Concept Stormwater Management Plan
RSL Care – Cooroy Retirement Village
7.2.2 Roof Details
All buildings within the site contribute to a total roof area of 2.91ha. For the water balance analysis it was
assumed that:
• 100% of total roof area contributing to capture. A separate piped drainage system is proposed to drain
roof runoff from ILU’s and Apartment buildings for collection in underground tanks. The RAC building
also has an underground tank at its eastern end (low side) so it is also assumed that 100% of the roof
area can drain to the tank.
• Coefficient of Runoff value of 0.9 was used as per HB 230 – 2006: Rainwater Tank Design and
Installation Handbook.
7.2.3 Usage
Variables assumed for water usage have been adopted from Maroochy Shire Council’s Integrated Water
Management Guidelines (2006). While current estimates of water consumption indicates a usage of
300L/person/day, the target of 240L/person/day represents MSC’s Planning Scheme Policy. On the basis that
efficient water use is proposed within this development, the reduced usage rate has been adopted. For the
Residential Aged Care building, usage was assumed to be lower at 180L/person/day.
Occupancy of 1.5 persons/dwelling has been adopted for the ILU’s and Apartment buildings according to The
Noosa Plan for Retirement or Special Needs Housing giving a total daily use of 360 L. For the Residential Aged
Care building, an occupancy of 120 persons was adopted based on the number of beds proposed. As per the
Maroochy guidelines, the proportions and breakdown of rainwater use per dwelling is indicated in Table 7.2.
Table 7.2: Breakdown of Total Water Usage
Use Proportion of Total Use Rainwater Tank Use (L/day)
External 30% 108
Toilets 20% 72
Laundry 15% 54
Hot water 20% Not applied
Kitchen / Bathroom 15% Not applied
Total 100% ( = 360 L) 234
An irrigation rate of 25mm/m2/week has been assumed landscaping areas around the apartment, residential
Aged Care and Village Centre Community Buildings. A total of area of 1.56ha is proposed for irrigation.
7.3 Water Balance Results
7.3.1 Existing & Developed Scenarios
To calculate the runoff generated by the site for the existing and developed scenarios, Average Volumetric
Runoff Coefficients (AVRC’s) were used in combination with the site 30 year daily rainfall data. AVRC’s of 0.30
and 0.49 were used for the existing and developed scenarios respectively. The resultant Average Annual Runoff
Volumes (AARV’s) for the two scenarios are presented below in Table 7.3.
B07056.W-01A.doc Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B07056.W-01A Complete - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.