -1.11           0.216            -1.13     0.614            -2.43        -1.28        -0.897
TN Concentration (mg/L)                       0.811           0.688            1.03      9.65               0            0            1.54
Log [TN] (mg/L)                              0.0743           0.125           0.0392     0.984           -0.739      0.00164         0.232
TSS Load (kg/6 Minutes)                      0.0475            1.19        0.00000101     219               0            0           0.011
TP Load (kg/6 Minutes)                      0.000183         0.00383         2.18E-08    0.564              0            0        0.0000951
TN Load (kg/6 Minutes)                      0.00163           0.0261       0.000000348   3.91               0            0          0.0016
Gross Pollutant Load (kg/6 Minutes)        0.0000012        0.000145             0      0.0515              0            0             0

                                               Sources           Residual Load    % Reduction
Flow (ML/yr)                                        108                 84.8         21.5
Total Suspended Solids (kg/yr)                    12700                4160          67.3
Total Phosphorus (kg/yr)                           30.9                 16.1         48.1
Total Nitrogen (kg/yr)                              220                 143          35.3
Gross Pollutants (kg/yr)                           1490                0.105          100




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\MUSIC\B07056 MUSIC Results.xls

Page 60

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



                                       APPENDIX E:

                        WATER BALANCE MODELLING




B07056.W-01A.doc

Page 61

                                                                                                                                                                                    Appendix E




RSL Care, Cooroy

Title:                                   Water Balance - Area Calculations
Job:                                     RSL Care, Cooroy
Filename:                                H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\[B07056 Area Calculations.xls]Water Bal - Areas Layout 2
Date:                                    26/09/2007
By:                                      KU

Enter values in blue

Existing Site

Catchment                                  Catchment Area          Catchment Area           Cv
                                                m2                       ha
Total Site Area                                95100                    9.510              0.30
RSL Care Brief - Site Area                                              9.508

Developed Site

Catchment                                  Catchment Area          Catchment Area           Cv
                                                m2                       ha
Total Site Area                                95100                    9.510              0.49


Mitigated Site

Catchment                                  Catchment Area          Catchment Area           Cv
                                                 m2                      ha
ILU Roofs                                      22474                    2.247               0.9
Village Centre Roof                              821                    0.082               0.9
Apartment 2 (West)                              1397                    0.140               0.9
Apartment 1 (East)                              1502                    0.150               0.9
RAC Building                                    3779                    0.378               0.9
Total                                          29973

Note:
Volumetric Coefficient of Runoff (Cv) values adopted from:
Table 4.11.1 "Pine Rivers Shire Council Design Manual. Design Standards - Part 2 - Drainage - Section 4 - Design Standards. January 2005".

Developed Site Calcs
                                                  Area               # ILUs (Lots)   Average 'Lot' Size        Cv         Weighted Cv Calcs
                                                  m2                                       m2
Residential Area                                 62893                    118              533                0.50             31447
Residential Aged Care                            15525                                                        0.50             7763
Apartment 1 (East)                               4282                                                         0.50             2141
Apartment 2 (West)                               3305                                                         0.50             1653
Village Centre                                   2132                                                         0.50             1066
South Basin                                      4136                                                         0.35             1448
North Basin                                      3108                                                         0.35             1088
Area Check                                       95381                                                                          0.49          Weighted Cv

Areas from "CV AREAS" on                                        "H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Acad\X_B07056_BASE.dwg"
Virtual 'Lot' size is within 'Residential A' of PRSC Table 4.7.3, therefore Cv = 0.50 applied to this area.

ILU Roof Areas
ILU Type                                          m2                      # of             Total
A                                                 169                      44               7436
B                                                 178                      17               3026
C                                                 200                      39               7800
D                                                 234                      18               4212
                                                                                           22474

Other Buildings                                                                             m2
Royal Aged Care (North)                                                                    3779
Apartment 1 (East)                                                                         1502
Apartment 2 (West)                                                                         1397
Village Centre                                                                             821
                                                                                           7499
All Buildings on site
                                 Total                                                     29973


Housing Clusters
                                                                                                          House Type numbers
ILU Rainwater Tank Catchment             North or South Dam           No. of ILU's       Tank Size              A                B                  C       D    Total Roof Area
                                                                                           (kL)                  #                #                  #      #    m2
North                                    North                            37                250                 16                3                 13      5                7008
Central                                  South                            13                 39                  6                2                  3      2                2438
South                                    South                            68                350                 22               12                 23      11              13028
                                                                          118

EP Calculations
Catchment                                        ILU's                  EP/ILU              EP              Roof Area
                                                                                                               m2
North                                             37                       1.5             55.5                    7008
Central                                           13                       1.5             19.5                    2438
South                                             68                       1.5             102                    13028
RAC                                               120                       1              120                     3779




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\B07056 Area Calculations.xls

Page 62

                                                                                                                              Appendix E


 Rainwater Tank Sizing
 Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\[Rainwater Tank Usage - North N3 - MS 071018.xls]Data En
 Date:     22/10/2007
 By:       MS

 Note:     Water Balance model for Northern Tank area


 Northern Catchment
 Model Start Date                                                 Domestic Usage Variables
 Start Year                           1928                        Equivalent Persons (EP)                              85.5
 Start Month                           1                          Daily EP Consumption (L/EP/day)                      240
 Start Day                             1                          Daily Household Use (L/day)                         20520

                                                                                                                                 RWT Usage
 Roof Details                                                     Breakdown of Domestic Use              %          RWT Use        (L/day)
 Roof Area (m2)                       8510                        External                              30%           y             6156
 % of Roof Draining to Tank           100%                        Toilets                               20%           y             4104
 Coefficient of Runoff                 0.9                        Laundry                               15%           y             3078
 1st Flush Depth (mm)                  0.3                        Hot Water                             20%                           0
                                                                  Kitchen / Bathroom                    15%                           0
 Rainwater Tank Details                                           TOTAL RWT Use                         100%                       13338
 Tank Volume (L)                      250000                      Mains Usage (L/day)                                               7182
 Dead Storage (L)                     12500
 Min Storage (L)                      13338                       Landscaping Water Usage Details
 Start Storage (L)                    125000                      Irrigation Rate (mm/m2/week)                              25
                                                                  Irrigation Rate (mm/m2/day)                             3.57
                                                                  Irrigation Area (m2)                                    9140

                                                                  Daily Irrigation Volume (L)                            32643
 Results
 Average Yearly Rainfall (mm)         1576                        External Use Variable
 Average Yearly Runoff (ML)           12.08                            Option 1      Always On                                       y
 Average Yearly Rainwater Usage (ML    6.89                            Option 2      Off when Raining
                                                                       Option 3      Off when Storage is Too Low
 Average Rainwater Supply                                              Option 4      Off when Raining or Storage is Too Low
 as % of Demand                        57%                             Option 5      Always Off




                                                                     !st Flush
                                                                         2%

                                                                                                Domestic Use
                                                                                                   19%




                     Landscape Use
                         38%




                                                                                           Overflow
                                                                                             41%




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\Rainwater Tank Usage - North N3 - MS 071018

Page 63

                                                                                                                                 Appendix E


 Rainwater Tank Sizing
 Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\[Rainwater Tank Usage - Central C1 - MS 071019.xls]Data
 Date:     22/10/2007
 By:       MS

 Note:     Water Balance model for Central Tank area


 Central Catchment
 Model Start Date                                                 Domestic Usage Variables
 Start Year                            1928                       Equivalent Persons (EP)                              19.5
 Start Month                            1                         Daily EP Consumption (L/EP/day)                       240
 Start Day                              1                         Daily Household Use (L/day)                          4680

                                                                                                                                     RWT Usage
 Roof Details                                                     Breakdown of Domestic Use              %          RWT Use            (L/day)
 Roof Area (m2)                       2438                        External                              30%           y                 1404
 % of Roof Draining to Tank           100%                        Toilets                               20%           y                  936
 Coefficient of Runoff                 0.9                        Laundry                               15%           y                  702
 1st Flush Depth (mm)                  0.3                        Hot Water                             20%                               0
                                                                  Kitchen / Bathroom                    15%                               0
 Rainwater Tank Details                                           TOTAL RWT Use                         100%                            3042
 Tank Volume (L)                      39000                       Mains Usage (L/day)                                                   1638
 Dead Storage (L)                      1950
 Min Storage (L)                       3042                       Landscaping Water Usage Details
 Start Storage (L)                    19500                       Irrigation Rate (mm/m2/week)                                   0
                                                                  Irrigation Rate (mm/m2/day)                                 0.00
                                                                  Irrigation Area (m2)                                           0

                                                                  Daily Irrigation Volume (L)                                   0
 Results
 Average Yearly Rainfall (mm)          1576                       External Use Variable
 Average Yearly Runoff (ML)            3.46                            Option 1      Always On                                           y
 Average Yearly Rainwater Usage (ML    0.90                            Option 2      Off when Raining
                                                                       Option 3      Off when Storage is Too Low
 Average Rainwater Supply                                              Option 4      Off when Raining or Storage is Too Low
 as % of Demand                        53%                             Option 5      Always Off




                                                                     !st Flush
                                                                         2%




                                                                                                    Domestic Use
                                                                                                       26%




                                  Overflow
                                    72%




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\Rainwater Tank Usage - Central C1 - MS 071019

Page 64

                                                                                                                              Appendix E


 Rainwater Tank Sizing
 Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\[Rainwater Tank Usage - South S3 - MS 071019.xls]Data E
 Date:     22/10/2007
 By:       MS

 Note:     Water Balance model for Southern Tank area


 Southern Catchment
 Model Start Date                                                 Domestic Usage Variables
 Start Year                           1928                        Equivalent Persons (EP)                              129
 Start Month                           1                          Daily EP Consumption (L/EP/day)                      240
 Start Day                             1                          Daily Household Use (L/day)                         30960

                                                                                                                                 RWT Usage
 Roof Details                                                     Breakdown of Domestic Use               %         RWT Use        (L/day)
 Roof Area (m2)                       14425                       External                               30%          y             9288
 % of Roof Draining to Tank           100%                        Toilets                                20%          y             6192
 Coefficient of Runoff                 0.9                        Laundry                                15%          y             4644
 1st Flush Depth (mm)                  0.3                        Hot Water                              20%                          0
                                                                  Kitchen / Bathroom                     15%                          0
 Rainwater Tank Details                                           TOTAL RWT Use                          100%                      20124
 Tank Volume (L)                      350000                      Mains Usage (L/day)                                              10836
 Dead Storage (L)                     17500
 Min Storage (L)                      20124                       Landscaping Water Usage Details
 Start Storage (L)                    175000                      Irrigation Rate (mm/m2/week)                              25
                                                                  Irrigation Rate (mm/m2/day)                             3.57
                                                                  Irrigation Area (m2)                                    6430

                                                                  Daily Irrigation Volume (L)                            22964
 Results
 Average Yearly Rainfall (mm)         1576                        External Use Variable
 Average Yearly Runoff (ML)           20.47                            Option 1      Always On                                       y
 Average Yearly Rainwater Usage (ML    9.22                            Option 2      Off when Raining
                                                                       Option 3      Off when Storage is Too Low
 Average Rainwater Supply                                              Option 4      Off when Raining or Storage is Too Low
 as % of Demand                        58%                             Option 5      Always Off




                                                                     !st Flush
                                                                         2%

                              Landscape Use
                                  23%                                                               Domestic Use
                                                                                                       22%




                                                               Overflow
                                                                 53%




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\Rainwater Tank Usage - South S3 - MS 071019

Page 65

                                                                                                                                Appendix E


 Rainwater Tank Sizing
 Filename: H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\[Rainwater Tank Usage - RAC R1 - MS 071019.xls]Data En
 Date:     22/10/2007
 By:       MS

 Note:     Water Balance model for RAC Tank area


 RAC Catchment
 Model Start Date                                                Domestic Usage Variables
 Start Year                           1928                       Equivalent Persons (EP)                              120
 Start Month                           1                         Daily EP Consumption (L/EP/day)                      180
 Start Day                             1                         Daily Household Use (L/day)                         21600

                                                                                                                                    RWT Usage
 Roof Details                                                    Breakdown of Domestic Use              %          RWT Use            (L/day)
 Roof Area (m2)                       3779                       External                              30%                               0
 % of Roof Draining to Tank           100%                       Toilets                               20%             y               4320
 Coefficient of Runoff                 0.9                       Laundry                               15%             y               3240
 1st Flush Depth (mm)                  0.3                       Hot Water                             20%                               0
                                                                 Kitchen / Bathroom                    15%                               0
 Rainwater Tank Details                                          TOTAL RWT Use                         100%                            7560
 Tank Volume (L)                      50000                      Mains Usage (L/day)                                                  14040
 Dead Storage (L)                      2500
 Min Storage (L)                       7560                      Landscaping Water Usage Details
 Start Storage (L)                    25000                      Irrigation Rate (mm/m2/week)                                   0
                                                                 Irrigation Rate (mm/m2/day)                                 0.00
                                                                 Irrigation Area (m2)                                           0

                                                                 Daily Irrigation Volume (L)                                   0
 Results
 Average Yearly Rainfall (mm)         1576                       External Use Variable
 Average Yearly Runoff (ML)           5.36                            Option 1      Always On
 Average Yearly Rainwater Usage (ML   1.71                            Option 2      Off when Raining
                                                                      Option 3      Off when Storage is Too Low
 Average Rainwater Supply                                             Option 4      Off when Raining or Storage is Too Low
 as % of Demand                       22%                             Option 5      Always Off                                          y




                                                                    !st Flush
                                                                        2%




                                                                                                      Domestic Use
                                                                                                         32%




                              Overflow
                                66%




H:\B07\050-099\B07056 - RSL Care Cooroy.WW\Misc\Water Balance\MS_071018\Rainwater Tank Usage - RAC R1 - MS 071019

Page 66

Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village



                                       APPENDIX F:

                   INFORMATION ON STORMWATER360
                      ENVIRONMENTAL PRODUCTS




B07056.W-01A.doc

Page 67

 

 

The Enviropod®

An Enviropod Filter is a gully pit insert
designed to be easily retrofitted into new and
existing stormwater gully pits, requiring no
construction and no land take.

Located at the source of stormwater
contaminates the Enviropod Filter has
interchangeable filters ranging from 200
micron to 1600 micron pore size.

Independently trialed and tested by City
Councils throughout Australia and New
Zealand and with installation of over 7,000
units including North Amcrica, the Enviropod
Filter s the ultimate gully pit insert.

Enviropod features are;

« Captures trash, solids and other pollutants as runoff enters the storm drain

system

¢ Very robust and fail safe design with easy access that is maintenance friendly.

 

¢ Bypasses high flows with no moving parts during peak storm events.

e Available in a range of sizes to suit pits from 450mm to 1200mm being either

square, rectangular or round with a minimum depth of 300mm

© Flexible and adjustable design fits multiple style of pits

Enviropod Specifications;

 

Size EP 675 x 450 EP 450 x 450
Pitt Width 600-700 350-460

Pitt Length 380-600 400-460
Treatable Flow up to 10L/s up to 10L/s
Bypass Capacity 55L/s 38L/s

 

 

Filter bag

The filter Bag is a polyester 200 micron monofilament material which is precision
woven. The filter medium has a smooth and slippery surface which allows filtered
sediments to be easily washed from the filtration surface. In a high flow situation, this
will serve as a self cleaning mechanism

 

 

Size EP 675 x 450 EP 450 x 450
Open area 45% 5%
Thread Diameter 105 micron 105 Micron
Weight 75 g per nf 75 gper nt
Head Loss

AtlILs 19mm 22mm

* Based on bag @ 2/3 full. Head loss determined by lab testing of filter fabric. (Tonkin &: Taylor)

 

Sediment Removal

Particle Range ALIs 12L/s 20L/s
500-10,000 100 100 99
100-500 7 100 6
0-100 23 4 18

* Figures from ARC Lab testing 2003 using artificial sediments, (Tonkin & Te ‘aylor)
Storage Volume 0.155 m3 0.114 m3
Screening Area 1.848m2 1.488m2

* Figures from ARC 2003 Oakley Creek trial, (Tonkin & Taylor)

Enviropod Cage Option 1 Fabricated hot dip galvanized mild steel
Option 2 Fabricated 304 grade stainless stee!

Filter Box Option 1 Fabricated hot dip galvanized mild steel
Option 2 Fabricated 304 grade stainless steel

Components Diaphragm seal; Recycled HDPE, UV Stabilised

Stainless steel bag support ring, Fabricated 304
grade stainless steel

 

 

Page 68

                    Overview of Ingal Music Nodes


Introduction
This Overview briefly describes how the Ingal Music nodes have been developed. The
majority of the results have come from flow proportional upstream down stream
sampling over numerous locations. Influent Event Mean Concentrations (EMC) and
Effluent Event Mean Concentrations have been imputed into the generic treatment node
transform functions. Supporting this paper is a series of documents detailing the exact
experimental procedure used in each study.


StormFilter Node (Zeolite/Perlite).
Sizing.
                                                                                                               Figure 1: Portland Submittal Influent/Effluent Relationship
Each StormFilter cartridge has a treatable flow rate of 0.95 l/sec. When sizing a                                        Source: City of Portland Submittal 2002
StormFilter in MUSIC set the high flow by-pass at the number of Cartridges x 0.95 l/sec.

Suspended Solids
The transfer function for suspended solids for the StormFilter node has been imputed
from the results of the “The Portland Submittal”. This paper details the results from 5
separate StormFilters. Figure 1 shows the influent / effluent relationship developed in the
paper.

Also attached as supporting information is the paper; “Total Suspended Solids (TSS)
Removal Using Different Particle Size Distributions with the Stormwater Management
StormFilter”. The particle size distribution in Stormwater is highly variable and greatly
affects the performance of the treatment device. This paper details Laboratory testing of
the StormFilter with different particle size distributions of synthetic sediment.

Total Phosphorous

The transfer function for total phosphorus has been developed from sampling 9 different
StormFilters over 55 storms. The results are detailed and discussed in the paper “The
Stormwater Management StormFilter Performance for Removal of Total Phosphorus”.
The Influent / Effluent relationship was developed through liner regression of the 55
storms as shown in figure 2 below.



                                                                                                                Figure 2: Influent TP vs. Effluent RP Linear Regression
                                                                                              Source: The Stormwater Management StormFilter Performance for Removal of Total Phosphorus

Page 69

Total Nitrogen.                                                                             Suspended Solids
The paper “Evaluation of the Stormwater Management StormFilter system for the               The Enviropod 200 node has a transfer function developed from the “Wairau Road Trial”
Removal of total nitrogen: Kearny Mesa Maintenance Station case study” details the          paper. Figure 4 details the efficiency of a 100micron filter bag at different influent
performance of the StormFilter with a zeolite/perlite filter media mixture.                 EMC’s




                  Figure 3: Influent Total nitrogen vs. Effluent Total Nitrogen                               Figure 4: Upstream EMC vs. Event Contaminant Removal
         Source: Evaluation of the Stormwater Management StormFilter® system for the                                         Source: Wairau Road Trial
            Removal of total nitrogen: Kearny Mesa Maintenance Station case study
                                                                                            The efficiency of the 200 micron filter is approximate 10% less than the 100 micron filter
                                                                                            therefore the transform function has been reduced by 10%.
Gross Pollutants
It is assumed that the StormFilter will capture all particles over 5mm in size unless in    Also attached as supporting information, is the report “Auckland Cities Field and
bypass.                                                                                     Laboratory testing for Stormwater Catch Pit Filters”. This paper details a laboratory test
                                                                                            of an Enviropod 200 and shows there is approximate 10% reduction if a 400 micron
Enviropod Filter                                                                            screen is used. Figure 5 details the performance of the Enviropod with different particle
                                                                                            size distributions. The Enviropod 200 was tested up to 20 l/sec; a conservative value of
Sizing                                                                                      10 l/sec was therefore adopted as the treatable flow rate (see Enviropod Sizing).
There are two Enviropod nodes one for the GPT bag and one for the 200 micron filter.
For the 200micron Enviropod it is assumed that that the treatable flow rate (TF) of the
systems is 10 l/sec. For the GPT bag is assumed the TF is 50l/sec. When first installed
the systems have a much higher rate however the values are conservatively adopted as it
will eventually fill and clog.

Ingal’s research has shown that are approximately 4 Enviropods per hectare of residential
land use and approximately 5 for Commercial land use.

Page 70

                                                                                              modeling for the same catchment it was estimated the Enviropod 200 removal
                                                                                              efficiencies for nutrients were 40% for Total Phosphorous and 21% for Total Nitrogen.
                                                                                              The transform function for Nitrogen and Phosphorous for the Enviropod 200, has these
                                                                                              percentage removals as a linear relationship between influent concentration and Effluent
                                                                                              concentration.

                                                                                              The estimated removal efficiency of the Enviropod 200 is consistent with testing of the
                                                                                              CDS by the CRC which showed the CDS removed 30% Phosphorous and 13% Nitrogen.
                                                                                              The Enviropod 200 has a higher removal of nutrients than the CDS because it captures
                                                                                              finer particles and holds the retained material dry which prevents decomposition and
                                                                                              release of the nutrients, which was observed in the CRC study.

                                                                                              It is assumed an Enviropod GPT will perform the same as a generic GPT.

                                                                                              Buffa Tank
                                                                                              Buffa tank is an attenuation device. Attenuation is reduction of the peak flow of a storm.
                                                                                              Attenuation can greatly reduce the size of your treatment device. To simulate the effect
                                                                                              of the Buffa tank is suggested a sedimentation basin node be used. It is suggested that a
                      Figure 5: Sediment Removal by the Enviropod 200                         high flow bypass value be determined for the Buffa tank and the overflow weir be set to a
      Source: Auckland Cities Field and Laboratory testing for Stormwater Catch Pit Filters   width of 0m. The depth of the Buffa tank should correspond to the extended detention
                                                                                              depth. If it is indented for the Buffa tank to be used as pre-treatment a sump can be
                                                                                              added to the tank and the permanent pool volume calculated.
For the Enviropod GPT, It is assumed the system will perform the same as the generic
GPT node in relation to suspended solids
                                                                                              Effective Impervious Area
Gross Pollutants.
                                                                                              An important consideration when constructing your model is the effective impervious
The Enviropod has been tested at the University of South Australia to determine the           area terminology used for modeling in MUSIC. Effective impervious area is the directly
hydraulic and gross pollutant capture efficiency. The attached paper “Evaluation of           connected impervious area. It is a measure of the area of land that is directly connected
Gully Pit Inlet Litter Control Systems” details the results of the testing. The study         to the stormwater drainage system
showed the Enviropod captured 100%of gross pollutants up to 100 l/sec approach flow
for a gross pollutant bag. This result has been used to assume the treatable flow rate of     Table 2.2 gives an estimation of the percentage effective impervious area to the overall
the GPT bag as 50 l/sec. (See Enviropod Sizing)                                               total impervious area. The total impervious area is generally determined from analysis of
                                                                                              the proposed development layout and/or GIS and aerial images. For instance, an urban
It is assumed the Enviropod 200 will capture 100% of particles over 5mm unless the            catchment with 50% total impervious area has an effective impervious area for MUSIC
system is in bypass.                                                                          of 16%, i.e. being 31% of 50%.
                                                                                                                Urban           Commercial       Industrial       Rural            Forested
Nutrients.                                                                                                      Residential                                       Residential
                                                                                              Effective
The performance of the Enviropod in removing Nitrogen and Phosphorus has been                 Impervious Area   31              50               76               55               0
determined by a field study of the retained material in the Enviropods and corresponding      as a
3rd party modeling. Nitrogen and Phosphorous are transported in Stormwater in large                               Table 1: MUSIC Pervious and Impervious Area Parameters
                                                                                                         Source: Guidelines for Pollutant Export Modeling in Brisbane Version 7 - Draft
and small particles. Unfortunately conventional water sampling techniques do not tend to
sample large particles such as leaves. Large organic particles contain Phosphorous and
Nitrogen. The paper “Contaminate Investigation in Blackbutt Creek” details a 12month
study of nutrient capture in 80 Enviropods. Comparing the results with the third party

Page 71

Summary
Attached is a CD containing the Ingal MUSIC nodes some examples and supporting
information. Additional testing information has been provided for reference. These
nodes represent the current level of testing of Ingal products. Stormwater Management
Inc and Ingal Environmental Services is continuing field testing and monitoring of our
devices. As these results become available new updates of the music nodes will be
released. Log on and register at www.ingalenviro.com to receive these future updates.

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

B07056.W-01A Complete - Stormwater [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.