B07056.W-01A Complete - Stormwater [As Published] · 132007.2398
Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village
Table 5.1: Stormwater Detention Basin Concept Details
Basin Details Northern Basin Southern Basin
Detention Storage1 1940m3 1640m3
Min. Detention Level RL 99.60m RL 101.50m
Embankment Level RL 101.00m 103.00m
Detention Area1 2200m2 1980m2
Low Level Outlet & Invert Level2 5 x 375mm – RL 99.60m 5 x 375mm – RL 101.50m
Outlet Pit Size & Invert Level2 2.4m x 0.9m – RL 100.25m 2.4m x 0.9m – RL 102.40m
1 x 50mm – RL 99.20m 1 x 50mm – RL 101.00m
Multiple Pipe Outlet Dia
1 x 750mm – RL 99.15m 1 x 450mm – RL 101.20m
& Invert Levels2
1 x 825mm – RL 99.15m 2 x 525mm – RL 101.20m
Overflow Weir Width 4m 3.75m
Overflow Weir Level RL 100.70m RL 102.5m
1 - Details based on Overflow Weir Level.
2 – Refer to Outlet Structure details on Drawing No. B07056-SK08 in Appendix A.
Note: Concept details subject to final design.
5.2 Mitigated Scenario Results
The mitigated scenario model was created by entering the storage characteristics and stage discharge
relationships of each detention basin into the developed scenario model. All ARI storms and durations
previously listed were modelled. Results for the mitigated scenario and comparison to the existing site peak
discharge rates are detailed in Table 5.2.
Table 5.2: Comparison of Existing and Mitigated Scenario Peak Discharge Results
Northern Basin Southern Basin
ARI Storm Event Change in Change in
Existing Mitigated Existing Mitigated
Peak Flow Peak Flow
2 Year 1.12 0.94 -0.18 0.95 0.95 0
5 Year 1.56 1.47 -0.09 1.32 1.16 -0.16
10 Year 1.82 1.76 -0.06 1.54 1.28 -0.26
20 Year 2.16 2.13 -0.03 1.83 1.68 -0.15
50 Year 2.62 2.43 -0.19 2.22 2.13 -0.09
100 Year 2.91 2.69 -0.22 2.46 2.46 0
Results indicate that both basins are effective in reducing the increase in peak discharges from the development
back to existing flows. Maximum Water Surface Levels (WSL) in the Northern and Southern detention basins
during the peak 100 year ARI storm are 100.72m and 102.71m respectfully. This indicates that a minimum
freeboard of 300mm to the top of each basin’s embankment can be achieved.
For the Southern Basin, discharge across the overflow weir is limited to a depth of 210mm. The velocity depth
product (V.D) of the flow over the weir is 0.16m2/s. Both depth and V.D are in accordance with QUDM. While no
discharge across the Northern Basin overflow weir occurs for the 100 year ARI storm, a weir is provided to
control overflow should such an event occur. Please note the sag in the accessway is flatter and wider than the
weir. Therefore, the V.D product will be lower than QUDM requirements.
B07056.W-01A.doc Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B07056.W-01A Complete - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.