B07056.W-01A Complete - Stormwater [As Published] · 132007.2398
Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village
Table 6.4: General Properties of Bio-filtration Basin and Pod treatment nodes
Treatment Node
Property
Bio-Filtration Basins Bio-Filtration Pods
Filtration Depth (m) 0.6 0.6
Ponding Depth (m) 0.4 0.25
Filter Media Sand Sand
Filter Median Particle
0.7 0.7
Diameter (mm)
Saturated Hydraulic
360 360
Conductivity (mm/hr)
Seepage Loss
0 0
(mm/hr)
Default k and C* values have been adopted for each Basin and Pod node.
The Wetland and Pond treatment nodes have the following properties presented in Table 6.5.
Table 6.5: Properties of Wetland and Pond treatment nodes
Treatment Node
Property
North Wetland South Wetland South Pond
Surface Areas
1202 991 216
(m2)
Extended Detention
0.4 0.2 0.5
Depth (m)
Permanent Pool
1072 630 150
Volume (m3)
Seepage Loss
0 0 0
(mm/hr)
Evaporative Loss as
125 125 100
% of PET
Notional Detention
25.2 21.1 20.2
Time (hrs)
The general properties of the rainwater tanks as modelled in the mitigated scenarios are presented in Table 6.6.
Table 6.6: Properties of Rainwater Tank treatment nodes
*Daily Demand
Tank Capacity Re-use Connections
of Re-use
North Rainwater Tank 250 kL 46.0 kL/day Toilets, Laundry, External and Irrigation
Central Rainwater Tank 39 kL 3.0 kL/day Toilets, Laundry, External
South Rainwater Tank 350 kL 43.0 kL/day Toilets, Laundry, External and Irrigation
RAC Rainwater Tank 50 kL 7.6 kL/day Toilets, Laundry
*Daily Demand sourced from Water Balance Model
B07056.W-01A.doc Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B07056.W-01A Complete - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.